Typical PPR for electrical installation work. Folding project for electrical installation robots

Yakіsny montage electrical wiring consists of a number of important steps. The first and most important stage is the folding of the project electrical installation robots, in an ideal way, as the project is stored in all kinds of work with tying to furniture that butovim priladov. Another no less important stage is the study of the quantity of materials and the selection of the most electrical engineering manufacturers from the above post-workers. І the third main and the most laborious stage - without interruption of assembly work, which in its turn is divided into two stages:

1. Wiring of the so-called "black work", installation of fixed openings and cable laying;

2. Mounting lighting fixtures, rosettes and vimikachiv after vikonannya ozdoblyuvalnyh robit

About the nuances when folding the project of electrical installation work and especially the folding of the troch is more detailed.

For the project, it is necessary to clearly present the layout of the furniture and the main electrical appliances. In the kitchen, it is necessary to clearly show the installed space work surfaces, stoves, hoods, ovens, refrigerators and micro-furnaces, etc. So, for example, not zbіg sockets with real roztashuvannyam elektropriladіv brought to the point of innocence when connected, zіpsovanu old-fashioned look When extending the wires of the furniture, as well as the addition of the problem of electric flickering and burning, if there are any other windings, especially when connecting the hard electric appliances.

All hardwired electrical accessories and sockets on the working surface and plugged into the surrounding lines and automatic switches. Refrigerator, although it is possible to keep a little tightness in the oven with other accessories, or you can also connect to the okremium vimikach. It’s handy when you leave the house, you can turn on all the automatics, except for the refrigerator.

In the kitchen, there is a change of sockets for stationary electrical appliances, it is also necessary to transfer sockets over the working surface (style) and one or two sockets for cleaning or other needs. Above the working surface, ring out at least 3-4 sockets. This is due to the great number of electrical appliances in the kitchen. Also, a frame with rosettes above the stylnitsa can be placed as a lightening of the working surface, as if it was transferred to the lighting plan.

The plan of lighting is provided from the area of ​​the kitchen, the working area and the reception area, as well as additional electrical wiring for light-emitting furniture. Lighting is mounted at the bottom of the hanging wardrobe and provides additional lighting for the working surface, as well as for a decorative function.

When putting together a project for a bedroom or a living room, as a rule, it is necessary to pay special attention to the installation of a TV set and an air conditioner for laying the necessary cables. Properly roztashuvannya sockets allow you to attach cables to the TV and other attachments, both when installing the TV on the cabinet, and when installing it. When hanging a TV set above the pedestal, two rows of sockets can be installed, the lower row can be used for connecting tuners to acoustic systems and set-top boxes and mounted behind the pedestal. And the upper row of sockets is mounted behind the TV and includes a 220 V socket, Internet and TV, and one empty socket itself, to serve as a connecting channel between the upper and lower rows, for connecting additional wires. Vidpovidno in the bottom row to fight like that herself empty socket and during installation, a pipe is laid between them, in which the dust will be buried. To connect the air conditioner, as a rule, an electric winder is installed at the point of connection of the indoor unit, and when installing the air conditioner, the installer is installed in the middle of the unit.

Dodatkovo need to install sockets for connecting other electrical appliances, for a sawmill chargers, and for the availability of heat inputs, prepare an installation opening and wire for connecting the thermostat. A corrugated tube is also brought up to the opening for the thermostat, as it descends into the room, where the temperature sensor will be ripped. When connected to a WiFi router, it is necessary to supply 220 V and “twisted pair” to the installation site. Varto indicate that the cable for connecting to the Internet needs to be laid in the place where the router is installed to the skin spigot. I route of laying the Internet and TV cable should be laid okremo from power wires for the unique appearance of a transition from the electromagnetic field of electric cables.

To connect to the intercom, I will attach a signal cable to connect the button and the camera with a microphone.

I would like to thank you for the design of the electrical wiring in the bathrooms. Here it is necessary to remember about increased water content and, as a rule, sockets and lamps, which are located near the places of elevated water, it is necessary to install water protection. As for the placement of sockets and vimikachiv, then the sockets need to be used for a razor or a hair dryer for a washbasin from a mirror. If there is an electric dryer for towels, then it is necessary to change the socket in the room of the installation. It is also necessary to transfer electric wires to the air outlet to connect the fan and to switch the mirror over the sink. For clarity, turning on the lights of the mirror can be mounted in one frame with a socket. And the volume of the main lighting near the bathroom and the toilets are spread out from the outer side, when the mother is seen in the same direction, the doors will open and roztashovuvati yogo on the other side of the window.

