Warmth for a private booth. Wooden technology for laying warm underlays. Video - Do-it-yourself warm food

Do-it-yourself water heater

The water of the heat of the underlay is crushed by one's own hands under the tile or laminate, which is a miraculous alternative to traditional convector insulation. In this direction, heat flows from the bottom of the hill, creating a more comfortable middle ground itself in the expanse of the bіla pіdlogi. Material finishing coat when installing water heat pipes with rare heat transfer, the principle does not have a special meaning, but such a design is especially popular in rooms with kahelnym pokrittami - bathrooms and toilet rooms. Let's take a look at the algorithm of such robots.

Actual nuances

During the installation of heat transfers with rare heat transfer, pay special attention to the characteristics of the finishing coating. Remember that a smooth kachelna tile can be the least indicator of heat transfer. Tiles with a short surface are more absorbent of heat transferred by the heating system.

In addition, it is especially important to stick the tiles to the point of being glued, it is not guilty to be empty under it, shards of temperature deformation can lead to damage.

Connecting a collector for a sub-log

At the beginning of the stage, the construction of heat pipes with a rare heat transfer is the installation of a collector shaffi, so that a special outbuilding, in which hot water is poured for heating the pipes.

Collectors for water supply may have a few modifications, which are adjusted, for example, by the number of inputs and outputs. In order to understand what type you need, you need to carry out a warm water survey.

In the course of a new one, you will designate how many pipes, which diameter you need for organizing warm supplies.

Fahivtsі recommend up to one collector inlet no more than 60 meters of pipes with heat transfer. In this way, you can create in one place a kilka of contours of warm water supply, leather from any connections to the collector.

The average size of such an outbuilding (collector) is about 60 centimeters at the dove, 40 at the height and 12 at the depth.

Buy a collector's accessory and a box for a new one in a store of household materials.

Look in the wall niche for the collector, or open the space of the installation. To save pipes, the collector can be installed directly above the line.

It is necessary to install a shut-off valve on the skin tube.

The main types of warm water supplies

Depending on what kind of finishes you plan to speed up - heat supply with rare heat transfer can be three main types of extension:

  1. - Concrete - heat pipes are laid in the mass of cement-food screed.
  2. - flooring - the heat of the underlay is placed at specially molded insulating materials made of polymers or aluminum, and then the finishing coat is laid on the structure,
  3. -Derev'yana - a traditional log from a tree on logs, in the spaces between such laying pipes of heat transfer.

Installation of heat pipes with rare heat transfer with a screed

Foundation preparation

After the installation of the collector hood and the installation of the necessary number of pipes, you need to prepare the basis - the log. Vіn maє buti cleansings vіd smіtya and virіvnyany. It is not enough to reach the ideal horizontal surface, it is enough to smooth out the ridges and the overhead drops.

When molding the screed, which should be observed, in the case of a warm underlay, do not forget to lay a special damping line between it and the walls, which will prevent damage to the underlay during temperature deformation.

How do you choose to design a system for a great application with heat transfer circuits - to lay a line that dampens, and at the boundaries of the circuits.

With the coming crock, the installation of waterproofing. Vaughn can be vikonana both from a thick polymeric slab, and a special design.

Thermal insulation pidlogs - the basis of nuclear work

In order for your heat supply with rare heat transfer not to heat up either the courts or the street, you need to provide some kind of warm room. Only in case of a well-insulated field, it is warm in the water, under the foothills uphill to the zone of life.

The material for thermal insulation is called back polymers, such as polystyrene or polystyrene.

Reinforcement pidlogs

In order for the entire structure of the warm water supply to be small, it is necessary to put a reinforcing mesh on the heat insulation ball.

In this illustration, you see the reinforcement, as it is laid without a middle on the ball of waterproofing.

Laying pipes for water heat with a screed

Laying pipes for warm water pipes can be done in two main ways: “snake” and “raw”. The skin is able to keep its own heat, but in cold climates it is recommended to lay the pipes of heat transfer in a “raw” way, shards in this way are supported by an even distribution of heat over all surface layers.

Small pipe laying can be combined, it is especially important in applications with a folding configuration.

