Subscribe and read
naytsіkavishі
statti first!

Introduction to the living room of the electrician

It was formed by those that energy organizations (companies), who supply electricity to the people, for the distribution of electricity and electricity, they will build power transmission lines (PL). There are three ways to connect to the submarine - the circuit is connected with the SIP wire, the cable is laid near the ground, and the cable is laid behind the auxiliary cable. In this article, we would like to describe the method of connection to the redundant lines power lines for additional self-supporting insulated wire (SIP).

Articles of the cycle

  1. Electrical installation introduced into wooden booths with VVGNG cable near the ground. Proceedings

In order to remove the permission to connect to the electric lines, it is necessary to remove the technical mind (translation technical entries), yakі nebhіdno vikonati. On the basis of the technical minds of the project, the organization develops the project of electricity supply for your life for a distant vikonannya. In the fallow type, according to the type of weather and climatic minds, the project of electricity supply is the most optimal and safe installation for SIPu without the installation of additional supports (stovpiv).

From the support of the submarine (or installed on your space of the support) to the wall of the SIP booth, it is mounted for the help of special anchors at a height of not less than 2.75 m from the ground. From the point of reinforcement to the wall to the point of passage through the wall of the SIP, it is due to laying at corrugated PVC pipes, boxes or in other fire-fighting structures. Passing through the wall is guilty of hanging at the metal pipe of the wall (sleeve). For protection against mechanical problems (after rubbing or rubbing the cable) a plastic insert is installed at the sleeve, after which the sleeve is sealed with an anti-burning warehouse.


After wiring the inlet door through a metal sleeve in the middle of the booth, CIP is laid up to the head rose shield(Shield of appearance). The method of laying may be different, so that it is necessary to open the wiring or the electrical wiring is attached - the main mental choice of the method of laying is to help electrical safety fire safety.


The electrical installation of the external wiring is to be blamed, but the wiring is at the box, in the electrical plinth or plastic pipes, yakі do not support the mountain. This way is both costly and laborious. If you want to make it easier and cheaper to install wired electrical wiring, then you need corrugated pipe PVC from the sides on the surface is ignited by a structure with a strong ball of fire-fighting material (plaster, alabaster, cement rozchin, concrete thinly) with a thickness of not less than 10 mm. Dali, the live connection is connected to the first automatic vimikach in the shield appearance, in the same way the lichnik is installed.

Deyakі energetiї kompanії zobov'yazyuyut koristuvachіv install a shield on the facade of the booth, motivating the accessibility of the sign of the lichnik, but you may have the right to install yoga in the booth. If you don’t want to overthrow the technical solutions that have been suggested to you, then you should install a hermetic anti-vandal shield on the facade of the booth. In this case, the SIP wire should be connected to the shield and plugged into the device, and from the switchboard to the main switchboard, it is necessary to install the electrical installation with a cable from the middle conductors of the VVGng type. The passage of the cable through the wooden walls is guilty of zdijsnyuvatisya just like a SIP wire.

Articles of the cycle"The whole truth about electrical installation robots at a wooden booth":

  1. Electrical installation of the introduction into a wooden booth with a VVGNG cable near the ground
  2. Electrical installation introduced into wooden booths with VVGNG cable near the ground. Proceedings
  3. Electrical installation of internal external electrical wiring near a wooden booth
  4. Electrical installation of internal attached electrical wiring near a wooden booth. Proceedings
  5. Yak Vikonaty put a PEN-conductor in electrical installations (PRU, MSB). cob
  6. Yak Vikonaty put a PEN-conductor in electrical installations (PRU, MSB). Proceedings

Read also:


  • Underground cable laying as an introduction to wooden booth in the most effective way, which allows you to significantly increase the safety of the term of exploitation, with a single shortfall, which requires the removal of permitted documents.


  • Today, one of the most popular connections to power lines is underground cable installation, which is a great success practically in all corners of the world. Tse pov'yazano z tim, scho asking ...


  • The cob of the article "Electrical installation of the introduction into the wooden booths with the VVGNG cable near the ground". If all the necessary materials are prepared, you can proceed to earth robots. Vrahovyuchi those that the clay slammed on the cable can not be less ...