Rostashuvannya sockets in height often take 300 mm from the floor to the center of the outlet, sockets like rozashovuvaetsya over the pedestals or may attach other furniture, as a rule, roztashovuyat vіkhodya z rozmіrіv furniture at a height of up to 100 mm from the surface. Vimikachi roztashovuyut at a height of 900 mm, so that the stench does not bind to furniture. Bіlya lizhok їх roztashovuit lower supreme equal, and above the stiltnitsu in the kitchen and above the miyka by the bath, it’s clearer.

For clarity, the inclusion of that lighting in the long corridors, at the great kіmnats and at the gatherings, the walkways are installed on the cob and in the kіntsі kіmnati, or go down to the mountains below. Tse allow you to decorate one and the other chandelier or a group of lamps from different places. If it’s enough for two months, you can install an additional cross-cutting of vimikaci at the required amount.

If it is worth rozrahunka zakhistu electrical fittings and automatic keruvannya with them, then everything is left to fall due to the success of the deputy. Ale є osnovnі elementi zakhistu, yakі may be installed at the skin of the apartment. So, the main extension is a zahistu of short chimes and re-wandering of the droti є automatic vimikach chi “automatic”. For the protection of the air flow in the case of temporary insulation, the installation of an extension of the protective switch-on or ELV, a differential automatic switch-on function of the re-wiring of the outbuildings, is necessary. Also, you can additionally install protection against internal overvoltages, most often - the entire voltage relay, which is regulated on the switch-on at the given parameters. For the obviousness of expensive equipment, it is possible to install an attachment to the protection of the outside overvoltages (thunderstorms). Tilki, as if from a zahist in the internal overvoltage, everything was clear, then the zakhist in the zovnishnih overvoltage is necessary to resolutely protect the minds of specific minds, so that the stasis in a different variant is not the same and protect it from different equal stresses. I installed a varistor navmannya or approximately get rid of just throwing a penny into the wind.

Storing an electrical project, like choosing materials and vikonannya electrical installation work, is the most important stage of everyday life, it goes up to what is necessary. Pardons during the design and other stages wriggle later at the great window of inacceptability. To that, do not trust non-professionals with legal advice, and then everything will be fine!



So, having blown the call of an electrician-specialist, and having called my friend, who knows nothing about electrical wiring, now I spit and miserably scoff, if I’m lying in the teapot. The sockets turned out to be ill-conceived, so you don’t have to squirm with your hand and try to get it right. Until that past month, when the vimikach was short, I had a chance to hear a whole "ode" from my friend's friend, who had sung darts in one place along the diagonal. Once you change your mind, the work needs to be given to specialists.

I can’t wait for the trouble, because an okrem automatic machine is needed for the refrigerator. As a rule, when you open a refrigerator, they turn it on like that. That's why the proposition is wrong. Good for the sieve. If you need to wire the cable, then navit professionals to swear pardons. For example, at Novobudovs under the "key" to carry thin medium cables for stoves and electrical appliances. Rob everything, through the cheapness of the robot.

If you have a walkie-talkie, on a wake-up call for a cheaper vicorist, you need to conduct a smaller cut, navit as well as marking wines of 2.5 mm2, then in fact the community lived less than 40%. so on the market, when buying cheap cables, you can buy upgraded ones or from an unintelligent alloy, which may not be suitable for electrical power.

Call for the project to complete one sheet. on which and all points of connection are indicated, the place of installation of lamps, sockets and vimics, boxes. From the power of laying cables, follow the rules of the law, sound the stinks are laid on the walls at a height of 10-15 cm in the direction of the steel and wind only vertically, or horizontally, but not diagonally, how to slay the unfortunate installers.

For the article without giving a few details:
1) The author seems to have forgotten about the rose boxes. How to put kudi and skilki їх. That y vzagali now the stench is needed. Tse is important.
2) Not suitable for a refrigerator. It is not particularly practical to borrow a cellar machine for a new one. where it’s easier to get out of the house and get out of the sockets for other people. I'd use an okremy automatic machine, I'd use an electric pidlog for that oven. I speak from special certificate.
3) My pleasure. Do not hesitate to take pictures of the divorce around the apartment. Bazhano with an applied tape measure on the key of the place. A scheme is a scheme, but at the very least it’s more beautiful.
4) I namkinets. Don't worry about outlets. Bet you can and can't. Practice shows that you don't hang out.

