Subscribe and read
naytsіkavishі
statti first!

Electric introduction into the booths behind the auxiliary cable sip. Connecting to vimikacha is an adventure. Sequence of actions when the cable is connected

After putting a self-supporting droid into operation by local energy-supplying organizations, it is not uncommon for a power supply to be connected to that transfer to the supply office of an old station with the same SIP wire. This advantage in front of other conductors is in the presence of an insulating shell, as it does not only protect the wires from the inflow of the outer middle, but also facilitates unauthorized access to admission, which became the reason for this popularity. At tsіy statti mi rozpovimo, like a viscounty, the connection of SIP to the booth, pressing different ways montage with photos and videos with butts.

Connection methods

When organizing the introduction into the booth, it is possible to close up with it, so that the minimum perimeter lived to become 16 mm2, after which the difficulties in closing are blamed, for the hour of organizing the connection at the entrance shield. Therefore, when connecting SIP to the booth, organize a transition to another type of cable:

  • through the terminal block;


  • vicorist zatiskachi "peas";


  • vstavlyuyuchi on knots polished dart a box for automation, vikoristovuyuchi clemy automatic vimikacha for zatiskannya drota.




  • connect without intermediary to the lichnik (also through automatic).


The connection with the opening, to the introductory oblіkovogo building, is even more painfully accepted by the inspectors at the hour of the reception of the client and the introductory SIP. Energy-supplied organizations can succumb to your deeds "evil us" to the future. That is why it is necessary to find out in advance and find a way to get connected.

Now we can look at the leather way of okremo. Remember that it is passed through the wall, zgidno z PUE, it is necessary to pass through the metal or other fire tube, for the possibility of replacing it in the future.

The advantage of connecting CIP to the booth through the terminal box under the seal is ease and ease of installation. Nedolіk polyagaє in the fact that if it is, it will require periodic maintenance, and the box is sealed, so that it is impossible to service the glue.

Clemy "peas" - a simple and affordable way to transfer from a self-supporting insulated conductor to another type of cable. On the minus side, you can see access to the terminal and the door, as well as a weak transition to the inflow of the outer middle.

Installation of a box with a machine gun on the descent and transition. Clemy on the automatic vimikachi may be able to hit the wire of the great cut, moreover, the machine can win the shutdown function. The minuses of connecting the CIP to the machine are described in the first paragraph: the impossibility of servicing the call and at the time of the request automatic zahistu it is necessary to push up to the box for resupplying the voltage.

The introduction of SIP at the shield is also one of the available connection options. The main advantage of this variant is wired with a large number of pieces connected to introductory annex. Nedolik - it is necessary to choose a box for introducing a larger opening, so that the loop is placed in the middle and there is a possibility for installing an electric chiller with automatic machines.

Technology for installation

Also, from the most successful methods, the most optimal way is to connect the CIP to the introductory machine in the shield. This installation option is shown in the video below:

To connect a self-supporting insulating wire to an automatic switch, it must be pressed forward. As you see, you can look at the video-look.

It has been deconstructed for the first time by the engineers of Finnish framing companies for the introduction of energy sources as an alternative to bare aluminum wires and cable cable systems. The installation of such lines is important for visualizing particular newcomers. Significantly, various technological operations have been forgiven: laying supports, connecting SIP to SIP, to main power lines, to spozhivachiv.

See that technical characteristics

Today, the market of electrical materials presents various options self-supporting wires: in SIP-1 - chotyriprovidny vykonannya with zero load bearing for 380 V trusses - up to folding systems, which include control conductors, і SIP-3, covered for Rated voltage 35 kV. Insulation, as a rule, is made from a sewn stabilized polyethylene resistant to ultraviolet radiation, current-carrying lived with a retina of 16 to 150 mm 2 - from an aluminum alloy. SIP is issued for special recognition: sealed (SIPg), which does not support fire (SIPn) and others.