  • Connection of a wooden house house to the electricity supply line through the introduction of the sound is divided into three parts: choose a corridor with a minimum number of unsafe crossings, connection to a repeated power line and electrical cable installation.


  • Maxim At the wooden booth, the darts, which enter the main switchboard, will be laid along the wall in a box, which adjoins the back to the other box, in which the cable is laid to enter the winding line. Chi admissible such wiring? ...

23 Comment(s) on “The whole truth about electrical work at a wooden booth is clear to PUE and PTEEP. Electrical installation of the introduction into the wooden booth with a CIP dart”

    “Passing through the wall is guilty of hanging at the metal pipe of the wall (sleeve). For protection against mechanical problems (after rubbing either the virgin cable), a plastic insert is installed at the sleeve, after which the sleeve is laid by an anti-burning warehouse.
    Chi can you send to the NTD or just for confirmation?

    • Hello Oleksandra!
      We publish a message to you.

      PUE-6
      2.1.36
      The laying of wires and cables, pipes and boxes with wires and cables for the minds of the fire safety may be satisfied with the help of Table. 2.1.3.

      2.1.37
      When laying the protection of wires (cables) with sheaths of materials that are ignited, and unprotected wires at the light in the wire (cable) to the surface of the bases, structures, parts from burning materials, the fault should be no less than 10 mm. In case of impossibility of safety, a wire (cable) should be installed along the surface with a ball of fire-fighting material, which protrudes from the skin side of the wire (cable) not less than 10 mm lower.

      2.1.38
      When laying wires (cables) with sheaths of materials that burn, and unprotected wires at closed niches, at empty building structures (for example, between walls and lining), at bores. Since the constructions that are burning, it is necessary to protect the darts and cables with a heavy ball of fire-fighting material from the sides.

      2.1.39
      When laying pipes and boxes of fire-retardant materials on fire-retardant and fire-retardant bases and constructions, stand at the light in the pipe (box) to the surface structures, parts from materials that burn, it is to blame for becoming no less than 100 mm. In case of impossibility of safety, a pipe (box) was appointed, followed by water-creaming from the sides of the mouth and on top of the surface with a large ball of fire-fighting material (plaster, alabaster, cement rozchin, concrete thinly) of not less than 10 mm.

      2.1.40
      When attaching pipe laying and boxes of important materials in closed niches, in empty building constructions (for example, between walls and facings), in bores it is thin. pipes and boxes should be filled with air from the sides of the sides to the surface of structures, parts from materials that are ignited, with a strong ball of fire-fighting material with a thickness of not less than 10 mm.

      2.1.41
      In case of stretches on short lengths of electrical wiring with elements of budding constructions and materials that burn up, the length of the length of the yard is due to buti vykonanі s dotrimannym 2.1.36-2.1.40.

      2.1.58
      In places, the passage of wires and cables through the walls, between the tops of the overlap, or the exit of their names, it is necessary to ensure the possibility of changing the electrical wiring. For whom the passage may be chiming at the trumpet, box, open thinly. In order to prevent penetration and tightness, drive and expand later in the months to pass through the walls, block or name the exit next to lay the gaps between the wires, cables and pipe (box, opening toshcho), as well as backup pipes (boxes, open toshcho) .p.) easily seen by the mass of the fireproof material. The laying is obliged to allow replacement, additional laying of new wires and cables, and to ensure that between the fire resistance of the opening is not less than that of the fire resistance of the wall (overlapping).

      2.1.63
      Trumpets, boxes, and gnuchka metal sleeves of electrical wiring are to be laid in such a way that they cannot accumulate water, including vapor condensation, which can be found in the air.

      2.1.64
      In dry, non-serrated applications, in some daily vapors and gases, which negatively affect the insulation and sheathing of wires and cables, pipes, boxes and flexible metal sleeves without reinforcement are allowed.
      Z'ednannya pipes, boxes and flexible metal sleeves between themselves, as well as from boxes, cases of electrical control. maє buti viconano:
      in applications, where to place a bet or gas, which negatively injects into insulation or sheathing of wires and cables, in outdoor installations and in municipalities, de
      it is possible to get into the pipes, box those sleeves of oil, drive or emulsion, - from the indentations; boxes in these folds are made of buty with strong walls and with strong narrowed lids or deaf, different boxes - with narrowed roses in the places, and gnuchki metal sleeves - airtight;
      in case of powdered applications - for strengthening the seals of pipes, sleeves and
      boxes for zahistu vіd saw.

