How to enter before the overhaul of the bagatokvartirny booth. Yakі roboti enter before the overhaul of a bagatokvartirny booth? When CRR is broken

Information about those who can enter overhaul a rich apartment booth, I will be in favor of all bagmen. Let's take a look at the main rules that are going to be in 2019.

Dear readers! Article rozpovidaє about the typical ways of solving legal nutrition, but also individual cases. How do you want to know, how solve your own problem- contact the consultant:

APPLICATIONS AND INQUIRIES ARE ACCEPTED ON A QUOTE AND WITHOUT HOLIDAYS.

Tse shvidko i QUOTE-FREE!

Good food, how to stand already a lot of years in front of government agencies and companies, as well as apartment owners - how to secure the morning of life and carry out major repairs.

Citizens may have a great financial ambition for the mornings of the main objects, which are zagalnobudinkovimi, that and the living fund of significant relations.

Main aspects

Therefore, it is important to take a look at the concept of "overhaul" and identify the main nuances, like z tsim pov'yazani.

Appointment

About understanding the overhaul go to. May be on the account of the work carried out, for which:

  • zm_nyuyut budіvelnі designsії and їх warehouses;
  • change chi innovate engineering and technical communications;
  • revitalize or change parts of the future constructions that you carry.

Usuvayut be-like the injustice of the worn part of the lane. Її change to the best and innovate.

For the obviousness of the technical possibilities, I will modernize with an eye on the present, and improve the comfort of living.

With what method to be carried out

Repair can be:

Overhaul may be planned and unscheduled (emergency), which is carried out for the renewal of shkodi, which is set by the emergency design of the facility for the above-mentioned situation.

Lawful Substantiation

Warto keruvatisya norms of such documents:

  1. - tse (revenge perelіk robit, scho may vikonuvatisya), and others.
  2. , apparently, until what kind of overhaul is to be carried out
  3. GK - for example,.

How to enter before understanding the overhaul of a bagatokvartirny booth

It is not uncommon to put food on the one that itself is ready for a major overhaul. To that we give the next steps.

About what to go to the law

The law demarcated the goiter for carrying out the overhaul of the bagatokvartirny booth between the vlasniks and the regional government.

Territorial authority is victorious in organizing and controlling the function, and vlasniks can collect money, so that they can pay for the work.

If the law has become official, the skin of the subject of the Russian Federation is guilty of preparing normative documents in order to look at the food for the overhaul.

Subjects:

  • put in a list of robots, yakі mayut buti vykonani in the general language order, as well as lines;
  • appointed regional operators;
  • accepted the documents, which spelled out the procedure for carrying out the work, the amount paid, appointed the structure, as a control process.

Perelik robit, what to turn on

For the nayavnosti hoarding of the opportunity to see the great change of work, scho carry out the installation and repair and renovation process.

Pererakhuyomo, scho to enter before the overhaul of the facade of a bagatokvartirny booth Renovate the plastering of the facade, seal the panels, insulate the structures, change the windows and balconies, repair the balconies and loggias with the slopes, install the visors over the upper loggia, install the entrance at the top, fix the facade, install the roofs
It is also necessary to enter before the overhaul of the Dahu of a rich apartment house Repair and change the okremі elementi dahu, zdіysnyuyut anti-burning processing from the tree, restore the temperature regime, water content on the mountain, change the element of the roofing of the ovnіshny gutter.
From the side of the engineering system Repair and change the heating system, water, gas and other systems, ventilation, sewage system, install water heaters, change elevators, sewer lines. There is a repair of a video guard, a subscriber's building, a communication line, a low-voltage building
At the places of infamous koristuvannya Install lighting fittings, seal the communication sticks with the foundation, install heating, seal the entrance to the basement, have a room for concierges
When landscaping the territory Dotrimuyutsya documents approved by the architectural planning departments of the districts

Reinforce and repair the entrances to the Maidan and door panels.

Change the lighting at the entrance, change the doors, change the exits, change the entrances, repair the entrances.

Regional authorities can expand the list:

  • wall insulation;
  • obshtuvannyam dahu, which is to be ventilated, by mounting the output on the dahu;
  • equipping the booth with a fire-burner, other accessories, which increase energy efficiency.

For subjects, the list can also be supplemented with the following items:

  1. Clean up the houses and fold the roof for repairs.
  2. Carry out an author's and technical review of robots.
  3. Carry out technical inventory and passportization then.

Who pays

Legislation establishes a goiter for the apartments of Vlasniks to finance a major overhaul of the shackled budinkovy lane.

For this reason, the masses will pay contributions, as they will be accumulated at the special fund for overhaul, which is being formed:

  • or on the bank accounts of the MKD;
  • otherwise, the coins are accumulated on collective cabinets, which are managed by regional operators, which are engaged in the organization of repairs according to the installed program.

It is necessary to pay the skils - the subject of the Russian Federation himself is responsible for the skin. The amount is restored in rubles. Multiply the tariff for a wild display of the area of ​​\u200b\u200bappointment, which is rented from a Volodinn gromadyan.

The value of the deposit varies with the adjustments:

  • until what municipal lighting the object to lie down - in Moscow, in another region, the booths are rebuying;
  • type of MKD;
  • the surface of the booth;
  • operational term booth;
  • prices and obyagu robit;
  • the term of the vikoristannya of the infamous Budinkovo.

It is planned to carry out work, which is not registered in the LCD, they will be paid in cash, to transfer part of the payment for overhaul.

Collectively, the collection is carried out, de appraisal of the solution, de saving the money for a major overhaul.

How can Vlasniki not be able to stay at home, save their own money, decide to praise the body of the municipal authority.

If you want to pay a sum of money to be set up by the subjects, at the collections, the meshkans can make such a display, which means they need to finance the low income of their employees.

Capital repairs can be carried out at the initiative of residents. At the gatherings, the bulk of the people can praise the solution, as the work itself is necessary.

The rest of the instance will be recognized by the terms of the work carried out and zdiyasnyuyutsya pіdrakhunki vartosti repair.

As representatives of the housing inspectorate are not suitable for this, that major repairs are necessary, or to give a year on the obmezheniya see work, є іnshiy vyhіd.

Return to an independent expert, who will help you to overhaul the overhaul. Only such an examination is not costless. Vlasnik of the apartment - not the only one dzherelo finansuvannya overhaul.

IN normative documentation the whole scheme is prescribed, apparently to the extent that finances take part in the same way as the government structures of different equals. The state can give a support (additional).

Video: contributions for the overhaul of luxury apartments

If we talk about rich apartment houses, if some of the apartments have not been privatized, then it is impossible for the authorities to rule over the municipal authority.

Buvay, that the overhaul program did not work out, but it turned out emergency situation. Break through the water supply, sewerage, pipes of the scorching system.

Repairs at times are to be blamed for the shortest term with additional costs, selected for major repairs.

So, as the risers flow with water, they change them negligently, and do not impose a large number of clamps.

When CRR is broken

Recognition of terms, if the overhaul program has been approved can be vikonana, is not easy. For this varto, go to the site www.reformagkh.ru.

Try this order:

  1. Go to the portal.
  2. Enter the address in the row “Know your house”. Obov'yazkove vіdobrazhennya region, vulitsі, numbered booth.
  3. Click "Search".
  4. Go for help.
  5. A house card is shown, so you can find out about the work that has been confirmed by the program.
  6. Choose a section with types of work, so that you can check in line and planned.

I saw the distribution of the "Passport" for the purpose of recognizing critical information:

Vlasniks took some koshtіv;
like subsidies the state gives;
area of ​​the object;
at the Meshkans.

Vіdminnostі vіd flow

Varto nobility vіdmіnnostі in-line and capital repairs to that, scho to deposit a number of rights and goitre of the parties.

Headlines in terms of quality, periodicity and obsyazі repair visits. Let us clarify the name of the previous repair, which may be systematic.

To carry out in order to get ahead of the front of the construction of the construction, communication.

Come in, what are being implemented under the hour of in-line repair, revenge Methodical help for the morning of the housing stock as of April 2, 2004.

Major repairs are carried out in line with the daily feasibility of carrying out so as not to disturb the future of operation.

The wind of capital repairs of the life stunned Moscow in 2015. Apparently before her, in the whole place, repair robots are being carried out with a method of improving living minds. But there are too many residents of Moscow to be ruined in order to know the necessary information and to know everything about the whole process.

What is a major overhaul?

According to the legislatively approved document, from the middle of 2015, the deadline for overhauling the houses will be transferred to Muscovites. Leather booths - or rather, yogo bagmen - have the right to choose, save pennies, until the stink is not needed. You can save it for a specially made rahunka, or you can transfer it to a Russian fund. Transfer to the parent fund of finance three months from the moment of their accumulation at the total obsyazі.

Nezalezhno vіd mіstsya zberіgannya, if it's time for a major overhaul of the booth, pennies go to purchase the necessary materials. Today, the concept of "overhaul" was divided into two warehouses:

Persha - ce specific positions of what is being repaired at the booth. Tse can buti dahi, trumpet the supply of the water, or scorched, or all will be blown.

Another - tse those, how to carry out repairs. Practitioners are by no means guilty of repairing “one time, and then later” without objective reasons. Zgіdno z program, in one booth all systems are repaired at once, yakі vimagayut repair.

Important to know: Admittedly, the unfavorable situation was still trapilas, and as a part of the repair, the alarm clocks were transferred to the kilka tizhniv. At such a time, before the onset of the repair stage, before the wake of the obov'yazkovo, the fakhivtsi may come, as if to reconsider the yoga camp: what has not been lost in an hour of the presence of the practitioners. Yakshcho budіvelniki rozpochali another repair without looking around eksperіv, tse damage.

What to repair?

Alarm clocks don't do updates sane looking facades or furnishing walls pid'izdu. To the right - remember the engineering systems that are badly practiced. And if the facade is being repaired, it means that it is in an emergency and carries a threat to health, or to build the life of a meshkantsiv house.

Before other aspects of the repair, if you may need a hypothetical booth, enter:

  • renovation of water pipes;
  • replacement of gas pipes;
  • zmіtsnennya or a new replacement for the flooring of the dahu;
  • work at the basement, fixing cracks in the foundation;
  • electrical meter repair.

On an individual basis, other problems in the operation of the booth may be found, and it is also necessary to remove them.

How many houses are not included before the overhaul program?

The program is insured for 30 years, which means that new days are due to be repaired. Vodnochas perelіk can't be supplemented by bunkins, like:

  • pay for expansion and demolition with the renovation program;
  • I will be born in the next hour through an emergency;
  • will be reconstructed;
  • are made up of one or two apartments.

If your booths don’t show up, be it one of them, even if you still don’t show up for a major overhaul, you need to stock up on patience. In the first half of 2017, the list has been replenished with three hundred budіvel, and not a border.

How to stitch behind the camp to repair my booth?