Video - laying of pipes for water heating

Do-it-yourself algorithm for laying water and heat pads

Water heating pad on a polystyrene basis

Another option for the construction of water-heated pipes with a rare heat transfer is the installation of pipes at a special plate with grooves, made from a backed polymer. Before the speech, we already wrote in this article about what is necessary.

To compensate for temperature expansions in such slabs, plates are laid that are deformed. Її it is recommended to vikoristovuvaty at light budovs for interchanges for interchange.

As if in a slip with a warm underlayment screed on the main overlap, the first step is to install thermal insulation.

After that, the plates are laid on the heat insulation. Laying is carried out from the hut of the place. Plates from polystyrene can be made with special grooves, heat pipes are laid in them.

After laying the piping system, connect the heating circuits to the collector and test the system, and then you can proceed to laying black underlays, for example, chipboard or GVL, and then finishing coating, for example, cache tiles.

You look like this principle diagram warm water pads on polystyrene boards

1. Finish pidloge pokrittya,
2. Ball of thermal insulation
3. Pipeline from heat transfer
4. Compensation plates for aluminum
5. Plates from polystyrene with grooves for pipes
6. Perekrittya

Wooden heat source with rare heat transfer

In that case, as you have a overlap with a tree, it is enough to suffocate another design of warm underlays.

There are two main types of warm wooden underlays: rack and modular.

When laying modular underlays, vicorous elements are prepared, which are made from wood chipboard, in which the grooves for the installation of heating pipes are already crushed in a factory way.

1. The first step in the construction of such sublogs is laying the heat-insulating ball on the back of the polymer.

2. Then wooden logs are being installed.

3. Zgіdno with the outlined scheme, the figured construction with aluminum is laid, as it will be a bed for heat transfer and at once the heat flow will be taken care of.

4. In the gaps between the lags and pipes, additional thermal insulation is laid.

5. A water pick-up ball is placed on top of the construction. As її it is possible to vicorate the backs of polyethylene or the finest cardboard.

6. On top of the structure of wooden logs, aluminum profiles and pipes of heat transfer, a black lining is laid, for example, from chipboard boards or from a gypsum-fiber sheet. Don't forget to fill gaps between the slabs for thermal expansion. A similar gap must be filled between plates and walls.

7. The finishing coat is mounted on the black lining - kahelna tile.

In order to get to know in more detail pokrokov algorithm installation of water heaters for tiles with your own hands - we invite you to look at the video instructions:

Video - installation of water heating sub-logs

The heating system will become an excellent addition to the main Opal system. Also, the heat of the sublog can calmly overcome the functions of the main heating without the need to stop the additional outbuildings.

Vlasniki often violate the installation of warm weather by powerful forces. І yakscho for connecting the electrical system, it is necessary to have a mother electrical robots, then independent obshtuvannya of water, heat, under the strength of the skin. Read the instructions and proceed to work.

Persh krok

Dismantle the old screed to the very foundation. Control that the surface drops do not overshoot 1 div.

Another Croc

Lay a ball of waterproofing material on a thoroughly cleaned surface.

Third Croc

Close the damper line around the perimeter. Since your system is composed of decal contours, the line must also be laid along the line between these contours.

Quarter Croc

Warm up the base. The heat-insulating material, like the order of insulation, is selected individually according to the specific situation.

So, if the vicorist system is to be supplemented to the main heating, it will be sufficient to lay polyethylene foils.

In the greater situation, such as a heat-insulating material, the polystyrene foam or other suitable material is used.

Also for sale are heat insulation, rozrobleni specially for installation in a complex with pipes of heat supply. At їх structuresі vzhe є channels for laying pipes.

Fifth krok

Lay a reinforcing mesh over the heat insulation. We will accept the increase in the value of the screed, which you will blow.

When you pipe the system, you can attach it directly to the grid, including the need to install special clips and smuzhok. In this case, for fastening, you can use simple plastic ties.

You will need to select an individual rozrahunok and determine the optimal parameters for laying pipes for a skin-friendly application.

Rozrahunok is the simplest vikonati for additional specialized programs - to give you the opportunity to spare that hour of strength.

Virahuvati will need tightness for the skin contour, including for formulas, it is important to do it. Such rozrahunok vmagaє vrahuvannya multiparameters. At the same time, a pardon can lead to supernaturally unfriendly naslіdkіv.