The value of the design and installation can be chosen mounting dart, the power commitment of obov'yazkovo is necessary to be trimmed. I’ll wait for the sanitary facilities, there, even if IP up to 54 is not less, it’s life for people, and there are a lot of nuances for such savings to be more expensive.

Drive a lot.
You would have written better:











Volodymyr33777

You have a walkie talkie, drive a lot, to that article was written for prayer.
If there is a need for a line of wires, then use the PUE tables, where some wire is assigned for some kind of advancement, though it’s still necessary to support the wires in order to heat up, but it’s safe to say that people write that 1 automatic machine on the refrigerator is too late))
And if the automatic machines themselves, then it’s not right to pick up the automatic machine for the rozrahunkov’s advancement. The wire is picked up for the purpose, and the machine is put on the wire in case of overheating. If you have a medium conductor of 2.5 mm2, then if you want to connect electric devices to a new one, put more than 25A of the machine - evil! We set the sound to 16, so that a normal 16 ampere automatic machine will show 20-22A 20-30 hvilin. And 25 amps up to 30A that same hour. which is sufficient for short-hour shifts, and wires, like sockets, do not heat up to critical temperatures.

When feeding on the boxes, then put їх on 1 piece for lighting and 1 for sockets, on the equal strobe (along the lower edge) you can zmіschuvat, thus changing the profile of the gypsum board. Buti access is to blame for the rules to the boxes, but I’ve never been lucky, so they worked it up to the current boxes, soldering it, twisting it and smearing it on the wiki. for sockets, bazhano over one of the sockets, passing through a large number of wires, as it is necessary to draw from the skin + entry. Deyakі sockets can be thrown with a loop for cheaper. And vzagali ways masa, and how robiti virishuvati you.

Drive a lot.
You would have written better:
- how to rozrakhovuєtsya navantazhennia on the skin rosette;
- lay some kind of wire for laying (when attaching a laying (gypsum laying, etc.), with an open laying in wooden booth, When laying in the middle of the wall under the plaster);
- some kind of wire to win the first hour of laying the line to the automatic machines;
- advantages and shortfalls of aluminum honey dart;
- nuances with peretina drotu from midi and aluminum under the hour of laying on the same vanity;
- how to zadnuvati mid and aluminum ...
Ask you can write richly ...
If you know anyone, share your knowledge with others...
Writing for people and the number of BukAf - different speeches.

P.S. Special note: Someone you know has a heated outlet, if you turn on the lawnmower (who doesn't know - the power is 2800W).
Introductory machine 32A (new) with any beam to enter Chotiri or five Aluminum wires, skin with a cut of 2-2.5 squares and disperse throughout the whole booth. One of them walks up to the outlet to call us. She has to build in a podovzhuvach of the "Pіlot" type for five! sockets and they are plugged in: El. a water heater (1.5KW), a cleaning machine (2.5KW) and in the new (pilot-type winder) a further winder is installed by 20, which is no more than a few meters away, on the street, a lawn mower is connected.
To the question: - Aren't you afraid of burning? Vіn vіdpovіv: - Well, I remembered the automatic machine (moreover, the automatic machine is the only one), but the darts in my place still go. Tіlki vin without specifying what to do in the place of the wiring COPPER dart 2.5 squares, which shows up to 6.5 kW of power (VVGng), and not aluminium.
The people did not know and those who, when choosing aluminum rod, Yogo tovshchina, at the same time as the middle ones, will be larger by about 40% on the same cost. Tobto. if you want to lay aluminum - take an offensive, larger diameter.
We have adopted the idea to bring for midi and even if you were told that you need 2.5 square meters, and you want to lay aluminum, then for aluminum you need an offensive diameter, which we produce, then. 4 squares of shob vytrimuvav also navantazhennya.
It’s like everything is crumpled up, but in two words it’s like that.

Bude hour I will write a NORMAL article about droti and wiring.