In order to know your house and find out all the information about the planned or repair work, you don’t need to call to be sure to install or go to the housing and communal services for food. Dosit go to the site https://pgu.mos.ru/ru/. This is a special site created by the mayor of Moscow for monitoring the situation in the city.

Here you can find out about those switching on booths at the renovation program, worry about the noise at work and, understand, turn over the repair of your booth.

Helper to diy:

1. We go to the site and redirect to the right side:

2. For more information about living quarters, you need to click on the item “Lives, living quarters, doors”. The menu changes to this:

3. Now select the next item "Luggage house and door":

4. Here you can review the list of houses that are included in the renovation program, and in such a rite of change, that if your house is being rebuilt in a filthy state and trying to replace some structures, then in the next hour you won’t be able to carry it out, obviously, you can be on the checks for overhaul. To call us the head rank of the row “Recognizing everything about the overhaul”, which redirects to this side:

5. Having clicked on the item “If such works are carried out for overhaul”, you will rely on the side of the information, which is the most common for rows:

In this way, your order will have an updated list of the address of the houses, which until the end of 2017 is due to be repaired.

What robiti, how to carry out repairs nasty chi not in an hour?

As the site of state services is stverzhuє, that on your territory there may be carried out works, but there are no alarms.

Otherwise, if the stench has already gone, and the good systems have broken again, it is necessary to give a scarga. There are impersonal instances, to which you can turn around, but the most effective among them is the website of the Fund for Capital Repairs of the City of Moscow.

So that the letter was fixed and sent to the address, it is necessary to get low, we could: indicate the correct PIB and the correct address email. It is also fenced off vikoristovuvat obіgu obіgu obіg obіg chi thаt аrе bіk be-whom.

You can check both to the e-mail, and to the postal address, as the rest is indicated at the letter. You can submit a sheet with documents, but in a quantity no more than ten pieces.


Repair work, as a rule, fallow due to the periodicity of the carried out, is divided into two types: line repair and overhaul.

Perelik works for capital repairs

Changes in the performance of capital repairs are subject to the relevant acts (Regulations, Norms and Rules, Instructions, Recommendations and other). The given resemblances of the species are to be distinguished stalely in view of the object of capital life, its recognition.

See the robot instructed in the appendages to the guides regulations, texts at the deposit before publication:

Addendum 8 Decree of the Derzhbud of the SRSR dated 12/29/1973 N 279 "On the approval of the Regulations on the planned and pre-advance repair of public health services" (together with "MDS 13-14.2000 ..."))

Supplement N 8 Decree of the State Council of the Russian Federation of September 27, 2003 N 170 "On the approval of the Rules and norms of technical operation of the housing stock")

Addendum 9 Order of the Ministry of Justice of Russia dated 28.09.2001 N 276 (at the editorial office dated 24.01.2006) "On the approval of the instructions for the technical operation of the wakefulness and the establishment of the criminal-viconavcho system")

Table 2.3. The transition works for the overhaul of the apartment houses, which are connected to the warehouse, which are financed for the cost of expenses transferred by Federal Law N 185-FZ ( )

Appreciation of the understanding of "overhaul" by the NPA

Major overhaul- repair, which is designed to improve the technical and economic characteristics of the object to a value close to the design ones, from a replacement or a renewal, be it warehouse parts (Order of the Derzhbud of the Russian Federation dated December 13, 2000 N 285 "On approval Typical instructions from the technical operation of thermal barriers of communal heat supply systems).

Major overhaul- Carrying out the complex weekly work and organizational - technical entries how to adopt physical and moral wear, not related to the change of the main technical and economic indicators of life functional recognition, which transfers the renewal of the resource with a partial replacement for the necessary structural elements and engineering systems, as well as the reduction of operational indicators ( Decree of the Council of Moscow dated 30.07.2002 N 586-PP (at the editorial office dated 23.12.2015) "On the approval of the Regulations on the single procedure for pre-project and design preparation of the life of engineering communications, disputes and objects in the road and transport security of Moscow").

Capital repairs of objects of capital life(For the Vinnyatkom Lyn_ynyh Ogєktiv) - Zaynna Ta (ABO) Vidnounced Budіvelli constructions Og'єtіv Kapital Budіvniktva Abo Elentiva such constructions, for the vicinity of Nesuchi Budіvetnyi constructions, Zesenna Ta (Abo) Vidnant Systems of Ineneserno-Technical Observation Ta objects of capital life of either їх elements, as well as the replacement of other elements of load-bearing building constructions with analogous or other improving indications of such constructions of elements and (or) reinvention of the designation of elements ( (At the editorial office on 18.06.2017)

Capital repairs budivel ta sporud

Before overhaul, budіvel that sporud work is carried out to replace or replace a few parts of the bud (spores) or a whole number of structures, parts and engineering and technical equipment at the link with their physical wear and tear on more long-term and economic, that improve the operating Decree of the Derzhbud of Ukraine dated 05.03.2004 N 15/1 (at the editorial office dated 06/16/2014) "On the confirmation of the on-going ceremoniality of the Methodology for the designation of the level of budding production on the territory Russian Federation(together with "MDS 81-35.2004 ...")).

Major overhaul of the building- a complex of everyday and organizational and technical approaches to adopting physical and functional (moral) wear, which do not transfer changes in the main technical and economic indicators in life, or to include, if necessary, the replacement of some of these structural elements (constructive) engineering systems with their own modernization. Major overhaul does not continue the term of service budivel, to the fact that vin is assigned for the most important elements, which are not replaced during repairs ( "Methodological recommendations on how to form a warehouse for the overhaul of apartment buildings that are financed for the cost of housing, transferred by the Federal Law of April 21, 2007 N 185-ФЗ "On the Fund for the Acquisition of the Reform of the Housing and Communal Reforms" 15.02.2013)

Major overhaul of a bagatokvartirny booth

Major overhaul of a bagatokvartirny booth- Carrying out that (or) nadannya transfers to the federal law robіt and (or) services from the usunennya of malfunctions of the structural elements of the sleeping lane of the Vlasniks in the accommodation at the bagatokvartirny booth (further - the main mine at the bagatokvartirny booth), including a method of improving the operational characteristics of a wild lane in a rich apartment booth ( article 2 of the Federal Law dated July 21, 2007 N 185-FZ (as amended on June 23, 2016) "On the Fund for the Reformation of the Housing and Communal State").

Overhaul of the lane of a bagatokvartirny booth: a complex of work (services) from replacing (or) renovating (repairing) structures, parts, systems of engineering and technical security, and other elements of load-bearing structures of a rich apartment house, which was spent in the process of operation carrying such (or) functional analogy, to improve the indicators to their normative level, if such work is carried out, the current repair ( )

See the overhaul

Comprehensive and vibratory overhaul

Overhaul is subdivided into complex overhaul and vibratory.
a) - tse repair of the replacement of structural elements and engineering equipment and their modernization. Vіn turn on the robots, which will suffocate the whole house with a blaze, or else open sections, which will have their physical and functional wear.
b) - ce repair from a new or partial replacement of the okremih constructive elements of life and spores or possession, straightened on the outside of the airflow of the physical and partly functional wear.
Before the type of overhaul, lay down in the technical state of the future, recognized for repairs, as well as the planned level of internal improvement. "Methodological recommendations on how to form a warehouse for the overhaul of apartment buildings that are financed for the cost of housing, transferred by the Federal Law of April 21, 2007 N 185-ФЗ "On the Fund for the Acquisition of the Reform of the Housing and Communal Reforms" 15.02.2013))

Major overhaul: replacement, renovation and (or) repair of the sleeping lane of the bagatokvartirny boudinka, or okremih yogo parts, which vibrate according to the date to the greater part of the sleepy lane of the bagatokvartirny boudinka ( "GOST R 51929-2014. National standard of the Russian Federation. Services of the housing and communal government and management of rich apartment houses. Terms and definitions" (approved by the introduction to the regulation by the Order of Rosstandart on 11.06.2014 N 543-st)

Complex overhaul- ohoplyuє all the elements of life, transferring one-hour renewal of all the znosheniya constructive elementіv, the engineering possession and the advancement of the well-being of life in a zagalom, usuvavє physical and moral znoshuvannya. Conducting chergovogo integrated kapіtalnogo repair budіvlі abo sporudi nedotsіlno at vipadkah, Yakscho namіchaєtsya znesennya abo migrated budіvel abo sporud at zv'yazku of maybutnіm budіvnitstvom on dіlyantsі іnshoї budіvlі abo sporudi scho zaymaєtsya them peredbachaєtsya rekonstruktsіya budіvlі, namіchaєtsya rozbirannya budіvlі vnaslіdok zagalnoї vethostі. In the appointed cases, it is to blame for the work of supporting the constructions of the future, or arguing at the station, which ensures their normal operation for a long period of time (until the construction or reconstruction) ( )

Major overhaul of vibrators: replacement (renewal) of the deep lane of a bagatokvartirny booth, or okremih yogo parts, which vibrates by extension to a smaller part (deaky parts) of a sleepy lane of a bagatokvartirny booth ( "GOST R 51929-2014. National standard of the Russian Federation. Services of the housing and communal government and management of rich apartment houses. Terms and definitions" (approved by the introduction to the regulation by the Order of Rosstandart on 11.06.2014 N 543-st)

Vibirkovy overhaul- ohoplyuє okremі konstruktivnі elementi budіvlі аbо yogo іnzhеnеrіnіnі obladnannya, at tsommu usuvaєєєє єєєє єєєє єєє єє єєє єєє єєє єєє єєє єєєн ні зношування ааааааааааааааааааааааааааааааааааааааааааааааааааааааааааааааааааааааааааааааааааааааааааааааааааааааааааааааааааааааааааааааааааааааааааааа" technical systems budіvlі. Viberkoviy Kapіtalnaya Repair is carried out in the vipads, by the complexes of the Kapіtalnaya Repair of Budіvlі Mozda Viklikati Seriesni Pereshkodi in the robot o'єkta, with a meaningful znosti of Okrahimiy constructions, Shaho ferozhaє of the Supreme Partial Partin Budіvlі, with an integrated renovation for approaches, renovatives at the integrated kipital repair ( Decree of the Council of Moscow dated 09/29/2010 N 849-PP (at the editorial office dated 07/07/2015) "On the approval of the Regulations for the overhaul of non-violent bridge objects, which are transferred from the sovereign authority of Moscow to the trustee management")

Emergency overhaul- repair or replacement of all constructive elements, outbuildings, systems of engineering equipment, which happened out of harmony after accidents, natural disasters, terrorist acts and vandalism ( Decree of the Council of Moscow dated 09/29/2010 N 849-PP (at the editorial office dated 07/07/2015) "On the approval of the Regulations for the overhaul of non-violent bridge objects, which are transferred from the sovereign authority of Moscow to the trustee management")