The leather brand is wired, may have its own particularity, vydpovidno, zastosovuvana for installation fittings may be of particularity. behind functional recognition all materials can be uploaded to kilka group:

  1. Promіzhnі pіdvіsi, hooks and brackets, anchors zatiskі, krіpilnі elements, priznachenі for fastening darts to supports, constructive elements, facades budіvel, rozpodіlnyh vstupnyh pristroїv.
  2. Piercing zatiskachi. Serve for the meeting of the z'єdna and vіdgaluzhen linіy, podklyuchennya SIP to provіv і spozhivachіv.
  3. Grounding kits, outbuildings, insulating materials.
  4. Tools and attachments for installation.

For the preparation of materials victorious high-grade steel with anti-corrosion coatings and polymers, resistant to atmospheric inclusions and UV-vipromination.


Must follow the rules!

In addition, the norms of laying insulated lines (VLI) are in accordance with the normative document "PU VLI up to 1kV", laid down on the basis of the PUE (Rules for the Construction of Electrical Installations) with the improvement of the standards of the current SNiPiv and GOSTs. At the PU, the minimum allowable lines of wires for overhead lines to the surface of the earth, automobile routes, ship-floating mains, walls and dahiv budivel, windows and balconies are prescribed. Readings are given on how to install and fix the power supply lines, the rules for connecting CIP, attaching a shield to overvoltage and grounding elements.

The minimum term of the CIP service, like the virobniks sing, becomes 25 years, and about 40 statements. redundant lines- reduction to a minimum of labor costs for installation, operation and maintenance.

Main highway

At the beginning of the preparation to the main work, the territory is cleared from the great trees, chagars, making room for the installation of supports, stretching and stretching the SIP. As far as possible, the brackets for darts are mounted on the ground. The laying of the repeated lines should be carried out at a temperature dovkilla higher -10˚С. SIP is laid along the supports behind the auxiliary system of rollers and tension rope. Then a step-by-step stretching and fixation of wires on the skin was carried out with a lead. The tension force is controlled by a dynamometer (optimal tension values ​​are indicated in the tables for skin type and CIP, for supra technical documentation). Vodnocha carry out visual control of the magnitude of the sag. If the length of the main line is overweighed by 100 meters, and the length of the wires is 50 mm 2, the higher-ranking works are dependent on the best mechanization.

On the extreme supports, behind the clamps, the release of wires for the connection of the front and the forward section of the power transmission line.


Connection and wiring

The traditional wires for buggy electrics, in self-supporting systems, have been replaced by special sealing fittings - hermetic seals that can be pierced. For their help, without znyattya, insulation is given quickly, arrogantly, and it’s even more important, safely to connect the SIP to the SIP-main, to the bare aluminum darts, or to the cables that go in. The mechanism, which ensures good contact, consists of plates with pyramidal teeth and a hard screw with a visual head (mostly a wrench of 13 or 17 mm). At current zatskachakh, the electrical contact between the plates and the head is turned off, so for the obviousness of the high qualifications of the vikonavtsya, it is possible to vikonuvat without stress. On the hull, reinforced with fiberglass, there are cuts of the main and secondary lines, for some purposes, zatiskach.


Installation of vіdgaluzhen

Vіdgaluzhennya to spozhivachіv can vykonati potryanoy linієyu chi underground cable. When electrifying private households, it is most common to block the first method. For connection, you can use SIP-4 (without a supporting zero lived). On the closest to the main support, mount the anchor fastened from the clamp for the bolt. When connecting SIP to the main line (only after the installation of wires at the shield!) Vicorista is described above as a piercing extension. Another fastener is screwed onto the wall of the bud (at a height of not less than 2.75 m) and pull the wire. If it is more than 25 meters, it is necessary to install an additional support with clamps, which will support (not far from 10 m from the wake). The height of the drotu from the surface of the earth between the supports can be no less than 6 meters. From the drive of the rules of the distant laying of the line from the point of attachment to the entrance shield, the appearance on the forums of electricians is carried out steadily zhvav superechki. What is the essence of the problem?