1. "how to install on a skin socket" - sockets without grounding vitrimuyu strum 10 A (2.2 kW active quest!!!), from earthed type SCHUKO - 16A (3.5 kW of active supply!!!). Therefore, if you choose to connect to a block of 4 sockets with low-voltage accessories (up to 1 kW), then do not mess up sockets or wires with a 2.5 mm.kv. If the pressure of one attachment is 2.5 kW, then it is recommended to install a new automatic machine and lead to an individual socket or directly to the attachment.
2. "- with a wire of a kind of peretina lay (-when laying a lining (gypsum plaster, etc.), when laying a lining in a wooden booth, when laying in the middle of a wall under plaster);" - The most suitable for lighting is a cable with copper wires with a cross section of 1.5 mm2, for sockets infamous confession- 2.5 mm sq., for hard fittings, they are individually secured (the passport for fittings has some recommendations for cable breaks).
3. "- what kind of wire to beat the time of laying from the stovp to the automatic machines;" - for laying a pipe to the machine, it is most often SIP-4 2 * 16 or SIP-4 4 * 16. However, there may be a reduction in the appearance of tightness seen on the houses and the length of the lines from the LEP to the shield.
4. "- advantages and shortfalls of aluminum and copper wires;" - aluminum has one advantage - low price.
5. "- nuances with a retina drotu from midi and aluminum when laid on the same edge;" - here it is necessary to insure the passability of midi building and aluminum, as well as various active supports of these materials.
6. "- how to close copper and aluminum ..." - for the help of the Wago clamp

Chodo of your PS:
1. Zaishov to the Bosch site - lawn mowers have a power of 1.2-1.8 kW (5.5-8.2 A). In addition, do not use this attachment.
2. Long allowable cable strum plastic insulation and aluminum conductors - 21 A (GOST 31996-2012). Vihodyachi z tsogo, the machine was selected incorrectly. Mav buti at 20 a.m.
3. Heat boiler 1.5 kW (6.8 A). Pratsyuє yakiy zavzhd, less at the moment of pіdіgіvu chi reheating of the tank. Under the hour of heating the victors, not all the tension is felt.
4. Cleaning machine power of 2.5 kW (the old unit is definitely class D, strum 11.4 A). Such tension can only be reduced by turning on the TEN at 90-95 degrees Celsius.
If you take it to the point of respect, for example, the reasons for all these adjustments should be practiced at once, then it’s extremely bad for the conduct (26% overwhelm), but it’s not critical. Automatic yakbi navit standing at 20 A, all the same for a long time trimming bi tack.
Let's have a good mood, and don't worry about the wires and accessories, because once and for all, you won't get better than a cowbass for a month))))

1. "If it is necessary to cut the wires, then use the PUE tables, where a wire is assigned for some kind of advancement, truth, and also the reliability of the wire support in terms of heating and heating" - it is necessary to select wire wires from GOSTs, and not PUE. Standards in PUE 7 are indicated by averaged data (refer to the data table of PUE and GOST 31996-2012). Active Opir it is necessary to protect yourself on long trails (more than 100 m), and these are not important at private booths and apartments. It is not necessary to protect the "deposit heating" for an hour of laying the cable in a monolithic wall (div. GOST 50571.5.52-2011).
2. "And if the automatics themselves, then it’s not right to choose the automatic for the rozrahunkov’s advancement." - according to PUE "3.1.4. automatic vimics, which serve for the protection of the okremyh landers of the merezhі, in all the rivers they should choose, as far as possible, the least for the rozrakhankovi strums, these landowners or nominal streams electrical supplies, but in such a way that the equipment did not turn on the electrical installations during short-hour surges (starting streams, peaks of technological surges, streams at self-starting thinly).
3. "We sound set to 16, because the normal 16 ampere automatic machine vitrimaє 20-22A 20-30 hvilin." - an automatic machine in 16 A will work with a tension of 1.45 In with a draw of 20-60 strands (divine hour-strum characteristics of automatic machines), but also a normal yoga mode of operation. The recommended operating mode is 1.13 In.