Major overhaul of the main engineering communications

Before the overhaul of the existing engineering communications that objects will be landscaped with the repair of water supply, sewerage, heat and gas supply and electricity supply, landscaping of yard territories, repair of roads, passing and sidewalks toshcho. ( Decree of the Derzhbud of Russia dated 05.03.2004 N 15/1 (at the editorial office dated 06/16/2014) "On the confirmation of the upcoming ceremoniality of the Methodology for the designation of vartosti budіvelny products on the territory of the Russian Federation ..." (at a time 8 z-3504))

Capital repair of roads

Capital repairs of the motor road- a complex of robots from replacing (or) reinforcing the structural elements of the automobile road, road spores and (or) their parts, vikonannya of which technical characteristics the class of the category of the motor road, and in case of viconann, the constructive and other characteristics of the reliability and safety of the motor road do not change between the smogs of the motor road ( Art. 3 of the Federal Law dated 08.11.2007 N 257-FZ (as amended by 07.02.2017) "On motor roads and road traffic in the Russian Federation and on the introduction of amendments to other legislative acts of the Russian Federation")

Capital repair of the road surface- complex robіt at Money Does carried Povny vіdnovlennya that pіdvischennya pratsezdatnostі road odyagu that pokrittya, roadbed that dorozhnіh sporud, zdіysnyuєtsya zmіna znoshenih konstruktsіy that parts abo zamіna їh on naybіlsh mіtsnі that dovgovіchnі, pіdvischennya geometric parametrіv road of urahuvannyam zrostannya іntensivnostі Ruhu that osovih navantazhen cars at the borders of norms, of the relevant category, installed for the road that is being repaired, without increasing the width of the subgrade on the main stretch of the road ( Decree of the Ministry of the ZhKKG MO issued 29.06.2015 N 125-РВ "On the approval of the Rules for the improvement of the territory of the Moscow district of Balashikha, Moscow region")

The term of the overhaul. Smart term

The terms for the overhaul are either established by the parties or established by regulatory legal acts (NLA). For the validity of the statement on the terms of the repair at the contract or normative act, wіn be carried out in a reasonable term.

The concept of a "reasonable term" is traditional for civil law and is defined more than once in the norms of the Civil Code of the Russian Federation (div. Art. 314 of the Central Committee of Ukraine, forcibly compelled - paragraph 4 of article 345, paragraph 1 of article 358 of the Central Committee of Ukraine).

A reasonable term for a major overhaul to lay a mine, for power, climate peculiarities, major overhaul features, technical possibilities and other reasons.

In addition, NPAs can transfer specific terms of the repair, so the order of their appointment can be fixed, the periodicity of the meeting can be restored okremih species repair robots.

Attachment:

; Addendum 8 to Decree the State Council of the SRSR dated 12/29/1973 N 279 "On the approval of the Regulations on the planned and early repair of public health and safety" (together with "MDS 13-14.2000 ...")

Addendum 8

PERELIK
ROBOT FOR OVERHAUL BUDIVEL I SPORUD

A. BY BUDINKAM

I. Foundations

1. Replacing wooden stiles and replacing them with stone or concrete steps.
2. Chastkove shifting (up to 10%), as well as the strengthening of stone foundations and basement walls, are not connected with the budding life, but with additional advantages in the form of possession, which is being restored again.
3. Renovation of vertical and horizontal insulation of foundations.
4. Renovation of the current pavement for the next week (more than 20% of the total area of ​​the pavement).
5. Repair of the main drains for the future.
6. Changes of single stone and concrete slabs that are crumbling.

II. Walls and columns

1. Laying of cracks in the stone or stone walls from the clearing of the furrows, with the dressing of the seams with the old masonry.
2. Vlastuvannya and repair of structures that replace stone walls.
3. Re-laying of old cellar cornices, lintels of parapets in pits and protruding parts of walls.
4. Relocation and repair of old stone walls up to 20% of the total amount of masonry, not due to the overbudding life, but by additional improvements in the form of installation, which will be restored anew.
5. Reinforcement of concrete and stone columns with clips.
6. Repair of that partial replacement (up to 20% of the total obligation) of the columns, not connected with additional investments in the form of installation, which will be restored again.
7. Replacing the walls with stone, concrete and metal frames (up to 40%).
8. Replacing the old crowns from decks or block walls (up to 20% of the cast surface walls).
9. Sutsilna caulk from decks or block walls.
10. Chastkova change of sheathing, sagging and slab insulating frame walls (up to 50% of the total area of ​​the walls).
11. Change or repair of cladding and heating of wooden plinths.
12. Repair of stone plinths of wooden walls from re-laying up to 50% of the total obligation.
13. Setting up anew and changing worn-out stisks from decks and paving walls.

III. Partitions

1. Repair, change and replacement of old partitions of larger progressive designs of all types of partitions.
2. In the event of a major overhaul of partitions, partial re-planning is allowed for more than 20% more than 20% of the total area of ​​the partitions.

IV. Dahi ta pokrittya

1. Replacing old wooden farms covered with replacement of them on the choice of cast-in-place concrete.
2. Sutsilna or chastkovy replacement of old metal and concrete trusses, as well as the replacement of metal trusses on the choice of concrete trusses.
3. Reinforcement of farms in case of replacement of types of roofing (replacement of wood slabs with selected cast-iron concrete, cold coating - with heat and etc.), when moving upstairs outbuildings, as well as in case of corrosion of nodes and other elements of metal and selected cast-iron farms.
4. Chastkova or a sustainable change of krokv, mauerlativ and resolving.
5. Repair of load-bearing structures of light light fixtures.
6. Repair of outbuildings from the installation of wickerwork of light fixtures.
7. Chastkova or a new change of the old elements of coverage, as well as a replacement of them for more progressive and old ones.
8. Chastkova (over 10% of the total area of ​​the cover) or a significant change in the replacement of all types of cover.
9. Revlashtuvannya dahіv zv'azku iz zamenoy material pokrivlі.
10. Chastkova or succesful replacement of wall gutters, descents and roofs of smoke pipes and other outbuildings that protrude above the roof.

V. Intermediate overlaps and sublogs

1. Repair and change of intersurface overlaps.
2. Replacement of okremih constructions and overlappings with more progressive and long-term constructions.
3. Strengthening of all types of inter-overhead and mountain overlaps.
4. Chastkov (more than 10% of the total area of ​​\u200b\u200bsublogs in the future) or a significant change in all types of articles and substations.
5. Revlashtuvannya pіdlog pіd hour repair іz zamenu іn bolsh mіtsnі аnd dovgovіchnі materiali. If so, the type of sublog is guilty of substantiating the rules of that technical minds for a new life.

VI. Vikna, doors and gates

1. Replacing the old windows and door blocks, as well as stealing the mill buildings.

VII. Get off ta ganks

1. Chastkova or a sustainable change of skhodovyh maidanchikiv, ramps and gankiv.
2. Change and strengthening of all types of convergence and of all other elements.

VIII. Internal plastering, facing
that painting robots

1. Renovation of plaster of all applications and repair of plaster in general over 10% of the hard plastered surface.
2. Replacing the facing of the walls with a total of over 10% of the total area of ​​the facing surfaces.
3. Sutsilne anticorrosive stuffing of metal structures.

IX. facades

1. Repair and refurbishment with an area over 10% veneered surface.
2. Exterior or partial (more than 10%) plaster renovation.
3. External reinforcement of rods, cornices, belts, sandrivs and others.
4. Reinvention of stucco details.
5. Sutsilne stocking with stable warehouses.
6. Cleaning the facade with air blast machines.
7. Change of balcony slabs and fences.
8. Changing the coverings of the protruding parts of the life.

1. Outside re-laying of all types of scorching ovens, smoke pipes and their foundations.
2. Refurbishment of furnaces for burning in them vugіllya and gas.
3. Outside rearrangement of kitchen stoves.

XI. central scorching

1. Replacing the other sections and units of the scorching boilers of boilers, boiler units, or the total replacement of boiler units (as the boiler unit is not an independent inventory object).
2. Repair and replacement of extensions, condensate miners and other possessions.
3. Repair and re-laying of foundations for boilers.
4. Automation boiler.
5. Transferring from the scorch to the central.
6. Change of scorching registers.
7. Arrival to the heating lines (if the distance to the line is no more than 100 m).

XII. ventilation

1. Chastkova chi povna zmina povіtrovodіv.
2. Change of fans.
3. Rewinding or changing electric motors.
4. Change of gates, deflectors, throttle valves, blinds.
5. Chastkova chi povna change of ventilation boxes.
6. Change of heaters.
7. Change of scorching aggregates.
8. Change filters.
9. Change of cyclones.
10. Changes in the design of chambers.

XIII. Water supply and sewerage

1. Chastkova or a new change in the middle of the pipeline, including the introduction of water supply and sewer outlets.

XIV. hot water supply

1. Change of coils and boilers.
2. Changes to the pipeline, parts and in general pumping units, tanks and insulation to the pipeline.

XV. Electrical lighting and sound

1. Replacing the merchants who were worn out (more than 10%).
2. Change of outside shields.
3. Repair of renovation of cable channels.
4. During the overhaul of the frame, it is allowed to replace the luminaires in other types (primarily luminescent).

B. FOR DISPUTES

XVI. Water supply and sewerage spores

a) Pipe fittings

1. Chastkova chi povna replacement of anti-corrosion insulation of the pipeline.
2. Replacing the okremih pipes of the pipeline (worn out pipes) without changing the diameter of the pipes. In this case, it is allowed to replace chavun pipes on steel, ceramic pipes on concrete or cast-concrete, and on the other hand, it is not allowed to replace asbestos-cement pipes on metal pipes (crym of emergency falls).

3. Change of worn fittings, vents, fire hydrants, air vents, valves, standpipes or repair of worn parts.
4. Change of okremih pipes of dyukerіv.

b) Wells

1. Repair of kіtin kolodyazіv.
2. Change of hatches.
3. Stuffing new trays instead of zruynovanyh.
4. Replacement of wooden wells that have come into disrepair.
5. Renovation of plaster.

c) Water intake and hydrotechnical spores

1. Rowing, rowing, spillways, canals

1. Change of chi zam_na of strengthening of the shores of chi ukosiv up to 50%.
2. Dosipannya vіdkosіv earthen spores, which were poured.
3. Change of rows.
4. Reinforcement of the sour ball near the underwater parts of the flood-concrete spores.
5. Change of gratings and screens.
6. Repair and replacement of shield shutters.

2. Water Sverdloviny

1. Pobudova and selection of the drilling rig or installation and dismantling of the inventory drilling rig.
2. Cleaning of the Sverdloviny from collapses and muddying.
3. Checking and installing a new filter.
4. Fastening of the sverdloviny with a new column of casing pipes.
5. Replacement of water supply and overhead pipes.
6. Reinstatement of the debit of the Sverdlovin by torpedoing and washing with hydrochloric acid.
7. Cementation of pipe space and drilling to cement.

d) Clean the spores

1. Repair and replacement of waterproofing.
2. Repair and renovation of plaster and frost.
3. Transferring whole walls and partitions up to 20% of the total masonry at the sporud.
4. Laying leaks in concrete, concrete and stone walls and bottoms of spores with concrete separation in other places and concrete again.
5. Sutsilne shotcrete spores.
6. Drainage repairs on the sporuds.
7. Replacing hatches of reservoirs.
8. Replacement of gratuity.
9. Replacement of the advancement of filters, biofilters, aerofilters.
10. Change of filter plates.
11. Replacement of pipelines and fittings.
12. Relocation of the drainage system of mule maidanchiks.