In order to vikonate the system, you need to know the following parameters:



Refurbished parameters allow you to re-route the optimal length of pipes that are being laid, as well as a suitable fit for their placement to ensure the necessary level of heat supply.

Also, you are responsible for the correct route for laying pipes. Remember: when passing through pipes, water gradually absorbs heat. Tom rozpodіl elementіv sіdіv sіdіv sіd vykonuvatі z urakhuvannya low important nuances, and itself:

  • pipes are recommended to start laying in less warm (ovnishnіh) walls of accommodation;
  • if the pipe is not introduced into the room from the side of the outer wall, then part of the pipe from the point of introduction to the wall needs to be insulated;
  • with the method of incremental reduction in the intensity of heating from the outer walls of the fireplace to the inner walls, the option of laying the "snake" is installed;
  • with the method of ensuring equal heating of space in the rooms, so as not to wash the outer walls (wardrobes, bathtubs, etc.), follow the spiral installation method. With this, the spiral is guilty of developing along the edge of the place to the middle.

The most commonly used pipe for laying pipes for heating pipes is 300 mm. In areas with higher heat inputs, the pipe placement can be changed up to 150 mm.

Bazhano, schob opir pipes at the contours, connected to the scorched collector, but the same. For which it is necessary to divide especially large contours into sprats of smaller contours. To especially great ones, contours can be seen in some way, dozhina trumpets of some of them perevischuu 100 m-code.

Also fakhіvtsі do not recommend heating the kіlka kіmnat with one circuit. Mansard roofs, screened verandas, balconies and more. the rooms are guilty of being heated by the system circuit. Otherwise, the heating efficiency will significantly change.

Help for the installation of the system

Start installing the system. The robot is victorious at the sprat of stages.

First stage - collector

Installation of the collector is specially designed for this collector screen. Sound the thickness of the similar box is 120 mm. Choose the dimensions according to the dimensions of the collector roughness and the adjustments to the dimensions of the different types of sensors, the vise is thin.

Cover the collector group so that under it there is a gap sufficient for bending pipes.

Install the collector cabinet. It is so, that the indications of the length of the tubes from the skin opalescent site and the contour of the system were approximately the same.

Most collector hoods are simply mounted against the wall - a 120-millimeter torso allows for it. The collection box is responsible for the installation of more for the cost of the system to improve the sublogs.

It is important to remember: it is categorically not recommended to create different niches in load-bearing walls, but in more situations, it is strictly defended.

The folding of the collector shaffi is dependent on the instructions, so you don’t have any problems and difficulties at any stage.

Another stage - heating cauldron

First of all, wrap the cauldron of all kinds of tightness. Possession is guilty of normally enduring the anxiety that comes, and the mother's reserve of tightness. Rozrahunok is borderline simple: you will increase the tightness of all systems, and add a 15-hundred-thousand margin.

The circulation of heat in the system is provided by a pump. The design of the current boilers includes a water pump on the back to its warehouse. Sound of tightness is sufficient to ensure the normal functioning of the system in applications up to 120-150 m 2 in area.

If the dimensions of the application change the indicated values, you will have to install an additional pump. In such situations, pumps are installed at distant collector boxes.

It is necessary to install shut-off valves at the time of introduction and removal of heat from the boiler. For additional help, you can turn on the heating equipment if necessary, for example, for repair or preventive maintenance.

Most home masters give priority to electric heating boilers - the stench is the easiest to install and even better to show yourself when working in a complex with a heating system. In order to install that connection, you simply need to access the position of the picker's instructions.

Third stage - trumpet

Laying of pipes is carried out in line with the previously prepared scheme. For fixing elements, call vicorist profiles with openings for placing screws.

You can also attach pipes to the net for additional plastic screeds - it was already mentioned earlier.

When fixing the pipes, make sure that they are not pinched too tight - better, if the loop is free.

Vagini, make sure to work as carefully as possible, dotrimuyuchis with the recommendation of the minimum allowable radius. At the pipe with polyethylene pipes, the radius of the sound should be 5 pipe diameters.

If you squeeze the polyethylene pipe too hard, the wife of the white-haired woman will settle down on the її zginі. Tse note about the vindication of the broken. Vikoristovuvaty similar pipes are fenced - at the mist's break, a break will suddenly appear.