      2.1.66
      Attachment of electrical wiring in pipes, boxes and flexible metal sleeves is due to buti vykonanі z dotrimannym vymog, guiding at 2.1.63-2.1.65, moreover, in all cases - with narrowing. Boxes of attached electrical wiring may be deaf.

      2.3.15
      The cable lines are to be wired in such a way that the process of installation and operation included the inclusion of unsafe mechanical stresses in them and the need, for which:
      cables must be laid with a margin of safety sufficient to compensate for possible subsidence of the ground and temperature deformations of the cables themselves and the structures, laid behind such stinks; lay a reserve for the cable as a wall (vitkiv) is fenced;
      cables, laid horizontally along structures, walls, overlappings, etc., riggedly fastened at the end points, without the middle of the end layings, from both sides of the vines and at the right and locking couplings;
      cables, laid vertically along structures and walls, are fixed so that they prevent deformation of the shells and do not break the cores of the cables;
      structures, on which non-armored cables are laid, due to buti vikonan in such a way that the possibility of mechanical damage to the sheaths of cables was turned off; at the places of hard reinforcement, the shells of these cables are to be protected from mechanical damage and corrosion for the help of elastic gaskets;
      cables (including armored), roztashovanі in mіstsyah, de zhivі vіdnіchnіchnі chіnіchnі poshkodzhennya (transferring vehicular transport, mekhanіzmіv v vantazhіv, availability to third-party osіb), due to buti protection for the height of 2 m, v land;
      when laying cables, order with other cables that are in operation, you must come in to protect the rest of the people;
      the cables are to be laid on the hot surfaces, which prevent the heating of the cables more than is permissible, in which case the cables are to be transferred to the break of the hot ducts near the places of installation of the ducts and flanged connections.

      PUE-7
      7.1.38
      Electric fences, which are laid behind impenetrable suspended steles and in partitions, look like attaching electrical wiring that їх slid vykonuvati; behind the steles, in the voids of partitions made of combustible materials near metal pipes, which lead to localization buildings, and near closed boxes; behind the steles, near the partitions made of non-combustible materials * - at the walls of the non-combustible materials, in pipes and boxes, as well as cables, so that the fire does not rise. Whenever possible, the possibility of replacing darts and cables is ensured.
      ________________
      * Under suspended steles made of non-combustible materials, such steles, like vikonans made of non-combustible materials, moreover, are built over suspended steles, including inter-surface overlaps, as well as vikonans made of non-combustible materials.

      SP 31-110-2003
      14.24
      The place for the passage of wires at the back of the sheathing and cables through the walls, partitions, inter-overhead overlaps of the faulty mother is narrowed to the requirements of GOST R 50571.15 and 2.1 PUE. To ensure the possibility of changing the electrical wiring, the cables and wires at the zahisnіy obolontsі may be buti vykonaniya at pipes and boxes; the fire of the passage is to blame, but not less than the fire of the budding construction, in the yakіy vin vykonany. Gap between wires, cables and a pipe or a box next to lay an easily visible mass from a non-combustible material. It is allowed to lay cables and run them at the back of the fence through the building constructions at the specially designed openings.

    for the joint venture, it’s true that there are about rozpodіlnі merezhi, about tenacious among foreigners, ours didn’t write off, even if we don’t protect cables (or CIP) about yakі go, zagalnі rules for them do not fit. If you want, in principle, you can attract, but here is the box! All the same, marveling at the shield, the trochs are no longer vtrimavsya in respect of respect (service for service). Think about it, you have a seal at the box, a locker 231AT, let’s say an engineer has sealed everything, and you close the panel. Everything is garno! … Just at first glance, when the controller is turned over, the whole shield is ruffled, then we install it on the plate, twist the tools, and spend an hour - the shields often warp, the cable of life in the metal hose is attached behind the shield, it is also necessary to change it - it is not effective, then a normal engineer will be zmusheniy zmusit you cut the shield and close and seal the ALL upper part (de lіchilіnі vstupny avtomat-u boksі-obov'yazkovo) - the beauty will perish, then the re-verification will be carried out easier. And how about adding ZM-630 here! I’ll tell you straight in us, the ASU with similar elements is construed differently (it worked like that for 2 years, not 2.5 years), as I would like to hear your thought: 1 ASU is divided into SHCHU and RU, 3/1-1 (ІEK, EKF) 2. The lifeline cable (СІП) enters through the wall NON-FRONTLY into the SHCHU.3 RU out and African RU, as a rule, in the cottages they began to work RU-1 (budinok) і RU-2 (gospbudovi).