XVII. Heating supply

a) Channels and chambers

1. Chastkova or a new change of cover for channels and cameras.
2. Chastkova or a change of waterproofing of channels and chambers.
3. Chastkove perekladannya walls of trefoil channels and chambers (up to 20% of the deep surface walls).
4. Chastkove perekladannya drainage systems.
5. Repair of the bottoms of channels and chambers.
6. Renovation of the shackle ball in the concrete structures of the canals and chambers.
7. Change of hatches.

b) Pipe fittings

1. Chastkova chi povna change of thermal insulation of the pipeline.
2. Renovation of waterproofing to the pipeline.
3. Replacing the okremih pipes of the pipeline (worn out pipes) without increasing the diameter of the pipes.
4. Change of shaped parts, zasuvok, compensators or їх repair іz replacement of worn parts.
5. Replacement of rickety and rough supports.

XVIII. Pіd'їznі and vnutrishnyozavodskі vіzlіznіchnі kії

a) Earthlings canvas

1. Expansion of the subgrade in areas of insufficient width to normal expansion.
2. Exaltation of the subgrade in the areas of zsuviv, rozmiviv, landslides, no clothing.
3. Renovation of all water and drainage outbuildings.
4. Reinforcement of all zahisnyh and strengthening spores of the subgrade (advancement, paving, supporting walls).
5. Reinvention of regulatory disputes.
6. Correction, dosipannya cones of bridges.
7. Changes of other structures of piece spores, or replacement of them with other structures, as well as replacement of pipes and small bridges (for example, stinks are not independent inventory objects, but enter the subgrade warehouse).

b) Upper Budova Kolії

1. Cleaning the ballast ball or updating the ballast, bringing the ballast prism to the point of expansion, established according to the standards this type paths.
2. Change of non-adherent sleepers.
3. Change of worn rails.
4. Change of non-adherent creaks.
5. Correction of curves.
6. Repair of crossbars from the replacement of other elements and crossbeams.
7. Change of line retellings.
8. Repair of the bridge deck.
9. Replacing the flooring by moving from replacing the wooden one to the concrete one.

c) Pieces of spores (bridges, tunnels, trumpets)

1. Chastkova change of elements or a complete replacement of worn-out running houses.
2. Chastkove re-laying of stone and stone supports (up to 20% of the total obsyagu).
3. Repair of concrete poles (up to 15% of the total cost).
4. Gunning and grouting of surface supports.
5. Attachment on supports of reinforced concrete shells (shirt).
6. Repair of new insulation.
7. Change of bridge beams.
8. Change of anti-corner beams.
9. Change of wooden pidlog.
10. Replacing the flooring from cast-in-place concrete slabs.
11. Change of counter rails.
12. Change of damaged elements of wooden bridges, krim palm.
13. Replacing wooden packages on concrete girders.
14. Partial re-laying of stone and cellar masonry, vaults and tunnel walls.
15. Pumping cement difference for the tunnel.
16. Repair and replacement of drainage outbuildings of tunnels.
17. Relocation of the pipe head.
18. Replacement of elements of wooden pipes (up to 50% of the commitment to the wood).
19. Change of elements of concrete and concrete pipes (up to 50% total).

ХІХ. Automobile roads

a) Earthlings canvas

1. Exaltation of the subgrade in the areas of subsidence, collapse, expansion and no day.
2. Renovation of all water and drainage outbuildings.
3. Reinstatement of all the deficiencies and replacements of the subgrade.
4. Changes of other constructions of piece spores or replacement of them with other constructions, as well as replacement of pipes and small bridges (yakscho stinks are not independent inventory objects, but enter the subgrade warehouse along the road as a single inventory object).

b) Road clothes

1. Reconstruction and replacement of cement-concrete slabs.
2. Laying on a cement-concrete pokritti ball, which is virivnyuє, from asphalt concrete.
3. Laying asphalt concrete pavement on roads with cement concrete pavement.
4. Change of cement-concrete coating on a new one.
5. Strengthening the asphalt concrete pavement.
6. Perebudov crushed stone and gravel covers.
7. Relocation of brukivka.
8. Profile of dirt roads.

c) Bridges, blow

1. Chastkove re-laying of stone and stone supports (up to 20% of the total obligation).
2. Repair of concrete poles (up to 15% of the total amount).
3. Replacing the poor elements of wooden bridges, krim palm.
4. Change of wooden decking of concrete flooring, as well as replacement of wooden flooring with concrete flooring.
5. Povna zmina or zamina girders.
6. Repositioning of pipe heads.
7. Replacement of elements of wooden, concrete and concrete pipes (up to 50% total).

d) Maydanchiki for cars, road-building
and other cars, warehouse maidans, as well as maidans
bakeries

1. Repair and renewal of water spores (trays, cuvettes, etc.).
2. Moving brooks.
3. Perebudova crushed stone and gravel pokrittiv maidanchikiv.
4. Repair of concrete maidanchiks from the laying of the concrete ball.
5. Reconstruction and replacement of cement-concrete slabs.
6. Covering the Maidanchiks with asphalt concrete, pointing at points 2 - 5.

XX. Electric lines and ties

1. Change of replacement of non-attached reinforcement.
2. Replacement of hooks on the traverse.
3. Change of dart.
4. Repair and replacement of end fittings and good cable boxes.
5. Repair or replacement of grounding outbuildings.
6. Change of supports (up to 30% per 1 km.).
7. Installation of cable boxes.

XXI. Other disputes

1. Repair, replacement or replacement for other supports of racks for repeated laying of pipelines.
2. Repair or replacement of Maidanchikiv, descent and fencing of overpasses for the pipeline re-laying.
3. Repair and replacement of okremy columns (up to 20%) of crane racks.
4. Repair or change of crane beams of crane racks.
5. Repair of galleries and piers for fire supply of boiler houses and gas generator substations with a change (up to 20%) of the structure without changing the foundations.
6. Change or replacement of wooden fences (fences).
7. Repair or change of concrete and concrete slabs (up to 20%) and fences (fences).
8. Repair of okremikh delyanok zapovnen mizh stovpami fenced (up to 40%).
9. Repair of small farms with stone fences (up to 20%).
10. Repair of small yards with large adobe fences (up to 40%).
11. Repair of smoke pipes with replacement or replacement of the lining, with the installation of hoops, with reinforcing the ball of cast-in-place concrete pipes.
12. Repair and replacement of okremikh lanoks of metal smoke pipes.
13. Repair of ash and slag water from the complete replacement of the pipeline pits (without increasing the diameter).
14. Repair of fixed platforms with new replacement of wooden flooring, paving or asphalt. Changes of the okremikh supports or of the subdivisions of the supporting walls (up to 20%). As a part of the warehouse object (ramp), it is allowed to change the change or change of all structures.

Zrazkovy perelіk robit, scho to be carried out during the overhaul of the housing stock; Addendum 8 to the Decree of the State Council of the Russian Federation of September 27, 2003 N 170 "On the approval of the Rules and norms for the technical operation of the housing stock"

APPLIED PERELIK
ROBOT, DURING MAJOR REPAIRS
HOUSING FUND

1. Furnishing of living quarters (including provision of housing stock) and preparation of design and construction documentation (independently during the period of repair work).
2. Repair and budіvelnі works zі zmіni, vіdnovlennya or zamіni elementіv zhitlovyh budіvel (krіm povnoї ї zameni kam'yanyh i kontonih podnovіnі, bearing sіn і karkaіv).
3. Modernіzatsіya zhitlovih budіvel at їh kapіtalnomu remontі (s pereplanuvannya urahuvannyam rozukrupnennya bagatokіmnatnih apartments; vlashtuvannya dodatkovih kitchens that sanіtarnih vuzlіv, rozshirennya zhitlovoї ploschі for rakhunok dopomіzhnih primіschen, polіpshennya іnsolyatsії zhitlovih primіschen, lіkvіdatsії dark kitchens that vhіd neobhіdnostі, vbudovanih abo pribudovanih primіschen for skhodovih cells, sanitary facilities or kitchens); replacement of hearth scorching by the central boiler house, heat conductors and heating points; yeshov and others autonomous gerel heat supply; refurbishment of stoves for spitting chi vugillya gas in them; possessing systems of cold and hot water supply, sewerage, gas supply with access to the main lines at the entrance to the entry point to the connection point to the mains up to 150 m, power supply of gas pipelines, water pumping, boiler rooms; replacement of basic systems central scorching, hot and cold water supply (including for obov'azkovym zastosuvannya modernization of scorching fittings and pipelines made of plastic, metal plastics, etc.) and a fence for installation steel pipes); installation of butovyh electric stoves natomist gas stoves or kitchen centers; budovu lifts, smіttєprovodіv, systems of pneumatic smіtєdalennya at the booths with a view of the exit maidanchik upper on top of 15 m and above; transferring the main electrical supply lines to the increased voltage; repair of television antennas of the collective koristuvannya, connection to the telephone and radio broadcasting system; installation of intercoms, electric locks, control of anti-burning automation systems and smoke alarms; automation and dispatching of elevators, scorching boilers, thermal barriers, engineering equipment; landscaping of yard territories (pavement, asphalting, landscaping, fenced fences, wood sheds, possession of children and gospodarsko-pobutovy maydanchiks). Repair of dahіv, façades, stikіv povnozbіrnih budіvel up to 50%.
4. Insulation of living quarters (robots from the expansion of heat-insulating power of structures that are protected, powering up the windows on the third slopes, powering the outer vestibules).
5. Replacement of internal engineering measures.
6. Installation of fittings in the form of heating of thermal energy for scorching and hot water supply, supply of cold and hot water for wake-up, as well as installation of apartment lights in hot and cold water (when replacing the measure).
7. Revamping the confusion of breaths that are not ventilated.
8. The author's vision of the design organizations for the overhaul of living quarters with a new or partial replacement of recurrence and replanning.
9. Technical supervision in the field, if in the organs of the local self-regulation, organizations have been created from the technical supervision of the overhaul of the housing stock.
10. Repair of budding houses at the houses.