Options, if the electric switchboard old wall budіvlі, scho mayzhe not cry out superechok - CIP is recommended by launching a cable channel into the corrugation, fixed on the facade, put it into the shield and connect it to the opening machine. And how should the electrical panel be used in the middle of the application? In this way fakhіvtsі-electricians, for their perekonanny, divide into two irreconcilable camps.

The first ones confirm that SIP can be inserted through the opening at the wall from the front-mounted metal or plastic sleeve to lead inside the wake and far away in the wall - onto the shield. Їх opponents mention that self-supporting wires are only used for laying repeated lines and on SIP insulation, permanent contact with the surface of the wall and mechanical stress is negatively indicated, and it is not possible to ensure that electricity is laid without heating in the middle. Therefore, near the point of attachment of the CIP, install a sealed box with either an automatic switch, and go to Budova with a cable (for example, VVGng).

Who's right?

Having offended the options, make them wider and do not call for a list from the side of the controlling organizations for the hour of the reception of the wake. A lot of cable products have been developed by the authorities technical mind she mastered the release of the SIP-5ng drota, for their zapevnenny, attached for laying the middle ground. Ale, yakscho already exactly follow the letters normative documents(PUE and GOST R 52373-205), another option with the installation of a successful sealed box looks more important.

Now there is no more visconate connection CIP to CIP on the entrance support for an additional hermetic seal, which is pierced. It remains to be seen that it is recommended to fix it only once, if any modifications may be made to dismantle the bolts.


Maintenance and repair

Statements by the terminators for the operation of self-supporting wires and clamping attachments, which are used to connect SIP to SIP, can be up to 40 years. Service, like this, similar systems do not require. Suffice it to conduct a periodic visual inspection. What if there will be damage to integrity insulation cover or they themselves lived, it would be necessary for the viscount repair work.

A vein with a low-density insulation of water-cream is laid in a tanned bundle for additional special wedges or handy outbuildings from a dielectric material, and a hanging ball of insulation is applied to a defective board.

At the time of the fluctuations of the streamer, they lived (up to 2 m long) and replace the quilt with a new dart, similar to that brand for the peretina. Z'ednannya vykonuyut airtight zatskachami, sho pierce. For a greater life, more will replace the entire vein (abo jgut).

Competent installation and timely repairs are the guarantee of an uninterrupted electric supply to the dealership.

More and more often, self-supporting insulation wires replace the ringing cable for us, becoming stuck when introduced into the booth from the overhead power lines. And here there are a lot of people who are stuck with the problem, but how correctly CIP connect to the machine.

For insertion into the booths, 90% of the wipings are made with a CIP band of 16mm2. It would have been easier to take a double-ended aluminum tip of 16mm2 aluminum wire), pressurize and connect. However, on the introduction to the booths, it is practical to start using modular equipment. І for її contacts in such an axis, lugs of 16 mm simply do not fit beyond the overall dimensions.

Other brands of tips, which at first glance could ideally be used for consumption, but there is only one problem with them - all stinks are covered for medium conductors.

The most ideal and correct solutions here will be to move to the middle on the facade of the booth, even before entering the switchboard.


Nikoli self-supporting wire do not start without interruption to the booth. СІП, yakscho vin not brand Hg - combustible material. That's why it's necessary to move from aluminum to middling at home. And then, with the middle cable, pull the darts to the junction boxes or the shield.

And what about the work, like the connection on the facade through the clasps, that they will pierce you for some reason, there is no power, but the energy supply is organized in a general order, vim.

In my opinion, there are a few options for connection. Let's take a look at them.

  • without intermediary connection of CIP to the ultimate automatic machine without any work with wire and tips
  • connection of SIP to the machine with a change of contact surface of the bare core
  • connection of SIP to vimikach navantage or automatic machine with a round pressure bar
  • connection for additional sleeves
  • SIP connection via contact terminals

Without intermediary connection to the automatic machine

Tse connection may have the right to life and more electricians themselves in such a rank to win. Contacts of automatic lumens allow connection of both medium and aluminum conductors. The axis is for example an official statement from the ABB company on the possibility of connecting aluminum wires to their possession, and to modular automatic machines. It’s true, varto signify that it’s not about SIP itself, but just aluminum wire (taken from the star).