Connection of pipes of the system to the collector must be made from the installation of the fitting or the Euro-cone system.

After the completion of the installation of the system, the obov'yazkovo is turned over to the heat supply. To re-test, fill in water, apply a vice of about 5 bar and fill in the heat in such a station for extraction. If after 24 years there will be no annual commemorative expansion of that duct, you can proceed to screeding.

Fourth stage - screed

When pouring concrete screed up to the pipes, a robotic vice is to blame for the filings. After pouring, the screed needs to be left to dry for a month. Less than after a new set of screeds, you can proceed to the laying of the finishing coat.

When molding a concrete screed, it is necessary to protect a number of important features that are related to the nature of the distribution of thermal energy in the pouring and finishing coating that zastosovuєtsya.

If the tiles are to be laid, the thickness of the screed should be about 30-50 mm. Or you can change between pipes up to 100-150 mm. Otherwise, it is absolutely uneven to warmly spread.

At the time of laying linoleum, laminate panels, etc. the screed can be smaller but smaller. To improve the filling in a similar situation, it is necessary to vicorize an additional mesh, which is laid on top of the pipes.

Warmth

Away robots!

Video - Do-it-yourself warm food

The article will have to cover instruction installation of heat supply with water heat transfer and practical reasons professional specialists. We give the head respect we care about nuances correct installation of the system.

Instructions for the installation of heat pipes

Before the cob, it is necessary to work the rozrahunok of the opal system, depending on the length and diameter of the pipes, control elements and control, a list of shut-off water fittings. In addition, choose one of the many possible types of insulation and waterproofing. Under the hour for the choice of materials and the analysis of technical indications in the system of water scorching, the logs are taken to respect the material of the state cross-reference.

The thickness of the heat insulation for polystyrene foam or expanded polystyrene is approximately 100 mm, for warm regions or other surfaces, the parameter can be changed by 30-50%.

We can look at the option of installing heat pipes on concrete ceilings on the first version, for waterproofing vicorist cheap polyethylene foam ≈ 30–40 microns, top screed with dry concrete, finish coating - ceramic tiles. Pipes for the system are bought plastic, for strengthening the upper screed and fixing the pipes, a metal mesh is used.

Krok 1. Foundation preparation. Head respect should be given to nervousness. If pіnopolіstyrol may be bad indicators of physical fitness, trivalі vantazhennya in okremih mіstsya cause yogo deformation. Obviously, the piping system is deformed, the upper screed “sags”, there are additives and inappropriate sussilla on evils. In the least accepted situations, the appearances can reach critical values ​​and negatively insinuate on the finish line of coverage. As a reminder - robiti folding repair.

There is one more nuance, for some reason, respect for the hour of preparation of the foundation. Go about the place of fixing the damper stitch to the wall. In order to avoid the appearance of non-necessary sour “guts” at the place of admixture of the line, the wall needs to be leveled. You can beat the spatula, but if you have enough time for everyday work, then you can see it with a trowel, you should see it richly swidshe.

Krok 2. Laying waterproofing and insulation. Radiantly corystuvatisya with cheap polyethylene plіvkoy, the material miraculously wins its own factory, if necessary, stretches, which minimizes the risk of the appearance of rozrivіv.

Waterproofing

As we already guessed, the community would be insulated to lie on top of that climatic zone of residence. If you need to build a heat-insulating ball thick for 5 cm, then it is recommended not to buy one thick plate, but two thin ones.

Tovstі slabs can be beaten to insulate the walls, in such a position they do not have a spark of ingenuity. The laws of physics seem that two thin slabs can make a larger supply of virgin before the appearance of cracks, less than one tovst. Toil on the uvazi, that the collective community is the same in both ways. Such features allow insulation to compensate for possible flaws in the preparation of the foundation. It is necessary to put an insulator with such a rozrachunk, so that the sticks are overwritten.

As if the slab was not far away exactly cut, and in the sticks there appeared commemorative cracks, it was necessary to lay them with a mounting pin. A lot of bud_velnikov to please fix the damper line over the insulation without intermediary cement screed, such an option may have the right to be. We don’t have a solution, but it’s more efficient and more efficient to fix it to insulation, it will help to ideally lay a slot along the perimeter of the premises without any installation pin.

