Subscribe and read
naytsіkavishі
statti first!

How do you generate electric heat for the supply chain with your own hands?

The heat of the electric heating system is often used today for heating the coverings for heating the bathrooms, stairwells or on the balconies.

1 Methods of installation of heat and water

A wide range of systems makes it easy to install electric.

Speaking of those, how warmly you choose, next to know, that everything is stale due to financial possibilities, special skills and minds for the installation of the structure. Follow the respect and use of electricity: if you allow it, you can choose the electrical design. There is a long term of service and it is easy to install.

Today, there are a few methods for installing such a system. The main ones are:

  1. Pouring a thick ball of screed and laying it away for a pidlog.
  2. Installation of the structure over the screed under the ceramic tiles.
  3. Installation of plivkovy pіdlogi. In this situation, it is possible to install the system directly under the cover, without pouring the screed.

What is the best method of installation to choose? The first way you can win at the vipadka, as it is necessary to heat the living room, bathroom, kitchen or balcony. Here it is necessary to install a cable type system. Under the construction, it will be necessary to lay an insulating ball. A screed of a small tovshchina is poured from above.

If it is under the apartment, in which it is planned to install a scorching system of a similar type, є scorching installation, a cable system can be installed directly under the tile. In this case, it will not be necessary to lay thermal insulation for warm underlays and install material on the screed. A ball of tile bag, what to glue, and ceramic tile building vіdmіnno protect the elements, like they will be heated. However, it is necessary to consult with facsimiles, or look at the information on the packaging of the system, in order to determine whether it is necessary to install thermal insulation for a thermal installation of this type.

If it is necessary to heat up the underlay, as it is covered with a laminate, and the robots, tied from the replacement of the screed, carry out a lot of work, then it is recommended to vicorate the system of infrared underlays. In this case, it is necessary to lay a ball of insulating material in front of polyethylene on top of the main screed. After that, the installation of electrical elements is required. If necessary, you can add a ball of waterproofing for a cover.

Today for sale you can know the following types of heat supply systems:

  • cable;
  • cable from mesh;
  • plivkova (іnfrachervona).

Many people don't know how to choose the correct system. It is not allowed to know that the infrachervo design was vicorated at the vapadka, as in the room for covering the lining of the vicory tile was not allowed. It is not necessary to mount such a construction under a screed, it is laid without a middle under the cover for the underlay.

To install a heating system for a cable or any other independently, it is necessary to prepare:

  • regulator;
  • temperature sensor;
  • a set of the system that consists of a heating cable, grids for heating materials;
  • darts for the raising of the elements that are being restored;
  • fastening details;
  • attach to the zakhistu;
  • cable from midi for grounding.

2 How to subdivide the components of the system on the surface?

We need to lay down the foundation plan. Robiti is necessary on paper. Varto vrahuvat, scho cable for heating or electric mothers are not guilty of being installed in places, where there will be ironing elements or other accessories. In areas where heating tubes or other attachments are burned, it is necessary to prepare a buffer zone. All the elements of heating will have to be turned off. All electrical elements and heating sub-logs heat up at the same time. If there are alterations in looking furniture, the components of the system may be mishandled, as a result of which the system needs to be repaired. Furniture can suffer from overheating in any weather.

The result may have an incorrect shape. According to the contour of the figure, which appeared, and in the middle of it, it is necessary to install elements of the heating system of a similar type. The reason for this is the lack of such a design, so rearrangement of furniture elements can negatively affect the operation of the system.

Zrazkov cable laying scheme is shown in fig. one.

For skin application, it is necessary to work an okremic contour, so that the stench is practically not demarcated. At the skin application, an oxalic regulator is installed and eating is re-introduced. If it is planned to fill in the screed between the elements, then on the basis of the underlays it will be necessary to lay a damper line.

If the plan is folded, you will need to transfer yoga to cover for submission.

The bagman’s place on the wall needs to indicate the position of the element to regulate the system. Here, the next step is to open the box and lower the shtroba vshchent. After that, as there will be vicons and preparation workers, it is necessary to vikonate, so that the necessary quantity of materials will be provided.

3 How do I need a lot of elements?

Rozrahunok potozhnosti elektrichnі ї konstruktsії similar type can be built for the help of the table, pic. 4.

At the same time, it is possible to make a selection table for the selection of the heating system. For the purpose of rozrahunka of thermal inputs, it is necessary to take care of laying the cable, as well as to rozrahuvat yogo dozhina on the skin room.

If it is planned to install an infra-red system, then it will be simpler to install a heating system: you need to pick up a number of elements that you need to stitch for covering the required area. In rozrahunka it is required to turn the cable for connecting the system regulation element, as well as the cord for connecting to the regulator. It is important to know that it is not allowed to connect warm water directly to the outlet.

Vyhodyachi z rozrahunkіv and nayavnoї ploshchі vsіh prismіschen nadobobіrіti zagalno vіdnіnі v zdatnіvі vtrimuvat sіbіbnі vаntazhennia.

4 How do you prepare the foundation?

The old screed ball can be dismantled, with which the base will need to be cleaned.

Further laying of waterproofing. The material is to be found on the wall by 10 cm. It is necessary to fasten a damper line along the entire perimeter of the surface on the wall. This element will give the possibility to compensate for the extension of the logs in the heating process. Then, excess waterproofing material and laid lines are formed.

Sob the energy of heat did not go down, you need to visconate the insulation of the foundations of the underlay. Insulation needs to be chosen depending on the type of heating, placement of the scorching stone and the type of foundation. It is important to lie like this:

  1. If the heat is already warm, it will vikorate as an addition to the obvious system of singing, then as a lining it is possible to seal the backs of polyethylene, covered with foil.
  2. For apartments where opalous accommodations are placed, polystyrene foam sheets of approximately 3-5 cm are suitable.
  3. As warm as possible, it will be placed on the balcony, which was not previously singed, it is necessary to form a capital insulating ball, which is formed from polystyrene foam up to 10 cm.

It is necessary to install a grid over the insulating material. If there is no similar element, you can add a plasticizer to the sum.

The cable type at the rosette can be shown in fig. 2.

5 How to install such an attachment for heating?

Permissible expansion of the cable support with passport data is 10%.

In this case, there are 2 mounting options:

  • attaching the cable to the grid for additional screeds;
  • fixation of the cable behind the additional line for fastening.

As the structure is mounted near the bathroom, it is necessary to ground the grid under it and bring the ground to the element for regulation of the building.

Infrared construction needs to be laid on top of the insulation. In some cases, virobniks need fixation with adhesive tape, or for help, the ears on the male.

Infrachervona electric heat supply with your own hands is laid behind the diagram, which is shown in fig. 3.

In places where the cable passes over the line under the two overlapping plates, you need to put it in a cut corrugated tube, the length of which becomes 12-15 cm.

Clips, with which all the elements of the structure for heating are connected, you will need to heat the concrete screed.

If all the components are in their places, it is necessary to re-verify the operation again. At what stage the design can be improved.

If you need to hang up the handset if you want to control the gate. Її kіnets is guilty of roaming between the cables next to the cable. It is necessary to insert a temperature sensor at the tube, for the help of which the structure will be adjusted.

At the next stage, the entire system will need to be upgraded, after which the element for regulation is removed until the completion of the maintenance work. Let's pour the screed. If it's dry, then rewrite the robot's constructions and install the sublogs.

It’s not easy to build the electric heat of the log with your own hands, it’s not necessary to know the sequence of actions and dotrimuvatsya technology.

Join the discussion
Read also
Differential automatic machine: connection diagram
Yak right s'єднувати дроти?
Wire marking color