    • Hello Oleksandra!
      “A normal engineer, when sealing, if there are disturbances, he will cut the shield and close and seal the upper part of the VRYU”

      1. The power supply inspector, a practical commercial organization, cannot renew the efforts to save the electric power and rework the power plant, as it was prepared according to the PUE that the electricity supply was good for the project. Vіn is guilty of sealing the lichnik of electricity and drinking water. Energy supply organization - ce commercial organization, the main task is to remove the maximum income from generated or purchased electricity.

      2. Control functions (re-examination of the project - ce control) are consigned to the support of state organizations. Energy-supplier organizations can carry out stinks, as transferred by the contract between organizations, and claims of energy-supplier organizations on the other side can be presented only for the obvious provisions of the contract.
      An energy supply organization can carry out an additional re-verification of the reliability of the nodes in the form of electricity normative documents(confirmed sovereign bodies, but with them themselves). For all that, if not established by confirmed documents, they are illegal. Vimogi energopostachalnyh organizatsii shkodo usunennya vyavlenih vіdstupіv vіd vstanovlennyh norms in cases, not before the contract, nadsilayutsya spozhivachevі through naglyadovі organ.

      3. Vymogi be-yakikh organizations, i naglyadovyh, i energopostachalnyh, about vikoristannya chi zaboron vikoristannya whether any electrotechnical outbuilding chi apparatus є illegitimate. Can vikoristovuvatsya be-yakі pristroї that aparati, prepared for state standards or technical minds, we will confirm in order. It is also illegal to stosuvannya tієї chi іnshої schemes of electric circuits. Selected electrical installation, schemes rozpodіlnyh outbuildings and the configuration of the measure is carried out by the design organization for the weather from the deputy (operating organization). At the same time, insane vikonannya, wash the safety of electrical safety of people of that necessary category and the reliability of electrical supply of electrical appliances, up to the deputy head (powerman of the electrical installation) or other regulatory and technical documents.

      4. When zdіysnіnі technological arrival energy-intensive outbuildings to electrical tethers of obov'yaskovym є folded act of delimitation of balance sheet electrical tethers that act of demarcation of operational integrity of the parties. The cordon of operational viability is established by the favor of the intermediary of that energy-supplied organization. When appointed, it is possible to speed up the recommendations "Instructions for the supply of electricity to individual residential houses and other private spores." As a rule, the interoperability range is determined by the difference between the balance of the balance of the elements of the electric lines. Whether there is any way to the cordon of operational reliability, there may be security access to the personnel of both sides - a supportive and energy-supplied organization.

      Shanovny Oleksandr!
      We do not understand your request.

    Explain, be kind, who is the mother?
    The electricians made the introduction of the wooden budinok from the SIP stands.
    Fortified like a booth was installed on the wall; I don’t belong to the government. I want the new introduction to be mounted on the space of the old (dismantled) one, otherwise, take it in order. Chi can I wimagati vіd elektrikіv rerobit the introduction? Narazі it is necessary to scold the PUE, some vidannya, p. 7.1.34. At the booths, cables and darts with midwires should be installed.

    Good day!!!
    I have such a story - for three years the electricians brought light to the wooden booth with SIP wires, it was insulated and not covered up. To this end, in front of the entrance to the booth (about 1 meter to the booth), the man was lightly bared (about 5 mm naked) to connect the verstat. Several times they came with a re-verification, but no one did not betray respect, which once they came, the skin centimeter was re-verified. They blamed the order to put out this little one and we brought a lichnik on the facade of the house (the lichnik at the boudinka on 20 is already standing), they gave a month for the adoption. I have the same food, how can I use the exposed wire? It seems that it is possible to isolate and seal. Is it true? What are the other ways? І chi obov'yazkovo vykonuvat order?

    • Hello Galino!