Practical pleasure. Do not obov'yazkovo checks, until the pin is completely dry and trim the excess. As soon as they stumbled the first row of insulation, once they put it on another one. Fresh pinna є vіdminnim glue for all styrofoam materials, it’s superbly connected between two balls of insulation, for the ruffle of which the lower ball’s ball moves.

Krok 3 Installation of a heating pad, what do you want. Buy the one that can be marked with 5 mm squares to help you accurately control the process of laying pipelines in the system. Most of the "pleasers" are told that it is necessary to hermetically seal the slab with adhesive tape around the perimeter, as a great saving of heat in the future. All this is not true, such a method of sealing steam with waterproofing does not save any heat. If you have correctly laid the heat-insulating plates, then you will not need an hour to glue the tiles. The hired brigades are engaged in such a right only for one reason: it’s even easier to work, and the deputy for them to pay a hell of a penny. Glue the seams less in that slip, as on a concrete base there is no hydroprotection from polyethylene slick.

Although, as the practice of accidents from a thermal environment shows, whether a hydrologist can have a zero effect in these situations. Water moves its own riven doty, the docks do not know the gap for the passage. And know it's out її obov'yazkovo, be singing. If you have built an ideal bagatosharov waterproofing and you won’t go down, then you will appear in the mountains. What difference can you make to repair, - the lower stele on top of the upper one? The earlier the leak appears, the less damage to all constructions. If the water is wet for a long time, then a fungus will appear on them, and so on.

Krok 4 Laying pipes of the opaluval system. It is recommended to paint a sprat of scheme options before laying. Tse takes away a little more than an hour and allows you to unikati prykh pardons. In addition, the time of folding the schemes is the possibility of optimizing the contouring of contours with the improvement of current geometry.

Practical porada. If the correct recommendations are not to lay pipes under the furniture installation sites, they will overheat and quickly waste your privacy. Mi for the sake of diyati is well thought out. Who can give a guarantee that in these places the furniture will stand for a whole hour, that you will not want to re-arrange or re-plan the premises?

The length of the skin contour is due to repair the pressure of the water pump, the data are specified in the instructions for use, it is important to check it before installation on the cob.

In another situation, the situation is possible, if the temperature of the logs in different areas of the accommodation is significantly cooled, and it becomes important to achieve a comfortable value for heating the room.

Trumpets can be creaked in two ways:



Kinda important. In addition, as you install the piping system, ensure the safety and longevity of the heating system operation.

Do not buy non-standard fittings and lock fittings made of German alloys. On the right, in the fact that the stench of the year under the influx of appearances in the material gives cracks. As a rule, the holes are fixed in the places of the fitting of the nut and fitting. Visually, the crack is not visible, it seems that the reason is in the filthy tightened gasket. Try to tighten the nut and it will end up summarily - the threaded part of the fitting will break off and become stuck in the nut. It’s more difficult to winnow, it’s more common to change a couple. The ideal variant of the material for the preparation of fittings is stainless steel, bronze. Reshtu of color alloys is not varto. You do not need to worry about fittings, their importance in the heating system is important to reevaluate.

One more aspect. Vikoristovyte for sealing z'єdnan less gum gaskets, do not varto zastosovuvat paronit, it is necessary to tighten it strongly, not all fittings will vibrate so much. I stay. Elements that are practiced by a couple can be made from one metal. It is necessary in order to turn off the critical voltage through the difference in thermal expansion.

Krok 5. Checking the tightness of the seal. Robiti is categorically protected without re-verification finishing screed, it is necessary to start a memory. How to change the system?

  1. Vіd'єdnati inhіd and out of the contour. Turn off the exit, put a tee on the entrance. Connect an accurate pressure gauge and valve to the new one.
  2. Push the compressor up to the valve, turn the pressure in the circuit no lower than 2 atm. More precisely, the value of the trace depends on the improvement of the working pressure of heat transfer. For an hour, try the vise again, you are guilty of revisiting yoga by about two or three times. After that, as it has been pumped into the pipeline again, close the valve and leave it in this position for about the twelfth year.
  3. After the end of the hour, check the indications of the pressure gauge. If it’s a fall to the vice, it’s necessary to know about the leak, it’s necessary to know the problem area and find the reason.
  4. Nap_dry screed and heat p_dloga

    Wet concrete can leak, long time to achieve great vag. All three factors for the heating system can cause negative consequences.