It’s too bad for someone already having such a connection and attacking the next (discussed from forumhouse.ru):




Through the rich-stranded structure of the CIP wire, for yogo zatiskannі at the sizable contact of the machine, the rears lived in full contact, and there was only a minimal area of ​​contact possible.

Below is a photo of the correct CIP after it was pressed in the automatic machine, to make sure that everything else was squeezed by the contact surface (before that, it was transferred through the underpressure of the susilla).

As a result, after a couple of three years, the contact begins to heat up and burn, the CIP insulation melts.

Even more so, through a river twist, such a contact can be calmly turned over at least a quarter of a wrap. Why don’t you rob yourself of a zreshtoy get out-purely burn yourself automatic wimicach, and then you need yoga replacement.

You have a good CIP with you in reserve, for the one who littered the house, who got burned, to be brought to the test, cleaned up and started again. The problem can often be mitigated even periodically, if you want to use a few times on the river to make contact on the machine. Ale tse zavzhdi it’s possible.

So the energy-supplied organizations will seal up the entire closet with a machine gun and a nameplate, or a cover is put on the machine, as it is also blamed for a seal. I will no longer be able to access vimikach's contacts.


One more minus - if you have a raptom CIP showing not 16mm2, but 35 or all 50mm2 (there was simply no other), then in modular automation up to 40A wines are simply not available. Most of them, as a rule, are insured for the opening of the entry conductors up to a maximum of 25mm2.

Contact surface change

Another option is to clean the SIP vein with a small margin. Then, with pasatizh, we twisted the bare end of life more and more, having created khіba scho one goal with rich veins. In such a rank, a more twisted wooden house lived. І already connect yoga without intermediary to the contact of the modular machine.

In the automatic machine, such twisting does not roz'zhzhaєtsya on the okremі lived and the contact needs to be repaired. Ale, I know, after all, behind the brown area, the embossing of this method is not the best. And if you win the challenge to the maximum, then in the next hour, though even more, lower for the first option, the contacts all the same will be brought up.

You can simply, without bothering, wind a 2.5mm2 okremy bandage on a bare yard and put it into the machine.

And at the same time, at the very least, increase the transitional support, loosen the contact force without intermediary contact, and do not secure the sealing.

Connecting to vimikacha

This method is still being established at the first stage of installation work when purchasing materials. The deputy of the introductory machine varto must come vimikach navantazhennia. What stench is better than automatic vimics can be found in the article.

On the right, in that most of the modular vimikachiv navantazhennya may have special contacts, in some of them the pressure bar is not flat, but round. The very form of the contact surface is good at CIP, without crushing it, and without suffocating enough for the core area of ​​the seal. Є th automation with a similar form of tight clamps (as a rule, expensive and well-known brands), then use it respectfully in the store.

Even more increase the pressure of the aluminum contact in the terminal of the machine to allow the filling of the supercont oil. Having smeared the SIP vein with it once and tightening the contact, the transitional opir for the claims of the virobniks will be left with the inevitable stretch of many years. And tse means the duration of heating and the need for periodic tightening of the contact. Reach for the price of the one that comes to the warehouse of oil to enter up to 70 cm of midi.

Connecting the machine to CIP for additional sleeves

As mentioned earlier, standard aluminum tips with pin contacts are not allowed. Other firms have less insurance coverage for honey darts. Natomist is a great choice of aluminum sleeves. І in case of proper legality and some reworking, we can easily take the shape of the contact surface.

A standard 16mm2 sleeve is taken.

The sleeve is cut navpil. Three centimeters is enough to make good contact. We will sweat out in the breams and flatten out one of її kіntsіv. Rob the design on the flat tip.