    1. Guilty buti razrobleny pererakhunok for saving electricity: 3 years of victory for 24 years for the hardening of the mile.
    2. Return to life, come in to turn off the repeated damage, here you can be reminded that it’s always good - don’t steal! and everything will be good.
    If you want to save the guise: check all the messages in the account, if you write, if you are already online, then you will fight there, try to sue, pay a lawyer, and maybe not even a cool account (without GSM) to the modem, for example, if you asked this one.
    but instead of Article 165 of the QC - evil of trust ... I’m sure that you will victorious order and go to court so like V)

    On the little one, the installation of a SIP inlet at the wooden houses was ordered as a pardon for the installation of a vіdgaluzhuvachіv.
    The article states that SIP can be laid through the wall to the succulent.
    I have wooden houses, from the insulators on the stovpі to the insulators on the pipes, SIP is laid, from the pipes to the machine - with a medium cable VVG 2-6. For the installation of cables, standard wires were used.
    Is it necessary to change the entry?

    • Hello Volodymyr!
      Your feed has been redirected to . You can register on the forum and discuss in more detail "" with the participants of the forum.

    Suggest, be kind, how to replace the wire of the shield at the exit gate (lighter, automatic) to the apartment in the square bagatokvartirny booth? I know that the trochs are not on the topic, here about wooden houses write, well, so as not to complicate, write, be kind, nowhere I can know about those. Chi you can lay yoga on critical events(for example: at the corrugation, cable channels, metal hoses) what kind of obov'yazkovo at the strobe should be used for plastering?

    Good day. Introduction of CIP at the booths? Tell me about the GOSTs on the basis of what to do with SIP! Vinikli rozbіzhnostі z electrician gardening and priymach "Mіskelektro", introduced vikonan for the project: CIP - automatic - switch to mid - passing by the budinok - lichilnik - PZV. The representative of "Miskelektro" applies to DERZHSTANDARD and respects the work of the work, and the electrician of the gardening works on the introduction of CIP at the booths. Who is right. I'm calm.

    • Hello Stanislav!
      Your feed has been redirected to . You can register on the forum and discuss in more detail "" with the participants of the forum.

    How to correctly install the cable on the facade of the living room (large apartment building) panel booth) that energize the shop from the VRU of the booth? The VRU is to stand at the door, and the store is located at the same booth, only on the other side. On the right, in the fact that the old cable was laid along the footwell of the living house and there it was killed, and it worked at once on 2 phases, but was guilty on 3.

    • Hello Dmitre!
      Your feed has been redirected to . You can register on the forum and discuss in more detail "" with the participants of the forum.

As before, you have never had the opportunity to carry out electrical installation in private booth wire CIP, then after reading this note you will not become an expert in this field, we do not set it.

Then, if you check the electrician's quirks for the vikonannya tsikh robit, you will have a clear indication of those who can and can work and you can easily check the accuracy and correctness of the vikonannya robit.

Malyunok 1. Change old darts on SIP

Short summary of the article:

  • The main advantages of SIP.
  • Fittings for the installation of the introduction of SIP.
  • Rules for the introduction of CIP in the middle of the booth.
  • Permissible vіdstanі when installing the introduction to the booths.

In the private sector, before the appearance of CIP, the installation of repeated lines was cut to the limit aluminum dart by insulators.

So the submarines occupied a lot of time, the shards had to be seen between the wires, but not marveling at the price. strong wind they looked like coldness, urvishcha and short flickering, sometimes the equipment burned. Zagal nothing good. At once, for the wealthy bagmen of the private sector, we are changing the old electrical installations to the houses on the SIP. I will replace you with satisfaction!

Why at once do you need to work more electrically in the booth with a SIP wire (self-supporting insulation wire)? The replacement of the old technology from the zastosuvannyam not insulated drotu, which was creaking on insulators.

The main advantages of SIP.

First - tse nadіynіst. Yaki would not blow the wind and let the boards go, the electric introduction into the house was guarded from the wind and short chimes zavdyaki yakіsnіy and mіtsnіy іzolyаtsії zі zshitogo polietilenu. And the sintered winds of the special material SIP are protected from the sleepy light and the cracking of the insulation. Service term for 25 years.


Malyunok 2. Electrical introduction into the booth with bare wire and SIP wire.