Side 6 of 16


Vikonanny robit projectє the main document for the preparation of sampling. At a new level, all the main technical, technological, and organizational nutrition training and electrical installation work are being developed. In the "Instructions for the development of projects in the organization of everyday life and projects for the future work" (CH 47-74), the Government of the SRSR was assigned the main directive for the development of the PPR. PPR materials help installers to become aware of the design documentation, promptly prepare electrical installation materials and control the supply of possession, organization and vikonannya works. For large and folding objects, PPR is divided into specialized organizations, for all other objects - assembly trusts and management. Projects vikonannya robіt pod_lyayat on typical and іndivіdualnі, and behind the warehouse rozroblyayut more and short. Types of PPR are folded for objects of habitation, social and cultural recognition and other objects, the life of which is carried out for typical projects that are attached, or documentation of re-zastosuvannya. To establish short PPR for technically awkward objects for a small commitment. The latest PPR is expanded for great complexes budіvnitstva, scho zavoditsya for іndivіdualnymi projects іz zastosuvannyam new technical solutions. To the warehouse, whether there is a PPR, there are vimogi hanging, so that the wine will be minimal for obligatory and concrete for money. No one is to blame for the repetition of materials placed in the design documentation.
Vihіdnimi materials for the folding of the PPR itself serve as a work chair, koshtorisna documentation and a project for organizing life; data on the confirmation of the term for the supply of the main possession and materials by the deputy and the general contractor; information about the presence of machines, mechanisms and possibilities of their choice; fluffy normative documents- PUE, BNiP, safety standards, installation instructions and core materials for safety engineering. Depending on the ceremonial instructions of VNDIPEM, PPR materials are subdivided into a group of groups: dovidnik, organization and technology work on the site, material and technical security, management of the MeZ and calculation of labor costs for work in the assembly area.
The first part is made up of an explanatory note, in a kakіy vіdobrazhenі zagalnі vіdomosti schodo object that yogo characteristic short descriptionі principle diagram electrical supply with the improvement of the technological process of supply, which will be, tables of technical and economic and electrical indications - physical connections; koshtorisnoi vartosti, virobіtku, labour. At a reduced scale, the master plan is placed from the designated objects of the title list and the seen electrical engineering facilities, as well as the sewerage routes of electricity. Make a change, make changes to the worker's chair for the development of the PPR, allowance from the deputy, and, if necessary, from the design organization. Vіdom_st pіzіchіchnіv dає zagalne vyazhennya pro obyag roіt, kіlіkіst і power transformerіvіv їх installed intensity, ііlієstі elektrodvigunіv up to 1000 V and vishche z podіl pa dvigunі zminіnі ta fast strumu, complete outbuildings with a subdivision for cameras, sewers, shafi and remotes. Indicate information about pidyomno-transport attachments with a breakdown for quantity and vantageopidyomnistyu. Pererakhovuyut materials and cable products for the installation of meshes. For cables and droids, indicate tipi, Rated voltage that confession. Okremo overhaul the main, rozpodіlnі and іnshі types of bus ducts, tires and colored metal, steel and plastic pipes. At the bridge, provide data about the number of direct outbuildings; conversion units and other specialized equipment.
According to the electrical installation projects, the main technical and economic indications are to be repaired for the MEZ and the installation area. We have also distributed information about food, which is different from the project of organization of everyday life. Immediately direct, if necessary, a protocol under the robit from the various installation organizations (for example, during the installation of control and installation devices and automation). The materials of the first part are the first for all indications for planning, control and operational handling by electrical installation robots.
The other part of the organization’s food supply and technology is working on the Maidan of everyday life. The object is divided into mounting zones, for example glowing lighting, ELEKTROSTAZNYY PONAD 1000 V, MAGISTRALNIY SHINOPOVODA TO 1000 V (s otbivka for the eats Budіvnitstva) i t. d. turn on Vikhіdnі Danі for walladian grafіka Vicannya Robіt, Recommendents of Technology Mounting, scheme of Vantzhopotokіv, Vіdomіst Mehhanіv, Attasiv, Special and Specіv. For example, the other part to direct special introductions from the technology of safety and industrial sanitation, fire safety at vikonannі installation that zvaryuvalnyh robit, landfill documentation
The third part includes the limit-assembly listings for materials, electrical structures, mounting brackets, enlarged nodes and blocks. The details of the project specifics for electrical equipment and materials during the development of the PPR are specified for the working chairs of the project and are divided for the post-employees: deputy, general contractor, subcontractor organization.
The fourth part of the mission to revenge the MEZ. To bring up the number of variables from the designated quantity, vartosti and the term of preparation, as well as the calculation of labor costs on the dimensions of work, which are added up behind chairs and sketches.