    A screed is better than work from dry sumish. For її preparation, zvichnі proportions of sand and cement (one to three) are taken and resolutely mixed. Robiti tse can be done by hand or betonozmіshuvachem. And the axis should add water carefully in small portions. It's easy to change the readiness of the story: to squeeze yoga into a fist. Yakshto sumish tremaetsya at once and at the same time water doesn’t come out of your fingers - everything is good, you can practice with it. We gave everything according to the given algorithm - the installation of beacons and robots with a coupler.

    Є kіlka nuanceіv pіd hour robіt іz screed behind the contour of the water supply.

    1. First. Blame problems from the installation of beacons. Modern metal laths are not suitable, it is necessary to speed up with the old technology. Beacons robiti іz sumishі, nasipati iz neї posdovzhnі іnії on vіdstanі vіdstanі less, nizhі dovzhina prasuvannya. For help, catch horizontality. In order to speed up the hour of collecting beacons, they can sip dry cement. As a rule, it is necessary to put even metal or wooden planks on beacons. The stench is not allowed to damage the position of the upper surface of the beacons during the overworld onslaught of the rule.
    2. Other. Under the hour of vikonanny robit try not to step on the place of installation and fixation of pipes, the stench can be roiled or more likely to droop. It is necessary to keep quiet vipadkіv, if the pipes are fixed with brackets without a middle to the heat-insulating plates.

    A dry screed may be sufficient for the installation of all types of final cladding, including important natural stone. In addition, this method gives the possibility of significantly speeding up the waste of materials and changing the hour of work. You can proceed to further work with the status already after 12 years. For wet concrete, the hour is more significant.

    Practical pleasure. The temperature sensor is installed between the coils of pipes. In order to be able to replace yoga at times, mount the sensor at corrugated pipes. Silence one end of the trumpet.

    On tsoma wake-up work finished, you can connect the scorched to the regulation system and control.

    Video - Installing warm pads at a double-topped booth

The screed can be caught with a maximum draw of 28 dB until the concrete has gained its brand value. During this period, it is not possible to turn on the heating system. You can turn on the scorching only after the screed is still stuck, and not to the maximum tightness, but step by step to increase the temperature by pulling three-chotiroh deb.

For screed vikoristovuyut special bag for heat pidlogs or pskobeton brand M300.

In the yakost tax cover on top of warm underlays, it is more likely to vikoristovuvat those materials, as it is the best way to conduct heat, and tse abo linoleum. As in the plans for the improvement of the sub-logs of the wart, and respect for those options, it is possible to win in the system of heat sub-logs: about it, indicate on the packaging.

Polystyrene technology of laying heat pads

Perevaga This method is based on the fact that it is a daily process that is typical for a concrete screed. At this point, it is important to save an hour for laying warm underlays, and at that height, it is practically not possible to steal the air of the screed. Polystyrene slabs here play the role of a superficial heat-insulating material, and such a method is indispensable, if the concrete screed does not overlap, or the steel is so low, and ti 10-15 cm, that it is possible to really change the position.

Polystyrene plates are laid on the prepared and vir_vnyanu surface, and aluminum plates are laid on them. The stench can make special grooves for laying pipes, so the plates are guilty of bending close to 80% of the logs: the winds are warmly spread evenly. Burnt pipes are laid at the buried slabs. On top of them, lay sheets of gypsum-fiber boards: one sheet is sufficient, as if the finish is covered with vicory or linoleum, and if parquet is vicorated, or a ceramic tile is better, then two sheets are more likely to be vicorated.

Polystyrene technology is based on concrete or wood base. Do not go out only in that fall, as if there are no concrete crosses in the booth.

Wooden technology of laying heat

This method is indispensable, deconcrete overlapping is called daily. Fallow in view of certain nuances, two options are seen: modular and reik.

Modular technology

This technology transfers the installation of a thermal insulation ball, over which to lay wood fiber boards. The stench is far behind the grooves for the installation of aluminum plates and pipes at the future. We will then install aluminum plates and fasten the pipes in them with special clamps. The aluminum plates here are just like that, as if in a forward slope, to saturate the equal distribution of heat.

Gypsum fiber sheets are laid on top of the laid system of pipes, and then you can lay the finish coat.