Perelіk robіt z capital repairs budіvel ta sporud; Addendum 9 to the Order of the Ministry of Justice of Russia dated September 28, 2001 N 276 (at the editorial office dated January 24, 2006) "On the approval of the instructions for the technical operation of the wakefulness of the establishment of the criminal and military system")

Addendum 9

PERELIK ROBOT FOR MAJOR REPAIR BUDIVEL I SPORUD

1.1. Foundations.
1.1.1. Change of wooden stiles and replacement of them on stone and concrete steps.
1.1.2. Chastkova re-laying (up to 15%), as well as strengthening the foundations and basement walls under the old and internal walls and stovpas of stone and wooden buds, not due to the over-budding life, but to the additions to the landscaping, being restored.
1.1.3. The strength of the foundations of the foundations of stone budіvel, yakі not povyazanі z nadbudovoi budіvlі.
1.1.4. Renovation of vertical and horizontal insulation of foundations.
1.1.5. Renovation of the new pavement or the addition of a new pavement to the future (more than 20% of the total area of ​​the pavement) with a method of damaging the soil under the foundations of the vіd rozmivannya or rebuilding.
1.1.6. Repair of the cladding of the foundation walls from the side of the basement with rimmed sections, with the laying of over 10 celins in one section.
1.1.7. Chastkove or new renovation or installation of new waterproofing in basements.
1.1.8. Chastkova or re-laying of the priyamkіv bіla vikon pіdvalnyh and plinth surfaces.
1.1.9. Replacing rotten wooden foundation stiles in wooden booths on new wooden, ceglyan, concrete or cast-concrete slabs.
1.1.10. Repair of the main drainages for the future.
1.1.11. Replacement of single stone and concrete slabs that are crumbling.
Note. For expenses for capital repairs, it is possible to carry out piece-by-piece fixing of foundation foundations in chemical, thermal and other ways.

1.2. Walls and colonies.
1.2.1. Translating tsegliny plinths (more than 10 tseglin in one space).
1.2.2. Laying cracks in the stone or stone walls, clearing the furrows, re-binding the seams with the old masonry.
1.2.3. Vlastuvannya and repair of structures that replace stone walls.
1.2.4. Shifting old cornice cornices, lintels, parapets, pits and protruding parts of walls.
1.2.5. Pollowed by the Pescaren Skarennya, the Karplennnya Okhareich Starich Dilok Zagliki Stin (up to 25% of the Zagalniyiyii її at Budіvlі), do not ride Zadlubudovo Bud_vlі Abo with dodasi navantages of the Novovstavnoye Oblidnavinnya, but ZMINA Trojna in the village of Budail overwhelm also 25% of the burnt surface of the walls.
1.2.6. Zmіtsnennya walls with tension and metal ties.
1.2.7. Replacing the filling at the walls with stone, concrete and metal frame (up to 40%).
1.2.8. Laying cracks in the stone wall with the removal and clearing of the old masonry and the installation of a new one, with the dressing of the seams with the old masonry.
1.2.9. Reinforcing the ball of waterproofing on all horizontal surfaces according to the image of the foundation.
1.2.10. Strengthening or strengthening of stone walls, which move in a vertical position and may deform.
1.2.11. Shifting old cornices, parapets, firewalls, pits and protruding parts of walls.
1.2.12. The perekladannya okrem, which became unacceptable, vіkonnih i door lintels.
1.2.13. Insulation of old wooden walls with a patch of boards over roofing or with additional sheathing with boards and with a dusting of dry slag.
1.2.14. Chastkove selection of essential internal walls that masonry is new (up to 25% of the total cost), tied to the replanned premises.
1.2.15. Replacement different types zapovnyuvachiv at the walls with stone, concrete and metal frames (up to 50% of the total area of ​​the walls).
1.2.16. Replacing old windows from decks or block walls (up to 20%).
1.2.17. Sutsilna caulk from decks or timber walls.
1.2.18. Chastkova change of skins, sagging and insulating frame walls (up to 50% of the total area of ​​the walls).
1.2.19. Change or repair of sheathing and insulation of wooden plinths.
1.2.20. Repair of stone plinths of wooden walls from re-laying up to 50% of the total obligation.
1.2.21. Staging anew and changing worn-out stiskiv from decks and paving walls.
1.2.22. Reinforcement of concrete and stone columns with clips.
1.2.23. Repair and partial replacement (up to 20%) of columns that are not affected by additional changes due to installation, which will be restored again.

1.3. Partitions.
1.3.1. Repair, change and replacement of old partitions for larger progressive structures.
1.3.2. Chastkove redevelopment from zbіlshennyam zagalnoї ploschі partitions (up to 20%).
1.3.3. Repair of partitions by replacing non-adherent strapping and planks at a distance of over 2 m2 in one area.
1.3.4. Strengthening the soundproofing of partitions by upholstering them with an additional ball of hardboard, cardboard or other materials with a distant applied plaster ball, pasting with trellises or zabarvlennya.
1.3.5. Topping up the filling of the two-ball partitions with the advancing laying of boards and the completion of all maintenance works.

1.4. Dahi and cover.
1.4.1. Replacement of formwork boards at the places of the ridges and eaves slopes.
1.4.2. Replacement of old constructions of dahu with dahu from ready-made cast-in-place concrete elements covered with roofing felt, roofing felt and other covering materials.
1.4.3. Sutsilna or chastkova replacement of old metal and concrete trusses.
1.4.4. Strengthening of farms in case of replacement of types of roofing (wood slabs on selected cast-iron concrete, cold coating - on heat and in.), as well as in case of corrosion of knots and other elements of metal and selected cast-iron farms.
1.4.5. Chastkova or sucilna zmina krokv, mauerlativ and reshetuvannya pіd pokrіvlyu.
1.4.6. Repair or replacement of metal fences on dahas.
1.4.7. Repair or replacement of old old gatherings that were worn out.
1.4.8. Vlastuvannya new lasіv on das, auditory viscons and transitional bridges to them.
1.4.9. Translating dimovih ta ventilation pipes on a whim.
1.4.10. Sutsilna replacement of old wall gutters, descents and roofs of smoke pipes and other outbuildings that protrude above the roof.
1.4.11. Perebudova svіtlovih lihtarіv z small illuminance prismіschen on great.
1.4.12. Repair and filling of load-bearing structures of light lighters.
1.4.13. Repair of mechanical and manual outbuildings, which open and close, weaves of light fixtures.
1.4.14. Chastkova or a new change of the old elements of the cover, as well as the replacement of them for more progressive and old ones.
1.4.15. Chastkova (more than 10%) or significant change of cover (all types).
1.4.16. Perebudova dahiv at the link from the replacement of the covering materials.
1.4.17. Repair of coverings of chimneys and ventilation pipes, firewalls, parapets and other protruding parts on the dakha.
1.4.18. Repair of parapets, steel fences, head repairs ventilation shafts, gas ducts, sewer risers and other protruding parts on the dakha.
1.4.19. Revision and repair of drabins for the safe cleaning of chimneys on dahas with soft coverings or slopes, which can be a steep fall.
1.4.20. Pidtrimka at the order of the best fire drabins for pidhom on dachas.

1.5. Mіzhoverhovі rewriting and pіdlogi.
1.5.1. Repair or change of inter-overhead and mountain ceilings.
1.5.2. Replacement of okremih beams of overlappings, building up of kintsiv beams with prostheses with usma distant robots. Replacement of pіdboru between beams.
1.5.3. Replacement of okremikh constructions and overlappings with more progressive and long-term constructions.
1.5.4. The strength of all the elements between the overhead and mountainous ceilings.
1.5.5. Shotcrete of concrete overlays for their ushkodzhennya.
1.5.6. Chastkova (more than 10%) or a significant change in the sublog (all types) and their substations.
1.5.7. Revlashtuvannya pіdlog when repairing from replacing with more mіtsnі and dovgovіchnі, in which case the type of pіdlog is guilty of following the norms and technical minds for a new life.
1.5.8. Renovation of the concrete base under the sub-log with the introduction of new sub-logs.
1.5.9. Re-laying clean board logs with revival of logs and adding new material.
1.5.10. Re-arrangement of parquet flooring with corrected or replaced reshetuvannya.
1.5.11. Re-arrangement of the underlay on the logs on the first surfaces with the correction or replacement of the foundation and the reinforcements of the stone stovpchiks.
1.5.12. Repair of the replacement of the walls of the pipelines.

1.6. Vikna, doors and gates.
1.6.1. Povna change the old windows and door blocks, and also steal.

1.7. Get off that ganks.
1.7.1. Chastkova or a successful change of skhodovyh maidanchikiv, ramps and gankiv.
1.7.2. Changing the strength of all types of convergence and other elements.
1.7.3. Replacement or repair of railings and handrails coming off over 5% of the total amount of money.
1.7.4. The power of new gangs.
1.7.5. Change of metal stringers and repair of damaged parts of stringers.

1.8. Internal plastering, facing and painting works.
1.8.1. Renovation of plasters of all applications and repair of plasters in general over 10% of the hard plastered surface.
1.8.2. Upholstery of walls and beds with dry plaster.
1.8.3. Renovation or replacement of lining of surface walls covering over 10% of the total area of ​​facing surfaces.
1.8.4. Renovation of stucco details is used in the middle of the application.
1.8.5. Zabarvlennya vіkonnih pletin, doors, stel, stіn and pіdlog after a major overhaul of these structures.
1.8.6. Olіyne farbuvannya radiators, singed pipes, plumbing, sewerage, gasification after a major overhaul of the system or a new installation її, as well as vitrati zdіysnyuyutsya for the cost of capital repairs.
1.8.7. Sutsilne anticorrosive stuffing of metal structures.

1.9. facades.
1.9.1. Repair and renovation of the cladding with an area over 10% of the veneered surface of the façade would be replaced by new tiles, or plastering of these areas with a further increase in the color of the cladding slabs.
1.9.2. Outside chi chastkove (more than 10%) plaster renovation.
1.9.3. Renovation or reworking of rods, cornices, pasques, sandriks and other protruding parts of the facades of the buds.
1.9.4. Sutsilna replacement and installation of new drainpipes, as well as the old metal and cement coatings on the protruding parts of the facades of the buildings.
1.9.5. Reinvention of stylistic embellishment and details.
1.9.6. Sutsilne furnishing of facades in budіvel with stable warehouses.
1.9.7. Change or installation of new grids and fences on cottages and balconies.
1.9.8. Cleaning of facades and socles with pistomeric devices.
1.9.9. Replacing or strengthening all load-bearing and fenced structures of balconies and erkers.
1.9.10. Changing the coverings of the protruding parts of the life.
1.9.11. Renovation of old or installation of new gates.
1.9.12. Olіyne farbuvannya façade in wooden budіvel.

1.10. Bake that middle.
1.10.1. Repair, refurbishment and installation of new stoves, kitchen fires, smeared boilers and flues up to them.
1.10.2. Povna re-laying or installation of new scorching ovens, chimneys, ventilation channels and dimovih pipes and their substations.
1.10.3. Refurbishment of scorching ovens from wood gas burning but on the singed solid fire.