The fifth part is added up from the cost calculation salary for the installation area from the data table.
Behind the great and technically collapsible objects, there are additionally short summaries, which allow you to orient yourself in the documentation of the working project and on the life of the Maidan. There are tables of volumes of the project with a breakdown by divisions and objects and a plan for a weekly maydanchik. On the plan, it is seen electrical installations and spores, which may be electrical appliances, cable and repair lines. To establish a single-line diagram of electrical supply, chair-lifting of equipment in electrical facilities, substations, workshops, a plan of bus lines and trolleys, schemes of living shields of lighting. Submitted the materials of the PPR in part to explain the practical dotsіlnіstyu vikoristannya їkh pіd h raboty at raznyh podrodіlakh montazhennyh administrіnі. For other and medium objects, the PPR materials are folded single volume, and the great and folding ones are let out in parts.
For objects with a great commitment, they work with new technological solutions at the PPR warehouse technological cards, to replace the plan-scheme of the organization of work with the applied installation of mechanisms, outbuildings, installation routes and the order of technological operations. To direct the scheme of the profit flow from the appointments of the installation, rozvantazhuvalnyh maidanchiks, openings and working areas. The map will include the introduction of mechanisms, special attachments for work, calculation of costs and wages. In them, give a short description of the installation, which is to be installed: dimensions, weight, quantity and other capacities.
Depending on the nature of the object and the minds of the assembly, the warehouse and the sequence of the distribution of materials at the PPR can be changed, which suits the line staff of the plant, as a rule, they are hired to participate in the development of the project. The orientation warehouse of the PPR was built at the addendum 1.
It should be noted that the type of possible robots adds the details of the operation of other distributions of the PPR. So, for the installation of an important busbar, we look at the tire mounting technology, the configuration of the blocks, the power supply of their transportation, the visibility of the mounting openings, the construction of the fastening along the route at the crossroads with pipelines.
Reportingly expand organizational visits for vikonannya robit at objects that are being reconstructed or expanded, de vikonannya robit is carried out in the minds dignified undertaking. Specially expand technology for quiet robots, as a way to represent folding at їх vikonannі through the presence of instructions and the novelty of technical solutions.
The warehouse of the short-term temporary storage facility transfers enough completeness of the distribution of materials, documents, the availability of which at the full temporary temporary storage facility is folded and completed. For a short-term PPR, it’s obov'yazkovo є: vіdomosti on enlarged vuzli and blocks that are prepared and zbirayutsya in the MEZ with the necessary chairs and sketches, recasting of embedded parts, opening those openings, changing before the project, specifications on materials, but with embedding completing materials and equipment for the MEZ and the assembly plant, data for the organization of work (labor costs and costs), special assistance to the rules of safety technology. Prior to the PPR, a transfer is applied with a set of priymalno-zdatkovyh documents on the object. At the PPR, direct strength at fiat instructions that rules.
For typical non-folding objects, the PPR warehouse has more space and specification. For example, for a typical substation of a residential microdistrict, the MEZ is composed of four blocks: block rozpodіlnyh outbuildings 10 kV with SWR chambers, pass-through insulators, cable jumpers and busbars to the transformer and lighting, mounted and fixed on the chambers; a block of electrical outlets 0.4 kV from switchboards with electrical equipment for electrical outlets, a bus bar and a lighting shield, a step-down transformer for living a repair lighting system and fixtures fixed on panels of a 0.4 kV switchboard; lighting block of the transformer chamber; a block of grounding outbuildings, which includes a bar'єr, posters, etc. For such preparation of steps, the selection rate of the substation reaches 90%.
Crim PPR of a one-time selection for objects, which will be for individual projects, are being developed and zastosovuyutsya types of PPR. It is important to win for typical objects and objects of life, the life of which is to conduct standard project documentation. With the method of short-term labor consumption of ITP during the creation of individual PPRs, the types of PPRs for the types of robots should be established. They have broken hot meals, characteristic for the dermal appearance of the robot, which allows the work to be done, or to prepare ready-made materials for the development of PPR for a specific object. From trust Tsentroelektromontazh Minmontazhspecialbudu SRSR take the library of PPR, which is distributed by the installation departments. Tse allows you to accumulate additional information from the preparation of robots, to win the best PPR as an example in case of їх developments and as a preliminary material in case of advanced technical and organizational nutrition. The completion of the WEP reviewing the technical council, and after the introduction of additional amendments and amendments, the head manager of the management approves. Changes to decisions made by the PPR are not allowed without a written permission from the head engineer.

