Prokhіdnі vimikachi allow cheruvati one model of lighting equipment (lamp, chandelier, floor lamp) from a large number of applications, moreover, you can work one hour at a time. It is important to know how to connect the passing vimikach, so that all the lamps worked correctly. For which sled vikoristati vіdpovіdnі schemes.

Passage vimikaci - an indispensable option for private booths, for those planned, a sprat of space was added, spread out on different surfaces. Wiring schemes can be selected for large apartments, installed according to corridor type plans. To overcome such options, one can see not only efficiency, but also the ability to speed up the supply of electricity: the light burns less where it is needed. In other applications, lighting is not switched on normally and energy is not used.

Connection of passing vimics at the rose box

Passing vimikachi are introduced in standard models with such features:

  • Three contacts have been transferred to their designs, for example, typical models, which have two contacts
  • The possession allows you to quickly change the "phase" of another or third contact from the first.

Important! The functions of the light bulb, for the minds of a powerful circuit, can be used for fluorescent, light-emitting diode, energy-saving and other lamps. It is noteworthy that the scheme can be victorious within the framework of the connection of the venture, practically of any type, the management of which is carried out from different business enterprises.

rozpodіlnik of a group of prokhіdny vimikaciv

Connection scheme: 2 months

Tim, who squeals for food, how to connect a passing vimikach, the connection scheme for 2 months is especially correct. As a matter of fact, the process practically does not follow a similar scheme, which works like a standard type. The main vіdmіnnosti lie in the offensive:

  • Zalna number of terminals of contact type
  • A lot of darts, as it is necessary to bring them to possession.

Important: the connection of a pass-through vimikacha is required for three wires and for the same number of terminals. Necessary wire from the trio with veins, which will be necessary to be carefully stretched to the vimikacha directly from the box.

Scheme of caring for a group of passing vimikaci from two elements

Within the framework of this connection scheme, a box of roses was placed, and the passages of vimikachi are also won in a quantity of two pieces. At the box, as it was planned to be bigger, next to hold darts, like to lead through the chandelier of another lamp. In the vimikacha, darts are stretched out from the trioma with veins. The connection of a passing vimikacha for the scheme for two months may be on the side of the vikoristanny of the phase droid. It is recommended to take care of the vikonnannya robit at the onset of blackness:

  • The type of the soldering box type phase wire extends to the point of contact input on the first switch
  • Contacts are fixed on the wires, which can be drawn from other such contacts at the design of another behind the vimikach's rhunk
  • The input contact of another vimikacha comes to the door of the floor lamp, sconce or another lamp installed at the reception
  • Provid, scho zalishivsya, fixes on zero, moreover, robit tse without a middle.

Important! Peretin drotu from trioma with veins should be selected, focusing on the tightness of the light-technical possession. If it is necessary to connect a sprig of workers for the care of lighting equipment, it will be necessary to add a vimikachi of a cross type. The scheme of roz'dnannya passing vimikacha in this type is not spratsyuє, and even vikoristovuєtsya kolka kontaktiv, and the wire may have a vague number of veins.

Management of two areas of business

Connection scheme: 3 months

In this vipadka vimikaci of the standard type are selected. The stench is installed in the rest of that first division of management. Tim, whoever wants to know, how to connect a vimikach, a scheme of this type is guilty of being sensible. It’s cheaply foldable, the lower connection scheme is three places, but it’s possible to sort out your specifics. Apparently before her, cross-bridges should be installed on the plots, which were left behind, not on the rest and not on the first.

Scheme of connection of three passing vimics

The number of clerks for the management of lamps may be. Їхнє the number of deceitfulness z'ednannya in the box rozpodіlu, and even before it, more darts will be brought. In this case, it will be necessary to have them correctly and in order of marking. Otherwise, blame the risk of not getting into the wires.

Works with the installation of a passing vimikach, the scheme of which does not seem to be folded, is conned with such a blackness:

  • Two contacts at the exit, roztashovani on the first switch, are fixed on the wires, so that they are brought to the bet at the entrance of the cross-type element, stepping on the rachunka. This stage is repeated doti, the docks will not arrive the remaining element behind the rachunk
  • The glowing contact of the remaining element is connected to the wire leading to the floor lamp, lamp, sconce.
  • The phase type conductor is connected to the contact at the input of the structure first behind the vimikach chamber
  • Another wire of a lamp, a floor lamp or other lighting equipment is fixed on the spacer of the zero box.

Important! Before the skin element of the pass type, it is necessary to carry out the veins from the tryoma. Before the cross vimikachiv, darts from chotiriokh veins are brought.

Important moments

How to turn off the passing vimikach, turn on yoga - turn on the power supply to give theory, practice. It is necessary to clearly understand, for some principle, the schemes are proponated. At the borders of the skin of them, the backs of one of the elements themselves:

  • Vimikaci pass-through type;
  • boxes;
  • Conduct, that at the singing stages they are replaced by cables;
  • Lumpy.

The first scheme is taken into account in the simplest way. According to them, it is easy to understand how to grow a passing vimikach: zero wire led from the power supply to the lighting equipment. In addition, wine should be placed in a box. Phasny drіt tezh tudi fit in, but only through it without intermediary to contact. All contacts can be connected with each other. The phase is coming from a deep contact. The other scheme is cheaply foldable, the opposite is just right.

A simple wiring diagram for a pass-through vimikacha

Installation of vimikaciv zdіysnyuєtsya one hour with the installation of the box, in the yak are carried out cables to the dzherel of electricity. At the box їєєdnutyut, keruyuchis selected scheme. It is important to remember that the installation board must be selected correctly, depending on the characteristics of the cables, including those with a long life.

Join the discussion
Read also
Differential automatic machine: connection diagram
Yak right s'єднувати дроти?
Wire marking color