How to make wiring in a booth with your own hands: why start and how to finish

During the rest of the capital, that dacha life became even more popular. A lot of housekeepers vvazhayut for the better creation of the houses of their dreams with their hands, not going to the services of firms.

Without electricity, the life of a modern person is inconceivable. To this, the electrical safety of the life is the first head of the housekeeper.

People, who have tried to call the budinok with their own hands, are struggling with the need for this electrification. So buvaє, scho in іsnuyuchomu zhitlі electrical wiring in the arc of the filthy camp pіdlyagaє zamіnі.

Let's take a look at all the nuances of connecting a life to an electrical grid, installation of electrical wiring of various types, we will reportly expand pardons, so that they can be unique in practice. Also, the article will have instructions on how to put the wiring into operation and recommendations from popular food.

Regardless of whether you want to plug in a new house, or restore electrical safety in the old one (for example, when you change the wiring), you happen to know a lot of bureaucratic procedures. For withdrawal, I will need:

Folding wiring diagrams

Start installing the wiring in a private booth with your own hands, the best of the basic electrical. It is important to make it easier to further expand the windows of stained glass materials and the appointed place of the installation of power elements.

In the scheme of carrying out the following elements are included:

  • Leading from the nearest support to the incoming electrical panel
  • Introduction /
  • Internal electrical panel from the groups of supporters:
    • Rozetkov group
    • Lighting
    • Power group (high-current on-button equipment (boiler, cleaning machine, typesetting)
    • Gospblok (garage, basement)

Scheme, how to properly conduct that electrical wiring in a private booth with your own hands:

On the skin of these groups, okremi ELV / automatic are installed.

Also, when folding the scheme, it is necessary to use a mother’s plan for a booth, for which it means directly laying cables and installing sockets and vimikachiv.

Dobre, for example, the wiring of the mother has two okremі circuits. Then you can turn on one for repair, and the other - supply the necessary lighting or soldering equipment.

From these data, there will be a principle scheme, a wire harness cable, a necessary skin break, placement of power elements, adjusting the appearance, place of introduction of life-giving cables.

What is needed

Try to get yourself together, as if you were doing it yourself and conduct electrical wiring in a private booth. In order to conduct electrical wiring in the booth, which complies with all SNIPam and safety standards, such materials and tools are needed.

Glassware materials

Necessary tools

  • (Bulgarian with diamond discs)
  • chisel assembly
  • Hammer
  • Cable cutters
  • Putty knife
  • emery grater
  • Pasatizhi
  • Roulette
  • screwdriver

Selected from the total quest. The average price is 0.5-0.9 square millimeter per 1 kW of pressure. The best vicoristovuvaty midny rich housing provіd. Win is shorter twisted, elastic, stable to short-term vanity.

The number of sockets, vimikachiv and other elements are covered under the hour of ordering the schematic diagram. It is better to take boxes and boxes from self-extinguishing or non-combustible materials.

Fastening of the conduction is easier to carry out under the plinth, and not at the strobi. Such a position of the cable does not include getting into a new drill or during the repair work, before the new one, access and re-wiring and re-commutation is possible.

Video, how to properly work and conduct electrical wiring in a private booth with your own hands:

Pokrokova instruction for installation

In different booths, a different type of wiring is recommended. At the trees, it is more common to shy away, and in concrete buddies, from the impersonal technological voids, it is attached. Let's take a look at the nuances of installing and conducting electrical wiring at a private booth with your own hands.

Vidkrita (calling)

Often vikoristovuєtsya at the zamіskih wooden boudinkas. It can be used as in special boxes, under skirting boards, as well as in, from a special cable and on porcelain insulators-fixed, which fix vertical elements.