Farther flattened to the eye, the shoulder blades need to drain. You can use sandpaper, you can grind with a grinder disc or just a saw. The surface is as close as possible to the contact of the pins under the automatic vimikach.

Bazhano robiti yogo in such a way that you can get into the vlaziv at automatic machines of various types.

After all preparatory work, the tip is inserted into the CIP and pressed with a hydraulic press. To ensure the tightness of the SIP at the contact point, the entire structure is protected by a thermally insulating tube with a diameter of 10 mm. Isolute with a tube obov'yazkovo, otherwise between the sleeves, which are exposed on the introduction into the machine, a small gap will come out. Such a pin contact can be created for any type of automatic vimikachiv. Navit at the place of connection of comb tires.

Well, once you connect the SIP to the machine, forget about this contact, rather, add a special transitional sleeve from aluminum to mid.

Press SIP in the aluminum part, and on the mid side of the plant, all the same as described above.

If you squeeze into the machine, there will be a medium pin contact and no stickiness to the material with further weakening of the contact surface, you will not be afraid. With this, in the middle part of the sleeve, it is better to insert a monofilament of a double cut in front of it and press it all in with a press.

Let's do it again again, grind it in the breams and the transitional contact is ready.

If the sleeves are sharpened and you don’t know, you can beat them for direct confession. It's just that in the middle of the cabinet there is a copper monocore and an aluminum SIP. Naturally with the offensive insulation of the entire structure of the tube HERE.

CIP connection to the vending machine through the terminals

And why work, because all the automatic machines and SIPs have already been purchased, but it’s not possible to take care of handicraft processing of good shells for an hour or a day? When you want to reach normal contact with the factory materials.

In this case, it is possible to use a variety of special transitional contact terminals. You can come to them from the quiet places themselves, de purchasing CIP. The axis is one of the similar terminals from Ensto. It is called won - a clement for possession KE 12.12.

On the contact surfaces of the adhesive there are edges, which penetrate through the oxide ball, building to settle on the conductor during three-way operation.

More KE 12.20.

The remaining figure is the length of the pin contact in millimeters 12mm and 20mm. The rest, after having been expanded, can be beaten in automatic machines or ELV from a deep landing place under the vein of the dart.

Plus zastosuvannya similar cleats:

  • factory vikonannya
  • above transition from aluminum to copper
  • you can zastosovuvatsya as with aluminum introductory drotom so with medium
  • solid pin contact
  • insulating the contact with a case made of non-combustible polyamide
  • important distance in stores, mainly for shopping
  • maybe there is one more additional transitional contact to the machine
  • puff bagatose drotu to be played with the end of a gwent

One more positive moment is that the connection between the terminals is close to the contact. So, for example, in the case of a significant contact of the machine, according to the recommendations prescribed in the documentation, or indicated directly on the body, the maximum tightening torque is to be blamed but in the ranges of 3.5 Nm.

If it’s only mid, then that zusilla is enough. What about aluminum? 100% confidence is no longer possible. If you want to tighten it tighter, you can use gvinti or deform the machine itself. Zagal nothing good.

And in the ENSTO KE 12.12 terminals, the maximum tightening torque at the connection point of the aluminum conductor is 10 Nm!

Might be bigger. Reach out for the rahunok of the wintiv screwed hexahedron, replace the sizable screw. Well, the pinned lubrication contact, even though you can calmly tighten it in the automatic.

Depending on the sum, it is possible to make a visnovok, which, according to the method of connecting CIP to the machine, is to be deposited mainly in the form of two factors:

  • at what stage of installation work do you know
  • availability of other components at nearby stores
Well, if you want everything to be done according to Feng Shu and according to GOSTs

GOST 10434-82 2.1.11. Choice of contact connections for rich conductors of wires and cables with flat or pinned wires to be wired:
for conductors with spanning 16 mm2
with nested visnovki - for additional pin tips in copper-aluminum or with hard aluminum alloy

then don’t be stingy and buy a replacement for a modular, automatic switch from a cast case


SIP(self-supporting insulation wire) more and more often replace non-insulated, “bare” wires. You can connect CIP more simply and quickly.

