Subscribe and read
naytsіkavishі
statti first!

Ikyi provіd vіd stovp to the lіchilnik. Strengthening the vulture to the dart on the stovp

Connecting a house to an electric meter, an important stage in the construction of engineering yards. It is right for the vikonan to introduce, as a rule, to live the life of electricity by stretching the successive futures of exploitation, so you should choose such a way to connect, which will ensure trouble-free energy supply to rich roads. Vykoristannya drotu CIP (self-supporting insulation wire) - safe delivery to the electricity supply with minimum vitrates. To connect the booth to the electric power line, you need:

  1. Submit an application and take it to the energy postal company of the technical mind.
  2. Keep the project connected to the technical minds.
  3. Vikonati roboti, assigned to technical minds. This will include a gasket redundant lines from the stovpa to the booth and the organization of the appearance of electricity.
  4. Take away the acts on the acceptance of the work and the delimitation of the vidpovіdalnosti, lay down the agreement on the supply of electricity.

Installation of the lined line with a SIP dart

For the supply of electricity, SIP-4 will be commissioned until the next day. Vіdstan vіd stovpa until budіvlі is not guilty of revisiting 25 m. On the step, for the help of a steel line, or in another handy way, it is installed anchor bracket, to what extent the wedge clamp is fastened for the vulture dart. Pіd'єdnannya vіdgaluzhennya to poіtryanoї іnії vykonuєtsya for additional zatiskachi, scho pierce. Have the same way, hold on until the morning hours. The bracket is fastened to the structure to be carried, and not to the sheathing of the booth. After the anchor wedge clamp from the side of the wake-up, the transition to the VVGng cable and the introduction to the wake-up date will be made.

Peretin lived on the SIP wire, maybe less than 16 mm 2. For rozrahunka recut, even if 16 mm 2 is not enough, wick the table:

Installation of fittings on the support of the submarine

The legitimacy of electric butt companies, about the installation of fittings on the stovpah of power transmission lines, is not without limits. The skin of the sides is applied to points and paragraphs normative documentation, scho often superchat one to one. Having left qі superchki to lawyers, in front of them, how to install an electric chiller on the floor, let's look at the main vimogi, which are presented with this method of installing an electric chiller:

  • a shield, installation of a courtyard (zokrema and stovpі), is guilty of protecting an electric heater from vіd vologa;
  • metal body of the shield may be grounded;
  • in the oblіkovo-rozdilny outbuilding, carried out under the cover re-grounding, that podіl zakhisnogo and working conductors;
  • at the shield, an attachment is installed to protect against impulse overvoltages;
  • right there, the bells and whistles are installed fittings, which surround the maximum tightness, which is comfortable.

Such a way of installing lichilniks, calls to save the distribution of electricity, make it easier to control the supply of electricity from the side of energy organizations.

Installation of a sip cable from the stovp to the booth in that direction, if it is necessary to enter power cable I will wake up in the morning. Before the beginning of the budіvelno-assembly work, design documentation is drawn up. He has the necessary fatigue, technical characteristics darn, the technology of installation of that norm has been selected safe operation. The more pedantry to show the alarm clock, the less risky you will be in your life and health.

Technology advances: tensioner for SIP

Dosvіdchenі that not even budіvіlniki zavzhdі zavdіyut respect for the positive and negative sides of any technological solution. If you want to come in about SIP, why are you samonese to isolated darts first, on which they give respect, they lived on aluminium.

Zavdyaki tsomu, the system of the lesser world is shy to the ruinous inflow, the nature has come and brought insignificant sagging and tightness.

Isolation coating can be confirmed by a way to increase resistance to aggressive media and frequent temperature fluctuations.

If you talk about other things, then the stench looks like this:

  • Zruchn_ installation;
  • Ease of maintenance;
  • Possibility to protect the area necessary for laying a high-voltage line;
  • Maybe a few days without shkoda for the integrity of the insulation can be found on supports under direct sleepy promining;
  • Guarantees for the term of exploitation become less than dozens of years.

On the basis of the forged steel, it was understood that the technical characteristics of the vicorous tensioner are due to the fact that the virobnik declared at the CIP-cable. Budіvelniki zі experience do not recommend namagatisya zaschaditi, іnakshe the actual tightness of the cable zmenshuvatimetsya, scho provokuє shvidka znoshuvannya.