1.11. Central fire.
1.11.1. Vlastuvannya central scorching zam_st pіchnogo s pritosuvannyam іsnuyuchogo pri_schennya under the boiler room and installation of the boiler room. In the case of an impossibility to stay under the boiler room for the first time, it is allowed to arrive before the actual time of the day with an area of ​​no more than 65 m2, or to open a new boiler room.
1.11.2. Replacement of other sections and units of scorching boilers, boilers, boiler rooms, or even replacement of boiler units (as stinks are not independent inventory objects).
1.11.3. Replacing the main pipeline of the central scorching.
1.11.4. Repair and replacement of extensions, condensate miners and other landscaping.
1.11.5. Vlastuvannya wine fireboxes and attach to the boilers under the blast furnace.
1.11.6. Replacing and installing new additional sections of scorch fittings and okremih fittings to the pipeline.
1.11.7. Repair, re-laying or installation of new foundations for boilers and other installations.
1.11.8. Boiler automation.
1.11.9. Changes in the insulation of pipelines, which have become unacceptable.
1.11.10. Re-laying the lining of the boiler and chimneys.
1.11.11. Putting patches on a steel boiler, boiler, steamer, tank.
1.11.12. Prepared and installed a new casing.
1.11.13. Renovation or installation of a new lining and facing of boilers of the central scorching.
1.11.14. Replacement of metal smoke pipes, which came into disrepair, like a boiler house.
1.11.15. Change of opiate registers.
1.11.16. Arriving awake to the heating lines (with a distance of 100 m to the line).

1.12. Ventilation.
1.12.1. Reinstallation of new, renovation or refurbishment of the ventilation system.
1.12.2. Chastkova chi povna zmina povіtrovodіv.
1.12.3. Change of fans.
1.12.4. Rewinding or changing electric motors.
1.12.5. Change of gates, deflectors, throttle valves, blinds.
1.12.6. Chastkova chi povna change of ventilation boxes.
1.12.7. Change of heaters.
1.12.8. Change of scorching units.
1.12.9. Change filters.
1.12.10. Change of cyclones.
1.12.11. Changes in the construction of ventilation chambers

1.13. Water supply and sewerage.
1.13.1. Renovation or installation of a new internal water supply system and sewerage, pipelines, including the introduction of a water supply system and a sewer outlet and their connection to a water supply system and a sewer line. The length of the line from the nearest water supply or sewer outlet to the street fence is not liable to exceed 100 m-code.
1.13.2. The establishment of new water intakes in the middle of the land.
1.13.3. Vlastuvannya dodatkovyh oglyadovye wells on the main yard lines or street fences near the entrance.
1.13.4. Re-laying of underground lines of water supply and sewer pipes.
1.13.5. Replacement of chavunny cisterns was taken in by serpentine cranes with reworking of water supply and shortened serpentine pipes.
1.13.6. Replacement of taps, taps and sanitary fittings.
1.13.7. Vlashtuvannya water tower.
1.13.8. Vlastuvannya of new sanitary facilities.

1.14. Hot water supply.
1.14.1. Replacing and installing a new hot water supply.
1.14.2. Replacement of okremikh davits to the pipeline of hot water supply.
1.14.3. Replacement of tanks, water heaters and water heaters, which came into disrepair.
1.14.4. Repair of tanks, coils and boilers, tie-downs and replacement of okremikh knots and details.
1.14.5. Changes to the pipeline, parts and in general pumping units, tanks and insulation of pipelines.
1.14.6. Replacing and installing bathtubs, showers and fittings to them (shower nets with pipelines, water taps, flexible hoses).

1.15. Electrical lighting, connections and power wiring.
1.15.1. Installation of new electrical lighting in residential areas community life and arrival to the electric power line.
1.15.2. Replacement of lighting electrical wiring, which has come into disrepair, replacement of installation fittings (wire switches, knife switches, plugs, cartridges, sockets), and in case of major repairs, new electrical wiring will be added.
1.15.3. Installation of new and replacement group rozpodіlnyh and outside boxes and shields.
1.15.4. Reconstruction of the electrical wiring with the installation of additional fittings at the connection with the re-planned premises.
1.15.5. Automation of electrical lighting on the exit cells of the bud.
1.15.6. Replacing the appearance and protection of electrical installations.
1.15.7. Repair of chi renovation of cable channels.
1.15.8. Replacement of luminaires in other types (especially for luminescent and others.).

1.16. Gas supply.
1.16.1. I will install additional gas equipment in apartments with access to the gas line.
1.16.2. Gasification around the apartments.
1.16.3. Replacing the Okremikh Dilyanok of the Gas Pipeline.
1.16.4. Replacement of possessions, which came into obscurity (gas stoves, water heaters) to new possessions.

1.17. Lifts and pidomniki.
1.17.1. Vlashtuvannya new lifts with usma types of budіvelnyh and assembly work.
1.17.2. Povna or chastkovy zamіna elektroobladnannya that vantage levіdok lift.
1.17.3. Posilennya, povna or chastkova change of metal structures and fencing nets of the mine.
1.17.4. Povna chi chastkova change of electrical wiring at the mines.
1.17.5. Dismantling and installation of the possession of elevators at the link with robots in order to change the noise at the premises from the permanent rebuking of people.
1.17.6. Automation of elevators.

2. Sporud

2.1. Water supply and sewerage disputes. Pipeline and fittings of the merezhі.
2.1.1. Chastkova chi povna replacement of anti-corrosion insulation of the pipeline.
2.1.2. Change the diameter of the pipeline to the pipeline without changing the diameter of the pipes. In this case, it is allowed to replace chavun pipes on steel, ceramic pipes on concrete or cast-concrete, and on the other hand, it is not allowed to replace asbestos-cement pipes on metal pipes (crym of emergency falls).
The length of the yards of the yard, for which it is allowed to change pipes, can be moved 200 m per 1 km of the yard.
2.1.3. Change of worn shaped parts, zasuvok, fire hydrants, vents, valves, water pumps or repair of worn parts.
2.1.4. Change of okremikh pipes of dyukerіv.

2.2. Water supply and sewerage lines. Kolodyazі.
2.2.1. Repair of masonry kolodyazіv.
2.2.2. Change of hatches.
2.2.3. Stuffing new trays zam_st zruynovanyh.
2.2.4. Replacement of wooden wells.
2.2.5. Renovation of plaster.

2.3. Water supply and sewerage lines. Clean up the controversy.
2.3.1. Repair or replacement (repair) of waterproofing.
2.3.2. Repair and renovation of plaster and flooding.
2.3.3. Re-laying of solid walls and partitions (up to 20% of the total masonry at the spore).
2.3.4. Laying leaks in concrete, concrete and stone walls and the bottoms of spores with concrete in different places and concrete again.
2.3.5. Sutsilne shotcrete spores.
2.3.6. Drainage repair navkolo sporud.
2.3.7. Replacing manholes of reservoirs.
2.3.8. Replacement of the gratuity.
2.3.9. Replacement of the vane of filters, biofilters, aerofilters.
2.3.10. Replacement of pipelines and fittings.
2.3.11. Replacement of filter plates.
2.3.12. Relocation of the drainage system of mule maidanchiks.

2.4. Heating. Channels and cameras.
2.4.1. Chastkova or a new change of cover for channels and cameras.
2.4.2. Chastkova or a new change of waterproofing canals and chambers.
2.4.3. Chastkove perekladannya walls of tselyany canals and chambers (up to 20% of the deep surface walls).
2.4.4. Chastkove perekladannya drainage systems.
2.4.5. Repair of the bottoms of channels and chambers.
2.4.6. Renovation of the shackle ball in the reinforced concrete structures of the channels and chambers.
2.4.7. Change of hatches.

2.5. Heating. Pipe fittings.
2.5.1. Chastkova chi povna change of thermal insulation of the pipeline.
2.5.2. Renovation of waterproofing pipelines.
2.5.3. Change the size of the pipeline to the pipeline without increasing the diameter of the pipes.
2.5.4. Change of shaped parts, zasuvok, compensators or їх repair іz replacement of worn parts.
2.5.5. Replacement of rickety and rough supports.

2.6. Automobile roads. Earthlings canvas.
2.6.1. Exaltation of the subgrade in the areas of susvіv, collapse, rozmivіv and no day.
2.6.2. Renovation of water and drainage outbuildings.
2.6.3. Reconstruction of zahisnih and replacement spores of the subgrade.
2.6.4. Change of other constructions of piece spores or replacement of them with other constructions, as well as replacement of pipes and small bridges (yakscho stinks are not independent inventory objects, but enter the subgrade warehouse along the road as a single inventory object).

2.7. Automobile roads. Road clothes.
2.7.1. Reconstruction and replacement of a few cement-concrete slabs.
2.7.2. Laying on a cement-concrete pokritti ball, which is virivnyuє, from asphalt concrete.
2.7.3. Laying asphalt concrete pavement on roads with cement concrete pavement.
2.7.4. Replacement of cement-concrete coating on a new one.
2.7.5. Strengthening the asphalt concrete pavement.
2.7.6. Perebudov crushed stone and gravel covers.
2.7.7. Brook relocation.
2.7.8. Profile of unpaved roads.

2.8. Warehouse and other maidanchiki.
2.8.1. Repair and renewal of water spores (trays, cuvettes and others).
2.8.2. Moving Brooks.
2.8.3. Perebudova of crushed stone and gravel coverings of Maidanchiks.
2.8.4. Repair of concrete maidanchiks from the laying of the concrete ball.
2.8.5. Virovnyuvannya and replacement of okremyh cement-concrete maidanchiks.
2.8.6. Pokrittya maydanchikiv with asphalt concrete.

2.9. Electric lines and links.
2.9.1. Replacement of fittings.
2.9.2. Replacement of hooks on the traverse.
2.9.3. Zmina drotiv.
2.9.4. Repair and replacement of end fittings and good cable boxes.
2.9.5. Repair or replacement of grounding outbuildings.
2.9.6. Change of supports (up to 30% 1 km).
2.9.7. Installation of cable boxes.

2.10. Other arguments.
2.10.1. Repair, replacement or replacement of other supports of overpasses for repeated laying of pipelines.
2.10.2. Repair and replacement of maidanchiks, descents and fencing of overpasses for repeated laying of pipelines.
2.10.3. Repair of chi zmina okremy columns (up to 20%) of crane racks.
2.10.4. Repair or replacement of crane beams of crane racks.
2.10.5. Repair of galleries and firing racks of boiler rooms and gas generator substations with a change (up to 20%) of the structure without changing the foundations.
2.10.6. Replacement or replacement of wooden fence posts.
2.10.7. Repair or change of concrete and concrete slabs (up to 20%) fenced.
2.10.8. Repair of okremih dіlyanok elements fencing (up to 40% zapovnenâ mizh stovpami).
2.10.9. Repair of okremikh villages with strong stone fences (up to 20%).
2.10.10. Repair of okremikh dilyanok sutsilny adobe fences (up to 40%).
2.10.11. Repair of smoke pipes with replacement or replacement of the lining, with the installation of hoops, with the reinforcement of the cast-in-place concrete pipes.
2.10.12. Repair and replacement of okremikh lanoks of metal pipes.
2.16.13. Repair of ash and slag water from a complete replacement of okremikh lines of pipelines (without increasing the diameter).
2.12.14. Repair of vantage platforms with new replacement of wooden flooring, paving or asphalt. Changes of the okremikh supports or of the subdivisions of the supporting walls (up to 20%). As a part of the warehouse object (ramp), it is allowed to change the change or change of all structures.