Advantages for SIP cable

Provid SIP is gaining more and more popularity among fahivtsiv for various reasons:

  • СІП is signifi- cantly mіtsnіshiy, as if to match with non-insulated wires. Yogo richly folded rozirvati, splintered cable is folded from a slew of darts. At strong wind otherwise the snowfalls of old darts are often torn, crying out for a short chirp;
  • on SIP in severe frosts and snowfalls do not settle kirzhan kirka (through polyethylene insulation). In such a rank, there can be no doubt that the cable is well exposed to temperature fluctuations, frost, fall and other atmospheric influxes;
  • CIP safe, lower "naked" darts;
  • a cable of this type is easier to connect through a well-thought-out system of roof fittings and other design features;
  • SIP fireproof;
  • cable over and over. He can speed up more than 25 years.

Understandably, with such a set of advantages, CIP is more expensive, lower non-isolated darts, but richly coristuvachiv, to give advantage through the possibility uninterrupted work that safety.

Rіznovidi СІП

Carry out the ventilation with the building and materials:

  • СІП-1, СІП-1А (cables are covered with polyethylene insulation, which guarantees resistance to ultraviolet changes. Zero aluminum core was not insulated);
  • СІП-2, СІП-2А (all of them lived insulated with polyethylene. Conduct vitrium in the fall and low temperatures, which is the case in regions with a cold climate);
  • SIP-3 (single-core cable. Aluminum core is insulated with light-stabilized polyethylene. This type of cable withstands temperatures from minus 20 to plus 90 degrees Celsius);
  • СІП-4, СІП-4n (all lived insulated with light-stabilized polyethylene. Such a cable is resistant to UV radiation);
  • SIP-5, SIP-5n (two and more lived, insulated with light-stabilized polyethylene. Cable withstands high temperatures).

How to connect SIP

Before that, how to replace old darts with SIP 2x16 (de 2 is the number of darts, and 16 is the number of darts in mm2), it is necessary to vikonate complex of entrances:

  • take in the energy supply (or other competent government agency) documents that confirm your right to connect to the electricity supply;
  • take into account the project of connecting a private booth;
  • connect the electricity supply to the house of the next line.

It is important that in the order of the budinki (at a radius of 25 meters) there was a support of the red line. If there is no support, you will have to install it.

What is necessary for connecting CIP to the house

To vikonate the robot, you need the following details and attachments:

  • provіd СІП;
  • anchor clamps;
  • vіdgaluzhuvalnі prokolyuyuchi zatiskakhі;
  • hooks for fastening to the booth.

Sequence of actions when the cable is connected

The work can be divided into a few main stages:

  • at the same time, it is necessary to swing the cable behind the auxiliary rollers or manually;
  • then we need to fasten the cable at home for an additional anchor clamp;
  • far stretch the SIP between the house and the support;
  • then fix the cable on the support;
  • wires for electric power supply, next connect to the wires of the redundant line.

The connection can be made at a height of at least 2.75 meters above the ground. The conductor is not guilty of sagging between the support and the booth under the vlasnoy vaga, but it’s not guilty of being overstretched.

It is also possible to install a lichilnik on the support of the power transmission line or on the facade of the house (when you need to use the drawer or the box, so that you can secure the protection from the snow or the dripping board).

Chi you can start CIP at the booths

After the master has connected the CIP and added the cable before the time of entry into the booth, you can choose from two options:

  • run a cable at the booths;
  • zrobiti rozriv, schob z'єdnati cable z іnhim, "home".

Some fakhіvtsі vvazhayut that SIP can win only on the streets. Inshі stverdzhuyut, scho open at the conductors in the region of negligence with a look of safety. To that, more and more often, design organizations allow you to run a cable at the booths. For this type of CIP (for our type it’s better to have SIP-4 vikoristovuvaty) put on the input machine a separate internal shield, and then we will install the internal distribution of electricity for all applications.