Another advantage is simplicity and ease of installation. Everything is thought out to the last detail, there is a special installation fittings, zavdyaki yakіy rises above the installation and the need for hooks, insulators and traverses.

The third is aesthetics. Electric entry into the booth for help CIP looks richer beautiful, lower sound entry insulated with a dart. Do not psuє old look the facade of the budіvlі.

Fittings for the installation of the entry into the booths for the help of SIP.

Kіlkіst dart clumsily pokahuvat, vimіryavshi, vіdstan with a tape measure, otherwise, knowingly, knowingly stand between supports, as a rule, one sheds tse 30 meters. The minimum cut of SIP is 16 mm. Such a cut will be enough for a private booth. Like a great budinok, it is necessary to open up the vanity and choose a viable cut of the dart.


3. Fittings for SIP. Replace the dart from the stovpa to the booth.

To the support of that wall, the SIP booth is fastened to the anchor clamps (Fig. 3 a) two pieces are required.

The anchor clamps are fastened to the anchor brackets (Fig. 2 b), for which the anchor clamp loop is extended into the bracket opening and pulled in. Required quantity also two pcs.

On the I look at the wall at home anchor bracket can be fastened to the dowel of flowers and anchor wedge. On a wooden wall, you can fasten for additional screws. To the support, the anchor bracket is fastened behind an additional crepe line made of stainless steel, її type SIP-L207.

For the purpose of the CIP, those repeated lines are vicorous in the form of zatyskakh, or else they are called electricians “pierced” (Fig. 2 c), the stench will be safe on the bottom of the darts, whether or not they are overreacted. The contacts of such zatskach are protected from water and covered with a special contact paste.


Figure 4

SIP on the introduction into the booths can be like two or two so and chotirigine fallowly, depending on the voltage we put into the booths. If you put in a 220V booth (double-wire SIP), then you will need to bring two clamps, if you put in a 380V booth (chotir-wire SIP), you will also need a chotiri clamp.

Rules for the introduction of CIP at the booths.

Then, having stretched the span, SIP in the winding line to the wall of the booth, how to get the power supply into the booth, how to properly put yoga in the booth and how to varto robit the same SIPOM, or put the mid cable on the wall of the booth, and in the middle of the booth start the mid cable? Sob clearly rozіbratisya in given food it is necessary to turn back to the upcoming documents. The first ce PUE, in which it is not indicated that SIP is allowed to be laid in the middle of the room. Another document is DERZHSTANDART R 52373-205 in the name of which it is said that CIP is intended only for the installation of repeated lines. Prote zgіdno zgіdno z by this very GOST, clause 10.3 CIP, it is allowed to lay along the wall of the bud, but it is also necessary to secure that, according to combustible supports, it is possible to lay it in the corrugations or cable channels.

Vykhodyachi z ogo razumієmo, scho entering the booth it is necessary to work in such a way. On the facade, you will install a box, which is being sealed, of a street vikonnannya with a level of protection not less than IP65 in which you can install a 2-pole or 4-pole automatic vimikach (fallow voltage 220 or 380 V). Put a SIP on the machine and run a cable from the machine into the booths, for example, the VVGng brand butt with a cross section of 10 mm2. Passed the crisis to the wall, it will be necessary to reinforce the plastic or steel pipe. Nominal strum the machine is shorter than the vibrati on the screed higher, the lower strum of the machine installed at the entrance electrical panel.


Figure 5. Options for introducing CIP to the booth.

Ale, it is possible to enter into the booths without intermediary installation on the facades of the booths automatic vimic. I don't want to call it right. A lot of electricians and navit firms to rob the introduction itself. І controlling organizations accept this option for installation, without any reshuffles. Choose how to grow, it’s good for you. Ale, especially, I sound robiti all for the rules and more shiryayus to the first option.

Permissible vіdstanі when installing the introduction to the booths.

When installing the introduction into the booth with the CIP wire, to avoid the danger of the transport, what is passing, after the damage of the people electric jet, it is necessary to follow the rules of the PUE. In what way the necessary services are designated, so:


Figure 6. Changing the entry into the booths, the rules and allowable entry.