Reik technology

Here, there is a larger thin ball of heat insulation, lower in the front way, so the mass of all warm weather systems comes out smaller, which allows you to win a similar system on a different version of a wooden booth.

How to insulate vicorist mineral wool or polystyrene foam, how to lay between overlapping beams. Laths with a width of 2.8 cm are laid on top of the insulation, and between them - 2 cm. Already prepared, the lath base is laid with aluminum plates with visible pits, and pipes are laid in them.

Naprikintsі - laying of gypsum-fiber sheets and finishing of decoration.

Collector group installation

The collector was mounted on the wall even after the fact that it was laid in front of it, so that the laying of the pipes could be done very simply and quickly, and turn over the entire system. Mi tsey stage is looked at perfectly. Varto indicate that the surface of the wall for optimal operation can be perfectly horizontal, and for re-verification it is necessary to twist the laser line.

If the technology for the installation of a warm water supply was not taken, all the same one needs to install a collector. It is easy to know yoga in the shops, moreover, independent robots it is better to choose a ready-made collector with a shield: it is important to know the number of visnovkiv, but it’s better to lay down the number of contours. After installation, it is necessary to connect the pipe before the new one, which is supplied to the return pipe: first, go out of the boiler and carry hot water into the system, so that part of your heat is supplied to the log cover, and already cool down turn through the return pipe, re-feed into the boiler, deheat, cycle repeat. A pump for pumping up and driving water may be needed in that case, as there is no wine at the boiler.

The collector screen is installed at the same room, the heating system is being dismantled, and moreover, spacers are placed closer to the center of the room and lower, more plumbing. Mount the collector closet against the wall or put it right up to it, lay everything down depending on what kind of water you have: open or closed.

On the pipe, which is supplied to the valve, fasten the locking valves, which allow you to turn off the water, if the scorching is not necessary, or if it is carried out repair robots. Schob zadnati and shut-off valve vicorist compressor fitting. Now it is necessary to connect the collector to the valve, and from one side, install an air vent, and from the other side - an evil faucet. For precise regulation of the water temperature in a warm field, in the collector closet, there are special valves or vents.

At the end

The remaining step in the installation of a system of warm water underlays is the glazing of the finish coating and the malting with a wicker robot. Properly lined with heat, it gives the opportunity to do without repair for a long time, and the charge is comfortable to stay in the accommodation and to walk barefoot on the slope.

Do-it-yourself installation of heat pads

It is important for the maister to know that it is not possible to create warmth with your own hands, but there are a few methods available. And the principles of work and heat supply are even simpler. In cold weather, it gets hotter and hotter at the upper part of the accommodation, and the feet get cold at the same time. The electric heat of the pidlog, heating up, creating a counterforce, which makes the pillow warmer below, yak, rising, venting warmth on all equals. The convection current, directing its own uphill, calls out to the natural displacement of the soiled masses, for which the temperature of the whole place is vibrated. Tse priyaє smaller vitrates for heating for other equal minds.

Electric heat supply is mainly represented by two varieties:
- warm warm infra-red;
- warm soft cable.

Similar to the order of the heat of the water supply, pipes are laid with their own hands, and they rise to the collector. Heat carrier - water central system scorched.

Heating for the process of thermal conductivity of the sublog begins to change in the infrared spectrum, creating heating for the measurement of radiation of the electromagnetic vibration. The warmth of the infrachervona subplot took away its name from the very beginning of its peculiarity, although strictly seeming, all the heat underlays change in the thermal range.

Substation heat systems can be both the main and additional heat sources in the premises. In the first season, it is necessary to transfer the reserve zherel of life, otherwise the first accident in the power supply will freeze the accommodation during the winter hour.

Posladnannya pіdlyagayut be-yakі statevі pokrittya for a wine of cork and parquet. Installation is carried out on top of the insulation under the screed. Up to a short period of time, low repairability is possible. To replace the one who wiishov out of tune heating element happen to know the pidloge cover and ruin the screed.

Vyrobniki vrakhovuyut tsyu foldability of reconstruction and vikonuyut elements of the scorching system with the most reliable and durable.

Use your own hands to build up the warmth of the skin under the strength of the skin, but rather respectfully watch the accompanying videos and instructions for the installation of products that you bathe. Allow me to spare you in the service of the buddies, but for the sake of great viability and good theoretical training. Read and zastosovyte in practice.