Often, the masters consider the possibility of installing up to an explicit additional automatic machine (double-pole or chotiripole), to some kind of CIP. After a new one - VVG cable(medium single-core or multi-core cable with insulation and outer sheath with polyethylene or PVC). In this rank, offensive darts are added - both street and home. Crossing between wires is safe and secure.

SIP at the wooden booth

In wooden private booths, the safety of sleeping is especially great; Better for everything, the project organization has requested to switch to the booth from the SIP cable to the cable from the middle conductors, for example, VVGNG. Fire insulation will help you to save sleep. For complete safety, place the cable at corrugated pipe, and the passages to pass through the walls, install metal bushings.

With this method, the cable can be protected from the shrinkage of the booth, as well as from the rodents. Metal bushings, when lit, will not let the fire spread to the tree, which is standing nearby, otherwise it will not be.

Prihovany held in wooden booth better not to work with the mirror for safety. If you still choose this option, the cable must be placed in steel pipe, what localizes the fire at the hour of the fire

Another option is to lay the cable along the plaster chamber (the thickness of the plaster is to be 10 mm or more). But this method of master is not recommended, because cracks can appear in the plasterer in an hour, after which the security of the booth and the yogo meshkantsiv lean against the threat.

CIP can connect self-tapping, as only you know well on electrical robots. Otherwise it's not safe. As if you are not convinced, that you independently enter into the procedure, in a rich richness of details and folds, you turn to a professional.

Today's installation of self-supporting insulated darts(СІП) є the necessary process that increases the level of safety settlements, and significantly short energy vitrati. Calling for the choice of a militant cover of wires, the flickering is switched off, among other things, through the presence of a plug with a stream-conducting elements, and the impossibility of shaving a dart.

Installation of SIP darts

The process of installation of wires includes the necessary details, the completion of which guarantees efficient and long-term operation. Briefly, the installation process includes:

  1. Primary cleaning of the installation area.
  2. Razkochuvannya and regulation of wires, as well as safety of short-torque wires with strum-conducting elements.
  3. Installation of brackets.
  4. Installed supports.
  5. Rozkochuvannya SIP.

In order to manually engage in the installation of the SIP cable, follow the folding technical equipment, for the help of which the fastening of the string clamp, trimming of the lines, fastening of the brackets, rolling of the roller and the rope - leader. Such possession can be not less than acquisitive, but overturned by the hour. Therefore, the process of installation of wires is not safe and it is necessary to trust the hands of professionals.

Damage, as it is necessary to unify the installation of the SIP cable

Through ignorance, or in times of unqualified workers, the chances of turning on the power supply or serious injuries to practitioners increase in times. Before typical pardons be seen:

  1. Rozkochuvannya wires on strumoprovidnyh surfaces.
  2. Re-assembly of clamps.
  3. Insufficient number of clamps for dismantling.
  4. Selection of non-standard tools for robots.

In order to avoid such pardons, to trust the process of installation of the SIP cable to the contractors, as if in their robots they win only a new and somewhat new possession, to have all the dismantling elements in their order, and to have the qualifications of the maitre.

Why should you entrust the installation process of SIP slide to us?

Our roztashuvanni є is less overturned by the hour and the best technical possession domestic and foreign production. Our masters can not only have a solid work certificate, but also a license for the right to exercise their duties. We guarantee you installation and dismantling of high quality in any locality.

Our main achievements:

  • Efficiency;
  • mobility;
  • Efficiency;
  • Yakosti Guarantee;
  • Democratic prices for the installation of SIP.

We recommend installation of CIP at a price that is acceptable for skin, regardless of folding. Krіm tsyogo, our firm pronounces the services of

Join the discussion
Read also
Like the signs of the zodiac fit one to one at the kohanna - a horoscope of wisdom
Yak formed a share of the show's wives
We didn’t check the wedding: how to live the finalists of all seasons of “The Bachelor Maxim Chernyaev and Maria Drigola”