  • The height of the fastening of the darts on the facade of the building is not less than 2.7 meters.
  • Permissible sagging of wires at the length of the submarine up to 6 meters.
  • The distance from the support of the submarine to the main support is no more than 15 meters.
  • The distance from the submarine support to the facade should be no more than 25 meters.
  • Vіdstan vіd vіdgaluzhnoi support to the facade budіvlі trohi more than 10 meters.

On the little 6 on the support of data from the PUE, it is shown how to correctly enter the booth. If you are not inspired by the fact that you yourself get involved with this work, then it is better to turn for help to professionals, then to us.

You can also watch the first film about how to install an entry into a private booth with a CIP wire.

Like you never had a chance to win earlier electrical installation robots, then after reading these articles you will not become a fakhivtsy at this gallery, then here and do not put such a mark. Electricity introduction to the house due to work and deisno dosvіdchenі fahivtsі, professionals, no longer seeming about those who are simply not safe for life. Order here - date deep understanding, vіdomostі, yakі will help you choose the right material, improve your quantity. Until then, knowing the basic understanding, you can more competently control the quality of work and contractors, workers.

Otzhe, why is it necessary to work, vicorist SIP? Perevag bagatto:

Reliability and uninterrupted work - it doesn’t matter how strong the hurricane is on the street - your electrical installation is well protected from short flickering wires - SIP may be ok and to finish the insulation of the cores, prepared from a light-stable polyurethane shield. Zavdyak to this material, the insulation is not destroyed by ultraviolet (destroyed by the sony light).

Selection of special fittings SIP (not required hooks with insulators, traverses). Possibility of installation of a descent from the power transmission line, vikonan ї zvuchaynym, the old way of using non-insulated wires.

Electricity is advanced - and fire safety: at the time of cutting the line through the hit of third-party objects on it, nothing is damaged in the electric stream, which is isolated, and also there are short flickering through the sounding of the wires.

A greater aesthetically pleasing look is lower for the most significant non-insulated wires (for example, the introduction into the booth, especially the introduction - 380 V).

Durability. Service term CIP - not less than 25 years.

Required materials for mounting electrical introduction at private booths for help SIP:

SIP(The footage is awkward to measure yourself, for an additional roulette). For entry into a private booth, it is better to choose CIP 4 (previously called SIP 2A) - see without rope. Mustaches of yogo can have an even ceiling, the minimum ceiling is 16 square meters. mm, which is enough for the installation of electric power in a private booth.

Crying on a support and a wall, a booth SIP on anchor clamps(1), їх 2 pieces are required for installation

Anchors anchor brackets(2), push through the loop of the anchor clamp ("wedge") into the opening of the bracket and fix it. Obviously, anchor brackets are also needed 2 pcs.

You can fasten the anchor bracket to the wall of the house with dowels (it is better to fix the dowels O not less than 12 mm) or with metal anchors of the same diameter. On the support - with a special stainless steel truss stitch for SIP - L 207.

For the arrival of the CIP service to the airborne submarine, you need to stop vіdgaluzhuvalnі zatiskаі, "pierce" (3), so that the design of the contact plates from luden midi ensures good contact to wind darts in small gaps.

A large number of vidgaluzhuvalnyh zatyskakhiv lie in a large number lived SIPu. If the electricity that is introduced into the booth is 220 volts, then it is necessary to beat the two-wire CIP, in which case you need 2 pierce through the bellows (phase and zero explorer). If you put into the booths to fight at 380 volts, then you will have a four-wire CIP, which means that you need 4 pieces (3 phases and zero conductors).

Rules of Attachment of Electrical Installations (PUE) to fence the cable with aluminum conductors behind structures that burn. Tom, like wooden booths insertion through the wall must be terminated with a medium cable. Transfer from SIP to medniy drіt also vimagatime of supplementary vigilances.

To enter the booth through the wall, it is better to use a VVGng cable (non-combustible), which is introduced into the booth through a solid-wall pipe laid in the wall. The pipe to protect the cable from various mechanical troubles (for example, the siege of a booth), rodents.

With an irreproachable additional entry to the cable entry into the booth, the corrugated pipe will be put forward on the cable.

Join the discussion
Read also
Payment calendar in excel
Efficient promotion of advertisements for advertising Life cycle of the product
The horizon of financial planning is a period of time, between which it is possible to give with reasonable accuracy an assessment of financial indicators in the development strategy