Perelіk robіt z overhaul of bugatokvartirnyh budinkіv, scho pіdlyagayut include to the warehouse robіt, scho financed for rahunok koshtіv, peredbachenih Federal Law N 185-FZ; Table 2.3 ( "Methodological recommendations on how to form a warehouse for the overhaul of apartment buildings that are financed for the cost of housing, transferred by the Federal Law of April 21, 2007 N 185-ФЗ "On the Fund for the Acquisition of the Reform of the Housing and Communal Reforms" 15.02.2013)

This change was formed on the basis of clarifications of changes in the work of overhaul, recommended by guidance regulatory documents at the borders of the vidіv robіt іz major repairs of the bagatokvartirnyh budinkov, vyznachenih article 15 of the Federal Law N 185-FZ. If you care, that the provisions of these methodological recommendations are being expanded on the rich apartment houses, which allow for a major overhaul without attaching any further operation. As a result of the overhaul carried out due to the replacement of the buti, all the necessary works from bringing the central lane of the bagatokvartirny booth into a technically well-maintained station by way of renewal or replacement of all parts of the structures engineering systems, yakі mayut more style terms services between chergovimi (for the normative term of service) overhauls, lower load-bearing structures.

2.3.2. The last and methodical linking of technological processes to the transfer of robots, indicated in Table 2.3 of these recommendations, is carried out at branch 3.

Table 2.3

The name of the type of work is valid up to part 3 of Article 15 of the Federal Law N 185-FZ

Pіdvidi ta perelіk robіt

Repair of internal engineering systems of electrical, heat, gas, water supply, water supply

1. Repair and replacement of engineering systems:

1.1. Cold water supply, zocrema:

1.1.1. Repair of replacement of water supply units;

1.1.2. Repair or replacement of rose mains and risers;

1.1.3. Replacement of locking fittings, including vіdgaluzhennya vіd risers near the apartment;

1.1.4. Repair or replacement in the complex of pumping installations

1.1.5. Repair or replacement of water supply, pipelines and fire water supply

1.2. Repair or replacement of the hot water supply system, zokrem:

1.2.1. Repair of the replacement of the TRZH, heat exchangers, boilers, pumping units and other equipment (near the warehouse of the coal mine) at the complex for preparing and supplying hot water to the rose subdivision;

1.2.2. Repair or replacement of rose mains and risers;

1.2.3. Replacement of locking fittings, including vіdgaluzhennya vіd risers near the apartment.

1.3. Repair or replacement of the sewage system and water supply, including:

1.3.1. Repair or replacement of outlets, selected pipelines, risers and windings;

1.3.2. Replacement of charges for their presence;

1.4. Repair or replacement of the scorching system, including;

1.4.1. Repair or replacement of rose mains and risers;

1.4.2. Replacement of shut-off and control valves, including those on service lines in risers to scorching fittings in living quarters;

1.4.3. Regrouping or replacing the scorch fittings in the areas of scorched coristing and replacing the living quarters of the scorching fittings, so as not to scorch the scorching attachments;

1.4.4. Installation, repair or replacement in the complex of ITP (individual heating points) and for the operation of pumping units

1.5. Repair or replacement of the gas supply system, zocrema:

1.5.1. Repair or replacement of internal lines and risers;

1.5.2. Replacement of shut-off and control valves, including on the supply lines in the risers to the gas fittings at the living quarters;

1.6. Repair or replacement of the power supply system, zocrema:

1.6.1. Repair of replacement main switchboard (main rose shield), rozpodіlnyh and group shields;

1.6.2. Repair or replacement of internal rose mains and risers of communal and apartment lighting;

1.6.3. Replacement of vіdgaluzhen vіd podshovyh shchitіv аbo boxes kvartirnyh lіchlіnіv i stanovnymi ta lighting fixtures communal lighting;

1.6.4. Replacement electrical tethers for living electrically operated elevators and electrically controlled for the provision of robotic engineering systems;

2. Modernization of engineering systems, including:

2.1. Obov'yazkove zastosuvannya modernization of scorching accessories and pipelines made of plastic, metal-plastic and other. that fence on the installation of steel pipes

2.2. Transferring the main electricity supply to the increased voltage;

2.3. Replacement of lighting fixtures for utility lighting needs at energy saving;

2.4. Re-dominance of thermal points and water supply points;

3. Replacement of scorching in the central

with an annex

boiler house,

heat conduction and

thermal points;

dakhovih and other autonomous dzherel heat supply

4. Owning systems

cold ta

hot water supply,

sewerage,

gas supply

with arrival

to the main main lines at the entrance to the entry point to the connection point to the mains up to 150 m,

we will add

gas pipelines,

water supply,

boiler rooms.

Repair or replacement of elevator equipment, recognized as unsuitable for operation, if necessary, repair of elevator shafts

Repair and replacement of elevator equipment with yogo modernization, incl.

1. Repair of the repair of the replacement of the elevator equipment, recognized as unsuitable for operation;

2. Repair at different needs of mines, replacement of attached mines;

3. repair of machinery;

4. Repair, replacement of automation elements and dispatching of elevator control;

5. Owning outbuildings necessary for connecting to wireless systems, automation and dispatching of elevator equipment

Dahiv repair

1. Repair of structures of ducts:

1.1. From wooden structures:

1.1.1. Repair: with partial replacement

Crooked nig,

Mauerlat

Lathings of solid and discharged bars

1.1.2. Antiseptic and antiperspirant wooden structures.

1.1.3. Insulation of the undercover (mountain) ceiling

1.1.4. Repair (replacement of auditory windows)

1.2. From cast-in-place concrete roofing and covering decks:

1.2.1. Usunennya faults of concrete floors and roof decks;

1.2.2. Insulation of the undercover (mountain) ceiling

1.2.3. repair of screed for pokrіvelnogo pokrittya;

2. Replacement of cover letters

2.1. Replacing the metal covering of dahiv from the outbuildings;

2.2. Replacing the coating of the coating of rolled bitumen materials (roofing material) on the coating of materials that are welded with the attachment

2.3. Replacing the roof covering with piece materials (slate, roof tiles) from outbuildings

3. Repair or replacement of the water supply system (zvіsi, zholobi, razzholobki, trays) from the replacement of drainpipes and vrobіv (ovnіshnіh and vnutrіshnіh);

4. Repair or replacement of overlay elements

4.1. Repair of lazіv on pokrіvlyu

4.2. Repair of products, repair or replacement of auditory windows and other outbuildings for ventilation of the city space;

4.3. Change of kovpak_v on the heads of dimovent blocks and ventilation shafts;

4.4. Change of coverings of parapets, firewalls, overheads

4.5. Repair (plastering, furbing) and insulation of smoke-ventilation blocks and elevator shafts

4.6. Renovation of the change of the fence on the mountain cover;

5. Re-installation of non-ventilated summation of ducts for ventilation with insulation of sub-roofing (mountain) overlap

Repair of the basement premises, which lie down to the sleeping lane at the rich apartment houses

1. Repairs

2. Insulation of walls and above-basement ceilings in basement premises

3. Waterproofing of walls and underlays of the basement

4. Repair of technical applications from the installation of metal doors.

5. Repair of ducts, basement windows, priyamkіv and ovnishnіh doors

6. Sealing the passages of the inputs and releases of the engineering barriers at the outer walls (to be fixed during the repair of the barriers)

7. Paving repair

8. Repair or replacement of the drainage system

Insulation and repair of facades

1. Repair of facades that do not require insulation

1.1. repair of plaster (textured ball), including an architectural order;

1.2. Repair of facing tiles;

1.3. Zabarvlennya for plaster or textured ball;

1.4. Repair and renewal of sealing of horizontal and vertical sticks wall panels large-block and large-panel budіvel;

1.5. Repair and installation on the side of the facade of the sealing of the stiks of the windows and the door openings of the area of ​​the embedding;

1.6. Zabarvlennya from the side of the facade vіkonnih binding;

1.7. Repair of fence walls;

1.8. Repair and replacement of windows and balcony doors (near the warehouse of the central lane);

1.9. Repair or replacement of external doors.

2. Works for the repair of facades that require insulation

2.1. Repair and insulation of fence walls with further improvements on top

2.2. Repair of window and balcony doors (near the warehouse of the central lane) or replacement of windows and doors in an energy-saving constructive window (window blocks with additional slopes and in.) with further insulation (sealing)

2.3. Repair of exterior doors with distant insulation or replacement of metal doors in an energy-saving constructive interior

3. Halls for both groups of budіvel robots

3.1. Repair of balconies by replacing, if necessary, consoles, waterproofing and sealing with distant farbing

3.2. Strengthening the construction of the caps over the entrances and the remaining surfaces with further amenities on the surface

3.3. Strengthening the construction of cornice blocks with further improvements on the surface

3.4. Change of vekonnyh vіdliviv

3.5. Replacement of drainpipes

3.6. Repair and insulation of the basement

Installation of collective (hot and cold) devices for the form of resource saving and control units (thermal energy, hot and cold water, electric energy, gas)

The installation of collective (zahalnobudinkovyh) fittings in the form of a calm:

Thermal energy for the consumption of scorching and hot water supply;

Calm down cold water

electrical energy,

Universities of resource management, with attachments for automation and dispatching for ensuring remote control and management;

Repair of foundations in rich apartment houses.

1. Works for the repair and replacement of foundations.

1.1. Lays that stitching, seams, cracks in foundation elements. Vlashtuvannya zahisnoy ball.

1.2. Usunennya mіstsevih defects and deformatsiy way to strengthen the foundation.

Notes:

1. In case of overhaul of structures and engineering systems at the warehouse of the central lane of a bagatokvartirny booth, which is designated by Federal Law 185-FZ, the replacement of at least 50% of the skin structures and engineering systems is required.

2. Before vnutrіshnobudinkovih systems have scorched skladі zagalnogo Lane vіdneseno: risers, scho obіgrіvayut Elements in mіstsyah zagalnogo koristuvannya have zhitlovih primіschennyah - vіdgaluzhennya od stoyakіv to Perche vimikayuchogo annexe (with Yogo vіdsutnostі - to Georeferencing spoluchennya of opalyuvalnim priladit, obіgrіvalnim Elements), scho regulating and locking fittings; Collective (zahalnobudinkovі) fit the shape of thermal energy, as well as other possessions, like stitching on these meshes.

3. In times, as in the case of the overhaul of structures and engineering systems at the warehouse of the MD sleeper lane, in addition to the technological and design features of the structures that are replaced, that engineering systems need to be dismantled or the destruction of parts of the lane cannot be entered, so it is not possible to enter the warehouse MD , the robots for the renovation of the yogo are charged for the cost of capital repairs, which can be transferred to the design and cost documentation

4. At the same time, in a bagatokvartirny booth, a scorching system with attached laying of a pipeline was designed, but not a repair and accessory one (addendum 2), while performing a major overhaul, it is allowed to add a new scorching system to the required laying of pipelines and scorching fittings, heating elements, among those in living quarters.