Similar documents

    The salary fund, the amount of electricity and the amount of depreciation and amortization. Vitraty on overhaul. Techno-economical priming of the electric supply system and the electric drive. Vartist installation and zvedenі technical and economic demonstrations.

    course work, additions 27.07.2010

    Technology and necessary mechanisms and attachments for installation of electric boiler house. The main scheme of її electro-supply, vibir dzherela svіtla that yogo distribution. Documentation for start-up and maintenance of electric power supply.

    thesis work, donations 06/02/2015

    Select the category of electrical supply. Scheme of substations. Rozrahunok elektrichnyh navantazhen. Strum short hum. Protectors on the lines that come. Technology of virobnitstva EMP. Machines, mechanisms and tools that stop for the hour of warfare.

    course work, additions 05/08/2014

    Characteristics of the possession, which is mounted: recognition, design and principle of diy. Choice of methods of delivery and installation. Transport and vantageopidyomnі ​​mechanisms. Rozrobka plan assembly maidanchik. Rozrobka merezhego graph_elektromontazhnyh robot.

    course work, donations 08/01/2012

    Vyvchennya methods of vikonannya installation vіdkritih and prihovanih internal wiring, electric motors, start-up equipment and adjusting fittings. View of the entrance to the funeral of the practice and safety equipment for the hour of the installation of electrical work.

    from practice, additions 13.10.2014

    short description design repair and mechanical shop. Vibіr dzherel svіtla, svіtilnіnіv that mіstsya vstanovlenija osvіtlyuvalnyh shields. Recommendations on the technology of the installation of electrical installation work. Techno-economy framework for the project.

    course work, additions 05/25/2015

    A short description of the machine shop, a list of electrical equipment. The designation of the electric supply and the compensating outbuilding. Selecting a transformer at the substation Storage of records of electrical installation robots.

    course work, donations 01/17/2014

    Preparing for the process of wiring electrical work. Analysis of compensators and additional bends in the line cable, necessary for removing the mechanical stress from the clutch. Possibility of insulation and protection of the working area from atmospheric fallout and saw.

    course work, donations 03/29/2017

    Methods of rozrahunka of electric navantazhen. Rozrahunok and vibіr zhivilnoї and rozpodіlnoї ryezhі 0.4 kV. Rozrahunok and choice of place of roztashuvannya, tightness and number of transformers in the transformer substation. Organization and training of electrical installation work.

    thesis work, donations 05/22/2016

    The method of cable processing and the folding of the technical chart of electrical installation work. Determining the support of the shablіv resistors by the method of vіdrіzkіv. Safety instructions, safe methods work on the enterprises of the chemical industry

    laboratory robot, donation 01/12/2010

    Rozrahunok electric navantazhen path arranged diagrams. Compensation reactive pressure. Rozrahunok vtratuzhnosti at the transformer and relay protection. Select the voltage measure. Vartіst ekspluatatsії obladnannya, rozrahunok elektromontazhnyh robіt.

    thesis work, donations 01/20/2016

    Zagalni vіdomostі about polarization and electrical breakdown of dielectrics, about magnetization of the ferrota of ferrimagnets. Physical power of electrical insulation materials, active dielectrics and magnetic speech. Directions of technical zastosuvannya materials.

    initial help, additions 09.12.2015

    Characteristics of the enterprise "Brotherly electric company". The structure of the energy supply microdistrict. The procedure for the protection of work and safety equipment pіd h vykonanny elektromontazhnyh robіt. Rozrahunok navantazhen and electricity substation microdistrict No. 3.

    thesis work, donations 09.10.2016

    Transformer substations and their designation for transformation and distribution of electrical energy. Podіl for constructive vikonannyam. View of the substation on A-like wooden support. Organization of work and mechanization of electrical work.

    course work, donations 03/01/2017

    Exploration of the electrical wiring layout and electrical lighting on the site plan. The designation of the cut lived wires and cables. Recommendations on how to perform electrical installation work on the site, the number of tools, attachments and mechanisms.

Join the discussion
Read also
Like the signs of the zodiac fit one to one at the kohanna - a horoscope of wisdom
Yak formed a share of the show's wives
We didn’t check the wedding: how to live the finalists of all seasons of “The Bachelor Maxim Chernyaev and Maria Drigola”