Do-it-yourself electric heat supply


Do-it-yourself electric heat

If there is a need for do-it-yourself heating padding, more and more popularity will be won by heating cable systems. There is nothing marvelous that the stench has gone to the point of heating up the logs. A system of heating cables and a regulator enter the warehouse. Cables are either resistive or self-regulating. In both vents, the maximum amount of heat can be seen, but resistive cables are heated throughout the house, and the options that are self-regulating, heat up the most important cooling of the house for their house. Tse became possible for the rahunok of victoria matrices from the conductor polymers. The matrix separates two current-carrying darts, and the vision of heat enters into the volumetric structure. Conductors are recognized for the life of the matrix electric jet. The additional regulation system can be changed from primitive thermal relays to high-intellectual electronic blocks with power microcontrollers, thus clearly adjusting the microclimate at a given level. To control and monitor the medium, temperature sensors are used, which are supplemented with moisture sensors.

Before that, as if to create warmth with your own hands, the scorching area of ​​the floods is reduced and the resultant tension from the upcoming mirkuvan is overcome:
- bath room, toilet - 180 W/sq.m;
- balcony, loggia - 200 W/sq.m;
- internal applications - no more than 150 watts / sq.m.

The leather cable is characterized by tightness, which can be seen, the cauldron of the purchased cable is no less necessary for heating the room, which is seen from the tightness, which can be seen. The cable is laid in a zigzag with a hard fixing crochet, no tangling is allowed, and the resistive cable, in addition, is obliged to turn to the stalk point for installation.

In order to take away the warmth of the underlay, with your own hands it is necessary to carefully lay the assembly line over the virivnyanoy surface, frontally insulated, with the fixation of the selected crochet. As soon as the front laying is completed, the system is being rechecked in accordance with the operating instructions. If the system works correctly, heating is connected to the living room, and the cable is filled with a thin ball of screed. Oblitsyuvannya pіdlogi is carried out in a vіdpovіdno up to the architectural project.

The heat of the underlay of infrared heating is based on the type of electric and is primed on the heating pad, which is heated - heating foil, the method of removing the heat is the same as that of resistive cable heating. At the first stage, sketches are drawn from the clear placement of the system material on the surface of the logs. A screed is applied, which is visible, as it is thoroughly cleaned. We are looking for places to cut through the strobes of the sensors, the installation of the sensors is being carried out, the unevenness is expected to be a buoyant sum. Insulation is provided, smugs of foil are laid on top without overlapping and overlapping, parallel electric heating of smugs is carried out. The contacts of the wires to live, are squeezed, hoaring foil, and are insulated with a pliable electrical insulation. The cutting of the foil is carried out at the places installed by the virobnik, or at the air of the heating smug. Mіsce zrіzu obov'yazkovo slіd іzoljuvati y sіy width. Being warmly supported by your own hands, the smogs followed the plan ahead of us.

The system is to be tested in a working mode, as if everything is safe, then waterproofing and vapor barrier with polyethylene are carried out. To ensure the electrical safety of the system operation. All seams are sealed. Laying is carried out on top.

Video how to make heat supply, electric, with your own hands


In order to create heat under the water with your own hands, you put in place old-fashioned and flexible polymer pipes. Water is taken from the system central scorching, transmitted to the heating system by the collector

Installation is carried out on top of the slab insulation on the lattice reinforcement with a middle side of 200-300 mm without a bend of flexible pipelines between them with a thin metal rod fixed over the cross-section of the reinforced mesh.
Laying is carried out through the central post, laying the pipe with a spiral spiral of 100-150 mm. Having protested the system, you can install beacons and vikonati screed cement coating not tovschі for 80 mm. It is even more important to check the complete hanging of the screed without raising the heating system.

There are two alternatives for fastening to the reinforcing mesh:
- special stapler;
- Profiling trims.

Do-it-yourself warm water water, video

Join the discussion
Read also
Like the signs of the zodiac fit one to one at the kohanna - a horoscope of wisdom
Yak formed a share of the show's wives
We didn’t check the wedding: how to live the finalists of all seasons of “The Bachelor Maxim Chernyaev and Maria Drigola”