To conduct electrical wiring in the booth, it is necessary:

closed

It is easier to assemble. To attach cables to the walls, it is necessary:

  • Razmіtiti walls for the help of a rose cord
  • For the help of a grinder, cut grooves 2x2 cm at the walls
  • With a wall chaser, you can see the installation of rose boxes, vimikachi and sockets
  • Install the boxes and sockets. Fix them with asbestos or screws from dowels
  • Prime the grooves
  • Get them a cable. In front of yoga, it is necessary to cut into pieces of the necessary dozhini
  • Fix yoga at the canal with plaster. Croc fastening - about 40 cm
  • After 20-25 years, if the plaster is dry, clean it
  • Install vimikachi and sockets

Axis and all clumsy cuts necessary for hand-held electrification of the core.

Pokrokova video-instruction on how to conduct electrical wiring in a private booth with your own hands:

Fittings installation

In a fashionable line of retro conductors of a type of fittings, the fittings can be highly manipulative. Crimson vimikachiv and sockets, porcelain rollers-insulators are installed there. Creepiness of leather with accessories

  • Insulator rollers: 10-12 cm one side one
  • Single-core torsion wire - 1 centimeter in the wall
  • Sockets: not less than 35-40 cm from the bottom and not less than 15 cm from the kitchen table
  • Vimikachi - from 50 to 150 centimeters

It is not possible to install vimics and sockets on the same level. The same rule applies to the wiring of the attached type.

Safety rules, pardons and ways to escape

Some housekeepers are not good at nuances, or they allow pardons due to negligence, which can seriously impinge on fire safety. We look at the most popular of such pardons and ways to get away with them.

  • Aluminum darts. You can't win at any time. The stench of crying and can break off when replacing the socket or vimikacha. Better to pay more dearly, but take midny.
  • At the attachment of the conductors, vicorist and rich-core darts are fenced. Klema does not do a good job of trimming such a cable, which creates a point of constant heating. Tse mozhe bring up the rosette / vimikacha, so until the fire.
  • Do not strike between yourselves darts from various metals without intermediary. To get rid of the oxides, to work the chains through the terminal, to make a possible metal contact.
  • Waterproofing. It is impossible to avoid it in the places of advanced water: bathrooms, kitchens, closets, terraces. Її vidsutnіst can become the cause of an electric jet strike.
  • Razmіchayte dozhina drota with maximum accuracy. Put twisting on straight plots, especially if you don’t hang 10-15 centimeters, categorically fenced!
  • Shtroba pіd groove. Її depth may be 2-2.5 centimeters. There is no sense to run the cable deeper, but to smooth the groove smoothly plaster.
  • . The stench mayut buti roztashovani practically under the stele. It is necessary to fight for the integrity of the maintenance of the wiring, so that the cables of various recognition are hidden.
  • Drank pid provid. The stench can be strictly vertical and horizontal. It is possible to save a cable with a diagonal laying, you can bring it to a new drill or color for an hour of repair or repair work at the booth.
  • Crossing the wire. It is not guilty to be over thin. Thin darts do not show the increased ambition, but they burn. For the rosette group, the optimal span is 2-2.5 mm, for the lighting group - 1.3-1.5 mm.

I troch about safety equipment. Work with home electrics less when there are traffic jams. Striking with a strum can lead to the deepest legacy.

Re-verification and commissioning

After re-installation of electrical wiring you need install all planned automatics, ELVs and electrical appliances. After that, kindly ask a specialist for energy supervision to check that the commissioning of the electrical equipment of your booth.

Priyomo-building testing of your object owe to be completed by the witness of a positive wiring for the safety of the electrical installation, the ability of a distant victorious possession. With the "Act of admission to connection" you should turn to the energy supply organization. On this basis, it is your responsibility to connect your object to support and lay down an agreement on the assignment of services.

Do not save on window materials and tools - even if in the future, the robot will become a guarantee of your peace and comfort.

Zrobit in the booth electrical wiring by powerful forces on the right is clumsy, but it will require respect and scrupulousness. If you come to the point, do it right, the wiring will serve you a lot of years and will be guaranteed to be safe.