Before the overhaul of a bagatokvartirny booth, a complex of repair robots will be included, directing to the adoption of the days of short-lived life, in addition, in a way, we can damage the negative effects. Since 2014, the power has actually taken its own responsibility for vikonannya zahodіh zahodіv, now tsey ob'yazok put on vlasnіv zhitlіvі and nezhіlіvіvі primіshenka booth.

What is it

The appointment of overhaul and work related to it is regulated by civil law, and the specifics of carrying out similar visits to the objects of civil unruliness are determined by the norms of the Housing Code of the Russian Federation and other acts of the civil sphere. For the rule of thumb, to the warehouse for the overhaul of the object of indestructibility, enter:

  • a complex of robots, povyazanih zamіnoy or vodnovlennyam okremih parts and elements of load-bearing budіvelnih constructions and overlaps;
  • similar work on budivelnyh constructions or parts, which are not included before the transfer of bearing ones;
  • renovation or renovation or partial replacement of engineering and technical communications of a rich apartment life.

As soon as the overhaul of the housing stock is carried out, direct work will be carried out at the turn of the living room of a particular booth, which will replace the replacement.

Depending on the features of the housing stock, overhaul can be carried out at the sight of planned works emergency robots. According to the plan, the robots are moving at the vipadkas:

  1. as a streamlined construction mill can cause damage to the situation or the destruction of the object;
  2. as it is indicated by the influx of circumstances of non-separating force, which may have a spontaneous taraptian character (for example, ruinous natural phenomena);
  3. yakscho camp okremikh bearing chi іnshih budіvelnih constructions reshuffle the main target signification of rich apartment budіvlі - the carefree living of the hulks.

The law allows repairs to be carried out in booths, recognized as emergency in an official order, only for the purpose of putting a threat to safe bags until the moment they see other living quarters.

Carrying out scheduled repairs is to be carried out by way of inclusion of rich apartment houses at the regional transfers (registries), which are to be conducted by vikonavchi authorities of the sub-registries of the Russian Federation. Storing the appointment of relics as one of the elements of the mechanism for reforming the housing stock, the shards of money for the carrying out of the working stage of the overhaul are accumulated for the refurbishment (extra) expenses of the living fund.

Indications perelіk peredbachaє vіdnesennia overhaul of the skin booth before the singing calendar period - fate. Shards of perelka are hardened at the regional level and are located at open access, fixed individuals may be able to be installed at some point, so that the inclusions of their booths to the register for overhaul, in which case the planned work will be carried out.

For the Fund for the reform of housing and communal services, the formation of the transfer of the necessary work from the overhaul is carried out in two stages:

  • obov'yazykovy regulation perelіk robіt, zatverzheniya on the federal level (wine not pіdlyagaє zmіnі navіt for decisions vlasnikіv zhitlіvіshcheni);
  • the supplementary complex works, the change of which can be used to designate the wealthy apartment life for the best decisions of the masters of living quarters.

The additional change of budіvelnyh robіt will be occupied only by rozmirami vneskiv, chosen and accumulated by the hulks at the time of laying down the contract. Ponad those who zaznachenih koshtіv hindered the planned repair goals, can issue a loan from banking institutions.

The federal transfer of work for the overhaul of rich apartment buildings includes:

  1. іnzhenernі kommunіkatsії, roztashovanі in between budіvlі and scho enter to the warehouse zagalnobudinkovogo lane - elements of water supply and water supply; opal system; electrical communications; gas supply system design features budіvlі);
  2. service system of the elevator state (replacement of the replacement of four elements of the entire system);
  3. repair and maintenance work on the roof of the building;
  4. vikonannya budіvelnyh robіt on the elements of the foundation chi pіdvalu;
  5. carrying out repair and maintenance work on the facade of the building.

It is necessary to ensure that the federal list of appointments is, it is possible to expand it less on the equal subject of the Russian Federation. It is worth to lay a deposit in view of the features of the exploitation of the housing stock, the degree of deterioration of the rich apartment buildings, the financial possibilities of the budget and the expansion of the contribution of the meshkants. Zakrema, before the warehouse works for the overhaul, the insulation of the interpanel seams and the facades of the building, the installation of the lichilnik in the energy resources are included.

As soon as the lords of the living quarters take a decision on the issue of a special account for the collection and management of contributions for overhaul, they can immediately set up an increase in the amount of payments from the expansion of the transfer of work. This decision may be brought to the attention of the regional operator, and the overhaul of the company due to special construction works may be carried out according to the regulated terms.

Carrying out a regulated additional transfer robit s overhaul zdijsnyuvatimetsya at the borders of the contract. As a way of managing the contributions of the community, a regional operator will be held, a competition for the right to carry out a major overhaul will be held. For whom there will be victorious vіdomosti z perelіku rich-apartment budіvel, among them, with the appointed terms vikonannya robіt. Apparently, as a result of the decision of the Vlasniks, the overhaul will be carried out earlier than the terms assigned to the regional transfer, before the contract agreement, additional work will be included.

For the actual implementation of the work on the overhaul of the housing fund, the regional government can finance for the expenses of the community of the bulk of the offensive transfer of the accompanying services:

  • Carrying out the entry of a well-equipped apartment life or other small structures, as well as the storage of koshtorisnoy documentation;
  • zamovlennya author's architectural and design documentation;
  • provision of engineering and technical communications;
  • carrying out inventory visits to determine the normative and actual depreciation of a bagatokvartirny booth.

Based on the selected information about the budinka camp, a comprehensive or vibratory overhaul is being carried out. In case of vibratory repair, replacements and renewals are less likely to be okremі budіvelnі designsії and elements of budіvl, even as complex work will be directed to the adoption of short life cycles.

In this rank, the rulers of living quarters can appoint a list in advance obov'yazykovyh robit, as if they would be vikonans at their rich apartment booth. If necessary, this change can be expanded at the same time for the increase in the size of the population.

On the 1st day of 2017, Moscow received a reduction in contributions for a major overhaul. This novelty tempted us to break up - what kind of contributions, where do you go, who is crying for them? Let's learn from the history of the request for investments for overhaul. On December 25, 2012, President of the Russian Federation Volodymyr Putin signed the Federal Law No. In other regions of the country, payments were made during the 2013-2015 period. Vіdpovіdno to the law, vlasniki apartments are guilty of paying a penny contribution, appointments for the overhaul of the main lane of the bagatokvartirny booth. Tsey contribution is included before the rent and obov'yazkovim.

Vlasniks of apartments in the Russian Federation pay a binding deposit, which directs them to a major overhaul of the main lane in a bagatokvartirny booth. The minimum amount of the deposit is determined by the subjects of the Russian Federation and is set in rubles from one square meter of the total area of ​​​​the premises, which the vlasnik should have. Obviously, the skin clerk is guilty of making a payment to the established rozmіrі. The future accumulation, which they have settled, will be spent on carrying out repair work at the apartment booth.

Let's pay for overhaul for one square meter The areas of accommodation can be reclaimed fallow in regions, as well as in terms of the type of accommodation. They are confirmed by the legislative acts of the subjects of the Federation.

On 1st April 2017, Moscow introduced a new minimum contribution for major repairs, instead of 15, it will be necessary to pay 17 rubles per square meter.

The amount of the minimum sum for the overhaul at Moscow was requested by the Ordinance of Moscow No. 851-PP dated 13.12.2016.


Who can pay?

Even at the time of the adoption of the Housing Code of the Russian Federation in 2005, it was appointed to pay for the overhaul of the main lane. However, the same decision about zaprovadzhennya pay for major repairs and її rozmіr Vlasniki accepted the accommodation at their zagalnyh collections. If such a decision was not accepted, then the payment for major repairs before the payments of the vlasniks was not included. To that, a change was made to the Housing Code of the Russian Federation, yakі goitre yazuyut vlasnikіv shomіsyatsya splchuvati vneski for overhaul zagalny lane budinkov. The introduction of contributions for the overhaul of goiter is due to all the vlasniks of the living and non-living places at the bagatokvartirny booth:

  • the hulks;
  • legal persons;
  • to the rulers of the sovereign and the municipal offices.

Vіdpovіdno up to part 2 of Article 154 of the LC RF such contributions are included up to the structure of the payment for public services that living accommodation. To that, the Vlasnik cannot turn on the payment himself, or he cannot pay extra for special payments.


It is necessary to remember that the borg from the outside for the overhaul of the sleepy lane follows the share of the application. Tse means that the new sergeant-major can pay off the fence of the previous sack-keeper.

Part 1 of Article 154 of the LC RF transfers that the payment of the goiter is less than the life-keepers of the living quarters and the non-living dwellings at the rich apartment houses. The renters of the sovereign (i municipal) apartments do not pay for overhaul, oskolki tse obov'yazok vlasnikiv municipal chi sovereign housing fund.

Chi pіdtrimuєte vy provodzhennya neskіv on overhaul?

Poll Options - let's add JavaScript to disabled in your browser.

Whom can you call to pay extra fees?

Vіdpovіdno up to part 2 of Article 169 of the RF Housing Code to pay extra fees for major overhauls

- at the bagatokvartirnyh budinki, yakі bully recognized as emergency that;

Quote from the article -

- At the rich apartment booths, for which there is a decision about the selection for municipal or state needs of land plots, which are engaged in these booths.

Where to pay for capital repairs?

As soon as the vlasniks are repaid to a special regional fund for overhaul, then the government of the region itself virishu, like budinki to repair for the rent of the chosen koshtiv. If you go to a special bank office for the decisions of bagmen, all pennies are spent on the morning of a particular house. Vіdpovіdno to the position of the Housing Code of the Russian Federation to the warehouse for major repairs obov'yazkovo include repairs:

  • dahu, at that number perebudova;
  • facade, including one insulation;
  • foundation;
  • underground basements;
  • engineering internal systems, including the replacement of electrical wiring and elevators.

To the decisions of the Vlasniks of the living quarters of the subject of the federation, this change can be expanded.

What are the sanctions for non-payment of payments?

Yak has already been planned, contributions for major repairs have been installed federal law and be included before payment documents for communal state. And if so, then the sanctions for non-payment will be the same, as in case of non-payment of utility bills. Borg with fines for non-payers are sued through the courts. Zrozumіlo, it is not possible to hang a sergeant from a single life, who has accumulated a lot of fouling, but they can still impose other sanctions, for example,.

Reportage “Tariffs for overhaul will index the snail of 2017”

Join the discussion
Read also
Like the signs of the zodiac fit one to one at the kohanna - a horoscope of wisdom
Yak formed a share of the show's wives
We didn’t check the wedding: how to live the finalists of all seasons of “The Bachelor Maxim Chernyaev and Maria Drigola”