Let's get started: installation of the SIP cable on the steps

Good having recommended a cable 4x16, to that, for the technical contra-indications, it is possible to stretch it to yoga itself. Since only all the power supplies with the cable were successfully broken, the next step was to select the technically correct fittings. Here, folding, even newcomers, it is important to introduce one kind of other. Just ask the situation to help understand the whole process.



They stretch and fasten the house to the wall for help and a few anchors. If you are talking about stovp, then there is a trace of creaking from the victories of the bandage stitch. Why is it obvious that the mother is responsible for inserting the anchor.

Krym tsgogo, we won’t tell you about other nuances:

  • It is recommended that vicorists be used for marking GHP-12;
  • In order for the wiring not to shake when strong wind, like a dodatkovy fixator of the bandage stitch, vikoristovuetsya budіvelne skriplennya;
  • The winch appears to be superficially fixed, like a fixing element, there is a tension clamp at the kilkost of two alone;
  • Zatyskachy due mother marking TTD151/NTD151.

Preservation and respect to the point of drіbnits allow for impersonal problems at the stage of practical operation. In order for the robot not to have a chance to get zapped, it is necessary to change the appearance on the fasteners and staples of the necessary marking.

Dotrimuёmosya rules: how to pull the drіt mizh stovpami

Chinne legislation fixed allowable size sagging cable at different operating minds. For example, above the pіshohіdnimi paths the cable is laid out at least at a height of 3.5 m-code.

If the cable sags lower, it is necessary to independently correct the situation. Before the ear of the cob, it is necessary to perekonatisya, that the line is unstripped and grounded.

Having perekonavshis, scho dіlyanka, sho being repaired, no more rebuvaє pіd naprugoi, sіd vydalіt all zvnіshnі factori, scho provoked the problem, for example, felled tree.

  • timchasovo turn on all inputs;
  • Stretching is carried out by a non-insulated aluminum conductor;
  • It is necessary to connect with the line, which is being repaired, for an additional bandage;
  • As soon as the norm of tightness has been renewed, you can reconnect to the fence.

Bezpeka that pilnist - two words, yakі nebhіdno vichity. Zalezhno vіd ekspluatatsіynyh minds іsnuyut norms sagging cable. Like a coristuvach, remembering the recovery, varto negainoly correct the situation.

Note to beginners: installation of SIPu from the stovpa to the booth

The procedure does not require solid knowledge or higher-specialized knowledge. Golovnya - Suvoro dotrimuvatsya rozroblennoy plan. Of course, cable pulling is only possible after the weather of all the nuances from the sovereign operating authority. “Amateur activity” will no less cause a hefty fine, or you can make an invalid wake-up caller inadvertently. Mustache robots, connected with electricity, have a front connection.



As soon as everything is ready, you can boldly proceed. For the cob, it is necessary to reconsider, so that the wiring may need a recut of 15 cm.

Alarm clocks with experience tell you that it is possible to take a less suitable one, and not far away similar to the required one.

Vikoristannya drotu, which vaguely vibrates with the plan of parameters, provoking an electrical injury or a short flicker.

The further order looks like this:

  • Know the zatyskach for fixing the vіdgaluzhen on the stovpі;
  • The process of mounting fixators with your own hands is not too foldable, but it will require maximum concentration of respect;
  • To carry out a freeze in the distance from the stovp to budivl - even though it was more than 25 m, it is necessary to install one more support;
  • It is necessary to fasten the tensioner;
  • Perekonatisya in the fact that the elements of fastening can hang on the surface of the stoup;
  • On the outer side of the booth, where the LEP is brought in, the anchor fixer is fixed;
  • Before cym, it is necessary to perekonatisya, that the number of phases and zatiskachiv vіdpovіdaє one to one;
  • The process of finalizing the isolation is being completed.

Installation of the SIP droto on supports (video)

Navis and fixation of the SIP-cable is carried out on the basis of the approved project, which is approved in the energy supply organization. Only in this way, the buddy-assembly robots do not violate the dignified legislation and pull after themselves promotion of insecurity for life that is healthy. When choosing a dart, that strength is repaired by a number of phases, the tightness is transferred, and that stands between the remaining support and that of everyday life.

Join the discussion
Read also
Like the signs of the zodiac fit one to one at the kohanna - a horoscope of wisdom
Yak formed a share of the show's wives
We didn’t check the wedding: how to live the finalists of all seasons of “The Bachelor Maxim Chernyaev and Maria Drigola”